960 East 93 Street
Brooklyn, NY 11236BBL 3-08142-0052Map
Owner of record: Life's Joy Consulting LLC
960 East 93 Street is a two-family home built in 1935 in Brooklyn, 11236. It has 2 residential units across 2.5 floors. The owner of record is Life's Joy Consulting LLC. HPD has recorded 64 housing violations here, most recently on November 25, 2025.
- HPD violations
- 64
- DOB violations
- 3
- ECB violations
- 5
- HPD complaints
- 64
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 64
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 25, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartment at storage room
Apr 16, 2024
Closed — Violation dismissed - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections water closet, wash basin and sink at storage room
Apr 16, 2024
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 15, 2022
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the north wall, ceiling in the 2nd room from east at south located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - BHazardous
Replace with new the missing door at east wall in the 3rd room from east at south located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - BHazardous
Properly repair the broken or defective bell buzzer in the entire apartment located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - BHazardous
Replace with new the broken or defective glass at upper sash window to south wall in the 1st room from east at south located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - BHazardous
Replace with new the broken or defective glass pane at lower sash window to north wall in the bathroom located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed
Show 40 more ↓
- BHazardous
Replace with new the broken or defective ceramic floor tiles in the bathroom located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - BHazardous
Replace with new the broken or defective ceiling light fixture in the 3rd room from east at south located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at south wall , building's vestibule, at public hall, 1st story
Dec 11, 2022
Closed — Violation closed - BHazardous
Replace with new the missing wood cap at newel post , at stairs, at public hall, 1st story
Dec 11, 2022
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electical wires at wall light fixture at entrance to building, at front , 1st story
Dec 11, 2022
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling in the 2nd room from east at south located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective glass pane at door leading to balcony , west wall, in the 3rd room from east at south located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the south wall in the 2nd room from east at south located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling in the bathroom located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from east at south located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the east wall, south wall in the 3rd room from east at south located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall, 1st radiator from west at north wall in the bathroom located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall in the bathroom located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the east wall, south wall, west wall in the 3rd room from east at north located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from east at south located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st radiator from east at south wall, 1st riser from south at west wall in the 2nd room from east at south located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east at south located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling at public hall, 2nd story
Dec 11, 2022
Closed — Violation closed - ANon-hazardous
Replace with new the missing wood door at base cabinet underneath wash basin in the bathroom located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - CImmediately hazardous
Replace with new the missing glass at entrance door to builing , at public hall, 1st story
Dec 11, 2022
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall, 1st door frame from north at east wall, 1st door frame from south at west wall, 1st window frame from east at south wall in the 3rd room from east at south located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 3rd room from east at north located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall, west wall, 1st window frame from east at south wall in the 2nd room from east at south located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the 1st room from east at south located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the bathroom located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective glass at upper sash window to south wall in the 2nd room from east at south located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the 1st room from east at south located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st radiator from south at west wall, 1st riser from south at west wall in the 3rd room from east at north located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperative in the entire apartment located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - CImmediately hazardous
Replace with new the missing airconditioner sleeve covers, at south wall, in the 1st room from east at south located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - ANon-hazardous
Properly secure the loose knob at door, east wall, in the 3rd room from east at north located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the west wall, north wall, south wall, ceiling in the bathroom located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - BHazardous
