7 Brighton 5 Place
Brooklyn, NY 11235BBL 3-08665-0503Map
Owner of record: 2954 Owner LLC
7 Brighton 5 Place is an elevator apartment building built in 2025 in Brooklyn, 11235. It has 22 residential units across 5 floors. The owner of record is 2954 Owner LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 1
- ECB violations
- 13
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 1
- Construction other optional
Borough commissioner has ordered all work stopped underpermit #b00996246-s1 on 10/5/2026. due to construction superintendentwithdrawal. unable to determine percentage of completed work.
Oct 8, 2026
Dob violation - active
ECB violations · 13
- Class - 1
Bc 3301.2 inadequate safety measures at time of inspection observed worker on unsafe supported scaffold at balconies and at interior worker not ties off and no fall protection no guardrails. stop all exterior w
Aug 5, 2026 · Penalty $5,030
Active - Class - 1
Bc3314.1 at time of inspection observed supported scaffold installed at exp# 3 balcony and interior planks loose not tied down. scaffold not anchored to structure missing cross-brass and mudsill no guardrail sy
Aug 5, 2026 · Penalty $5,030
Active - Class - 2
During my inspection and upon reviewing dob now and bis system reveal ssm / ssc/ cs michael spinella using his license on designated permits b01086106, b00805221 and including b00996246 not in compliance with c
Aug 5, 2026 · Penalty $2,500
Resolve - Class - 2
Gc-625238 at 5:15am observed 5 story building with sws that was not illuminated as stipulated in bc3307.6.4.8 creates hazardous conditions for pedestrians of slips and trips due to inadequate lighting in dark c
Feb 25, 2026 · Penalty $10,000
Active - Class - 2
Observd jobsite w/debris chute installed @ expo#3 balconies missing tiebacks and angled w/ additional supprts @1st flr contrary to approved dwgs. chute access beyond protection. request for workers protection m
Nov 20, 2025 · Penalty $2,500
Active - Class - 2
Observed active jobsite w/ unfinished facade, unfinished roof, incomplete parapets all less than 20ft away from unprotected adjoining property windows at exposure #2. visible concrete splash marks on several wi
Nov 20, 2025 · Penalty $2,500
Active - Class - 2
Observed active jobsite w/ construction fence erected at exposure #1 missing 1-1/2 m sch. 40 pipe kicker clamped to 3m sch. 40 pipe contrary to the appro ved plans. condition could lead to displacement of f
Nov 20, 2025 · Penalty $1,250
Active - Class - 2
Job site fence not constructed or maintained pursuant to subsection. corrugated galvanized construction fence approx. 15 linear ft and supporting metal post loose and leaning outward., comply with code
Mar 28, 2025 · Penalty $5,000
Active - Class - 2
Job site fence not constructed or maintained pursuant to subsection. observed a 10 ft high metal fence is loose/ open at rear, viewing panel open and fence gate leaning at front of lot., comply with code
Dec 22, 2021 · Penalty $500
Active - Hazardous
Sec.27-1019.failure to provide removal of waste materials.upon insp noted.there are piles of waste materials bricks,wood,lumber,30 yd.no work in progress since 12-29-06.remedy:remove & storage waste &
Apr 10, 2007 · Penalty $2,500
Resolve
Show 3 more ↓
- Hazardous
Failure to provide removal of waste materials.upon insp at above property bldg was part.demolished and noted:there are accumulation & 30( )yard of combustible waste materials on site & was not removed since 2/
Mar 9, 2007 · Penalty $5,000
Resolve - Non-hazardous
No general contractors sign.job site has no contractors sign posted.demo on progress(debris,slab in place),no signed off.remedy:provide contractors sign
Feb 6, 2007 · Penalty $1,000
Resolve - Hazardous
Failure to provide 24hr notice.upon inspection @ above address bldg demo to 2fl. start date requested by contractor was 3/22/06 last inpsection provided on 10/05/06 indicated no start of demo work.
Oct 11, 2006 · Penalty $2,500
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 2025
- Floors
- 5
- Residential units
- 22
- Building area
- 18,276 ft²
- Lot area
- 7,200 ft²
- Zoning
- R6
- Community board
- 313
- Council district
- 48
- Block / lot
- 8665 / 503
- Assessed value
- $486,450
- Landmark / historic district
- No
Questions about 7 Brighton 5 Place
Who owns 7 Brighton 5 Place?
The owner of record in NYC Department of City Planning PLUTO data is 2954 Owner LLC.
Does 7 Brighton 5 Place have violations?
NYC HPD has no housing violations on record for this property.
Is 7 Brighton 5 Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 7 Brighton 5 Place built?
City records list 2025 as the year it was built.
How many apartments are in 7 Brighton 5 Place?
It has 22 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.