roofy

9402 Avenue L

Brooklyn, NY 11236BBL 3-08259-0033Map

Owner of record: Aqsa G LLC

9402 Avenue L is a mixed residential and retail building built in 1931 in Brooklyn, 11236. It has 1 residential unit across 2 floors. The owner of record is Aqsa G LLC. HPD has recorded 5 housing violations here, most recently on March 30, 2025. 5 of the 5 most recent violations are still open.

HPD violations
5
DOB violations
17
ECB violations
18
HPD complaints
35

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Mar 30, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 5

  • B

    Abate the infestation consisting of mice in the entire apartment located at apt 1, 2nd story, 1st apartment from west at north

    Mar 30, 2025 · Apt 1

    Open — Nov sent out
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt 1, 2nd story, 1st apartment from west at north

    Mar 30, 2025 · Apt 1

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 2nd story, 1st apartment from west at north

    Mar 30, 2025 · Apt 1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at west, the 1st room from north at east, the foyer , the kitchen located at apt 1, 2nd story, 1st apartment from west at north

    Mar 30, 2025 · Apt 1

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2flr, 2nd story

    Feb 26, 2013 · Apt 2FLR

    Open — Nov sent out

DOB building violations · 17

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 19, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 12, 2017

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 29, 2016

    Dob violation - active
Show 7 more ↓
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 2, 2010

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed

ECB violations · 18

  • Class - 1

    Work without a permit. at time of inspection observed at 2nd floor apartments all fire stopping has been removed from walls and ceiling, all plumbing removed including water and waste. also found newly installe

    Jun 29, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Exit door not self closing. observed exit door to e 94 st defective not self closing. rmdy: repair or replace door.

    Mar 6, 2019 · Penalty $312

    Resolve
  • Class - 3

    Electrical workout permit.noted:2 illuminated signs observed.1 sign measuring 16 x 5 x 3 on ave l, on east 94th street,reading scholartech academy pre-school with phone #'s hours of operation,electrical conduit

    Feb 27, 2018 · Penalty $500

    Active
  • Class - 3

    Failure to maintain bldg in code complaint manner. noted: at 1st fl,the rear exit door to e 94 street. the door has defective in the top hinge & remains open after use. remedy: comply w/code/repair or replace.

    Mar 29, 2017 · Penalty $250

    Resolve
  • Class - 2

    Exit door not self-closing.noted:at rear,exit door has a defect in thetop hinge and remains open after use. rem:comply w/code repair the do or.

    Mar 29, 2017 · Penalty $250

    Resolve
  • Class - 1

    51-no outside combusion air to furnace.no double wall flue pipe through ceiling and out (material to be as per furnace manufacture spect) return air must be ducted of furnace room full size (per furnace manu

    Jan 24, 2017 · Penalty $2,500

    Resolve
  • Class - 1

    B154,51. 51-hot air furnace installed w/o combustion air with incorrect flue material, w/o a remote switch,w/o recirculation air duct. *repair all hazardous conditions immediately and call dob 212-393-2784 too

    Mar 29, 2016 · Penalty $2,500

    Resolve
  • Class - 1

    B101/50a/50b/50a-work w/o permit 28-105.1/50b-no work permit filed with dob for the new oil fired boiler

    Aug 16, 2010

    Resolve
  • Class - 2

    B254/36/32a/15/34b/38/50a-flue pipe not properly sealed to chimney/50b-chimney base need to be cleaned out

    Aug 16, 2010 · Penalty $1,250

    Active
  • Class - 3

    15,16,38,50abcd:50a-flue pipe not properly sealed to chimney,50b-no emergency fuel cut off swith @ door entrance 50c-relocate check valve 50d-control cover missing.

    Jan 16, 2010 · Penalty $500

    Active
Show 8 more ↓
  • Class - 2

    50ab:50a-work w/o a permit 28-301.1,50b-no work permit filed with dob for the replacement boiler.

    Jan 16, 2010

    Resolve
  • Class - 1

    B101,50a. 5a-work w/o a permit 28-105.1 for the replacement boiler.

    Feb 23, 2009 · Penalty $1,600

    Resolve
  • Class - 3

    B354,38,32a,36,15,50a.50a-relocate check valve on coldwater feed line.