Properly repair the broken or defective sink countertop , at north wall, in the kitchen located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling at public hall, 2nd story
Dec 11, 2022
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening double cylinder key operatedlock at entrance door to building at public hall, 1st story
Dec 11, 2022
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, west wall, 1st window frame from east at south wall in the 1st room from east at south located at apt second, 2nd story, 1st apartment from north at east
Dec 11, 2022 · Apt SECOND
Closed — Violation closed - IInformation / order
The premises or apts. have been vacated by the department and cannot be reoccupied until so ordered after proof of compliance for attic, south 1, vacate order # 153754
Mar 25, 2020
Closed — Violation closed
DOB building violations · 3
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 20, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2018
Dob violation - dismissed
ECB violations · 5
- Class - 1
Occupancy contrary to that allowed by c of o &/or dept of bldg records. an illegal class'a'apt created at attic unlawful gas range & kitchensink present. also full bathroom present completed w/water closet,wash
Mar 6, 2020 · Penalty $2,500
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation #35303681k issued 04/05/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. occupancy contrary to tha
Jan 10, 2019 · Penalty $625
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35303681k issued on 04-05-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. occupancy contrary to that allowed by the cert of occupancy or
Nov 23, 2018 · Penalty $1,250
Resolve - Class - 1
Work without a permit.observed in attic illegally converted to classs a unit by installed full height parition created,3pc bathroom,full kitchen w/gas stove,2 bedrooms,and that included electric,gas line and pl
Apr 5, 2018 · Penalty $800
Resolve - Class - 1
Occupancy contrary to that allowed by the certificate of occupancy or buildings dept records.ref to dob records c of o #120705.attic no occupancy at time of inspection observed attic illegally converted into cl
Apr 5, 2018 · Penalty $2,500
Resolve
Complaints
- Electric
Outlet/switch
Nov 14, 2022 · Apt SECOND
Close - Paint/plaster
Wall
Nov 14, 2022 · Apt SECOND
Close - Paint/plaster
Ceiling
Oct 4, 2022 · Apt 2FLOOR
Close - Water leak
Slow leak
Oct 4, 2022 · Apt 2FLOOR
Close - Paint/plaster
Ceiling
Oct 4, 2022 · Apt 2FLOOR
Close - Paint/plaster
Ceiling
Oct 4, 2022 · Apt 2FLOOR
Close - Water leak
Heavy flow
Oct 4, 2022 · Apt 2FLOOR
Close - Heat/hot water
Entire building
Oct 4, 2022 · Apt 2
Close - Water leak
Heavy flow
Oct 4, 2022 · Apt 2
Close - Electric
Lighting
Feb 27, 2020 · Apt 3
Close
Show 40 more ↓
- Plumbing
Water supply
Feb 27, 2020 · Apt 3
Close - Plumbing
Water supply
Feb 27, 2020 · Apt 3
Close - Plumbing
Radiator
Feb 27, 2020 · Apt 3
Close - Electric
Lighting
Feb 27, 2020 · Apt 3
Close - General
Mailbox
Feb 27, 2020 · Apt 3
Close - Unsanitary condition
Pests
Feb 27, 2020 · Apt 3
Close - General
Mailbox
Feb 22, 2020 · Apt 3FL
Close - Heat/hot water
Apartment only
Feb 21, 2020 · Apt 3RDFLO
Close - General
Mailbox
Jan 5, 2013 · Apt 1
Close - Paint/plaster
Wall
Jan 5, 2013 · Apt 1
Close - Plumbing
Water-leaks
Jan 5, 2013 · Apt 1
Close - General
Mailbox
Dec 22, 2012 · Apt 1
Close - Plumbing
Water supply
Dec 22, 2012 · Apt 1
Close - Plumbing
Water supply
Dec 22, 2012 · Apt 1
Close - Electric
Electric-supply
Dec 14, 2012 · Apt 1
Close - Electric
Wiring
Dec 14, 2012 · Apt 1
Close - General
Mailbox
Dec 14, 2012 · Apt 1
Close - Electric
Electric-supply
Dec 11, 2012 · Apt 1
Close - Electric
Electric-supply
Dec 11, 2012 · Apt 1
Close - Electric
Electric-supply
Dec 11, 2012 · Apt 1
Close - General
Mailbox
Dec 11, 2012 · Apt 1
Close - General
Mailbox
Dec 11, 2012 · Apt 1
Close - Electric
Electric-supply
Dec 11, 2012 · Apt 1
Close - Electric
Electric-supply
Dec 11, 2012 · Apt 1
Close - Electric
Wiring
Dec 11, 2012 · Apt 1
Close - General
Mailbox
Dec 11, 2012 · Apt 1
Close - General
Mailbox
Oct 27, 2012 · Apt 1
Close - Plumbing
Water-leaks
Aug 24, 2012 · Apt 1
Close - General
Mailbox
Aug 24, 2012 · Apt 1
Close - Appliance
Electric/gas range
Aug 24, 2012 · Apt 1
Close - Electric
Electric-supply
Aug 24, 2012 · Apt 1
Close - Paint/plaster
Ceiling
Aug 24, 2012 · Apt 1
Close - Plumbing
Water-leaks
Aug 24, 2012 · Apt 1
Close - Plumbing
Water-leaks
Aug 24, 2012 · Apt 1
Close - Nonconst
Vermin
Aug 24, 2012 · Apt 1
Close - Nonconst
Vermin
Aug 24, 2012 · Apt 1
Close - Plumbing
Water-leaks
Aug 21, 2012 · Apt 1
Close - Nonconst
Rubbish
Aug 21, 2012 · Apt 1
Close - Plumbing
Water-leaks
Aug 21, 2012 · Apt 1
Close - Nonconst
Vermin
Aug 21, 2012 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B1)
- Year built
- 1935
- Floors
- 2.5
- Residential units
- 2
- Building area
- 1,600 ft²
- Lot area
- 3,500 ft²
- Zoning
- R4A
- Community board
- 318
- Council district
- 42
- Block / lot
- 8142 / 52
- Assessed value
- $62,760
- Landmark / historic district
- No
HPD registration #824097, last renewed Apr 17, 2026.
Questions about 960 East 93 Street
Who owns 960 East 93 Street?
The owner of record in NYC Department of City Planning PLUTO data is Life's Joy Consulting LLC.
Does 960 East 93 Street have violations?
Yes. NYC HPD has recorded 64 housing violations at this property.
Is 960 East 93 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 960 East 93 Street built?
City records list 1935 as the year it was built.
How many apartments are in 960 East 93 Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.