2946 Brighton 4th Street
Brooklyn, NY 11235BBL 3-08663-0270Map
Owner of record: Brighton Four LLC
2946 Brighton 4th Street is a walk-up apartment building in Brooklyn, 11235. It has 6 residential units. The owner of record is Brighton Four LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 8
- ECB violations
- 10
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 8
- Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - active - Construction other optional
C-construction other optional
Jun 8, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 13, 2008
Dob violation - dismissed - Construction other optional
Borough commish has issued a 10 day letter of intent to revoke appl. 3 01866363 on 1/31/08 remedy: stop al work immediately contact 718 802 3 685 prior to rturn to work 60% completed
Feb 15, 2008
Dob violation - dismissed - Construction other optional
Borough commish, has issued a 10 day letter of intent to revoke appl #301866363 on 1/31/08 remedy: stop all work immediately. contact this office at 71 802 3685 to return to work work 60% complete
Feb 5, 2008
Dob violation - active
ECB violations · 10
- Class - 3
Job#301890586/a2/dwgs dated 4/14/11 noted 1)roof found 2 drains plan and schedule bu shown 3 drains 2) 4th floor private terrace installed 3drains not shown on plan and schedule b 3)plumbing plan it not complet
Apr 27, 2011
Resolve - Hazardous
Failure to maintain: jobsite fence (wooden) leaning onto public walkway. also walking @ side of premises in a state of disrepair & a danger to pedestrians. remedy: make all repairs in a safe manner.
Jan 3, 2008 · Penalty $2,500
Resolve - Non-hazardous
Jobsite fence defective: note: 1)large gate at sidewalk swings outwardobstructing sidewalk when open, & does not comply with dob jobsite fence spec. 2)missing & open sections at right side & loose, unsecured se
Apr 21, 2006
Resolve - Hazardous
Failure to protect & safeguard public & property affected by construction operations. noted at right side on constr. site- damage to adj. property; curb- retaining: wall also rear adj property retaining wall fa
Dec 13, 2005
Resolve - Hazardous
Failure to comply with stop work order. noted: approx. 500 square feetof concrete forms installed against stop work order issued 12/06/05. work is located at north west corner of site. stop all work! remedy:
Dec 13, 2005
Resolve - Hazardous
Failure to provide protection at sides of excavation.hazardous.noted:excavation at north side of property line has collapsed approx 40 percent of adjacent driveway into site.(dig approx 5 1/2' deep).temporary
Dec 6, 2005 · Penalty $1,000
Resolve - Non-hazardous
Failure to drain excavation site. noted: upon inspection north-west pool is 65' length x 25' width 6' ft deep, south-east pool 5'x 5' also 6' ft deep. failure to reconnect sewer line for 25 brighton 3rd lane.
Oct 17, 2005 · Penalty $400
Resolve - Hazardous
Failure to protect adjoining structures during excavation operations:noted: 6' deep excavation at northwest rear corner undermined wood frame/tin surfaced garage partially collapsing wall into the site and buck
Aug 31, 2005 · Penalty $1,000
Resolve - Hazardous
Failure to comply with stop work order. noted: full crew working at site forming footings at northwest corner of property after inspector hemmings issued stop work order on 08/29/05. stop all work. remedy:compl
Aug 31, 2005 · Penalty $1,500
Resolve - Hazardous
Failure to safeguard public and property affected by construction operations. construction work being done under job #301866363. sewage lines displaced under ground attached to adjacent properties. stop all wor
Aug 29, 2005
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- —
- Floors
- —
- Residential units
- 6
- Building area
- 8,000 ft²
- Lot area
- 3,200 ft²
- Zoning
- R6
- Community board
- 313
- Council district
- 48
- Block / lot
- 8663 / 270
- Assessed value
- $703,355
- Landmark / historic district
- No
Questions about 2946 Brighton 4th Street
Who owns 2946 Brighton 4th Street?
The owner of record in NYC Department of City Planning PLUTO data is Brighton Four LLC.
Does 2946 Brighton 4th Street have violations?
NYC HPD has no housing violations on record for this property.
Is 2946 Brighton 4th Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
How many apartments are in 2946 Brighton 4th Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.