    Feb 23, 2009 · Penalty $200

    Active
  • Class - 2

    28-105.1 b201 50a 50a work w/o a permit 28-105.1 no work permit filed with dob for the replacement boiler

    Nov 18, 2008 · Penalty $4,000

    Resolve
  • Class - 2

    B254 32a.32b.4a.19b.36.15. 50a no fit fresh air ventaklation from the out side for the boiler 50b the pipe not properly sealed to chimney 50c no emergency fuel cut off top of stairs 50d relocate check valve

    Nov 12, 2008 · Penalty $2,500

    Active
  • Class - 1

    Work w/o permit. observe in cell 9402 ave l plumbing work done w/o permit. installed new oil boiler. alternated gas line for exist(hwh) reconnected to line from meter for 2nd flr apt,this line not property supp

    Nov 8, 2008 · Penalty $4,000

    Resolve
  • Non-hazardous

    Occupancy contrary to that allowed by the certificate of occupancy or building department records:as noted:a commercial/residential brick framed structure 2 stories approx 80'x 20' has been converted from an ea

    Apr 29, 2005 · Penalty $2,500

    Resolve
  • Non-hazardous

    Work w/o a permit. work as noted: a commercial/residential brick framed structure 2 stories approx. 80' x 20' has been divided at first floor to form (1) an african & caribbean shop at the front & (2) a day car

    Apr 29, 2005 · Penalty $500

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Nov 20, 2025 · Apt 2F

    Close
  • Unsanitary condition

    Mold

    Nov 20, 2025 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Nov 20, 2025 · Apt 2F

    Close
  • Water leak

    Slow leak

    Nov 20, 2025 · Apt 2F

    Close
  • Paint/plaster

    Ceiling

    Nov 20, 2025 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Dec 16, 2024 · Apt 1

    Close
  • Heating

    Heat related

    Jan 21, 2014 · Apt 2F

    Close
  • Heating

    Heat related

    Feb 21, 2013 · Apt 2FL

    Close
  • Heating

    Heat related

    Feb 21, 2013 · Apt 2FLR

    Close
  • Paint/plaster

    Ceiling

    Oct 4, 2011 · Apt 2F

    Close
Show 25 more ↓
  • Electric

    Wiring

    Oct 4, 2011 · Apt 2F

    Close
  • Heating

    Heat-plant

    Oct 4, 2011 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Oct 4, 2011 · Apt 2F

    Close
  • Paint/plaster

    Ceiling

    Oct 4, 2011 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Oct 4, 2011 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Oct 4, 2011 · Apt 2F

    Close
  • Paint/plaster

    Ceiling

    Oct 4, 2011 · Apt 2F

    Close
  • General

    Mold

    Oct 4, 2011 · Apt 2F

    Close
  • General

    Mold

    Oct 4, 2011 · Apt 2F

    Close
  • Plumbing

    Water-leaks

    Oct 4, 2011 · Apt 2F

    Close
  • Plumbing

    Water-leaks

    Oct 4, 2011 · Apt 2F

    Close
  • Appliance

    Electric/gas range

    Oct 4, 2011 · Apt 2F

    Close
  • Nonconst

    Vermin

    Oct 4, 2011 · Apt 2F

    Close
  • Nonconst

    Vermin

    Oct 4, 2011 · Apt 2F

    Close
  • Paint/plaster

    Ceiling

    Oct 4, 2011 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Oct 4, 2011 · Apt 2F

    Close
  • Paint/plaster

    Ceiling

    Oct 4, 2011 · Apt 2F

    Close
  • Heating

    Heat related

    Jan 17, 2011 · Apt BLDG

    Close
  • Heating

    Heat related

    Jan 6, 2010 · Apt 2F

    Close
  • Heating

    Heat related

    Dec 8, 2008 · Apt BLDG

    Close
  • Nonconst

    Vermin

    Nov 13, 2008 · Apt 2

    Close
  • Nonconst

    Vermin

    Nov 13, 2008 · Apt 2

    Close
  • Nonconst

    Vermin

    Nov 13, 2008 · Apt 2

    Close
  • Nonconst

    Vermin

    Nov 13, 2008 · Apt 2

    Close
  • Heating

    Heat related

    Nov 22, 2007 · Apt 2FL

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S1)
Year built
1931
Floors
2
Residential units
1
Building area
2,640 ft²
Lot area
1,600 ft²
Zoning
R5D
Community board
318
Council district
46
Block / lot
8259 / 33
Assessed value
$57,840
Landmark / historic district
No

Questions about 9402 Avenue L

Who owns 9402 Avenue L?

The owner of record in NYC Department of City Planning PLUTO data is Aqsa G LLC.

Does 9402 Avenue L have violations?

Yes. NYC HPD has recorded 5 housing violations at this property.

Is 9402 Avenue L rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 9402 Avenue L built?

City records list 1931 as the year it was built.

How many apartments are in 9402 Avenue L?

It has 1 residential units and 2 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.