roofy

535 East 89 Street

Brooklyn, NY 11236BBL 3-07968-0028Map

Owner of record: Tania Pericles, Trustee

535 East 89 Street is a walk-up apartment building built in 1970 in Brooklyn, 11236. It has 3 residential units across 2 floors. The owner of record is Tania Pericles, Trustee. HPD has recorded 26 housing violations here, most recently on January 10, 2023. 14 of the 26 most recent violations are still open.

HPD violations
26
DOB violations
0
ECB violations
0
HPD complaints
29

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Jan 10, 2023

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 26

  • B

    Repair or replace the carbon monoxide detecting device(s). missing at upper level located at apt 2, 2nd story, 1st apartment from north at east

    Jan 10, 2023 · Apt 2

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing at lower level located at apt 2, 2nd story, 1st apartment from north at east

    Jan 10, 2023 · Apt 2

    Closed — Violation closed
  • A

    Repair the leaky and/or defective faucets sink in the kitchen located at apt 2, 1st story

    Nov 30, 2020 · Apt 2

    Closed — Violation closed
  • B

    Remove all obstructions and repair all defects in the bathtub drain line in the bathroom located at apt 2, 1st story

    Nov 30, 2020 · Apt 2

    Closed — Violation closed
  • A

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 2, 1st story

    Nov 30, 2020 · Apt 2

    Closed — Violation closed
  • B

    Properly repair the broken or defective mortise lock at door in the entrance located at apt 2 upper level, 1st story

    Jul 26, 2018 · Apt 2

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color east wall in the 1st room from east at south located at apt 2 upper level, 1st story

    Jul 26, 2018 · Apt 2

    Closed — Violation closed
  • B

    Replace with new the missing hand rail from apt. entrance to upper level located at apt 2, 1st story

    Jul 26, 2018 · Apt 2

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2, 1st story

    Jul 26, 2018 · Apt 2

    Closed — Violation closed
  • C

    Remove the illegal fastening : double cylinder key operated lock at the metal entrance gate to the building

    Jul 18, 2014

    Closed — Violation closed
Show 16 more ↓
  • C

    Remove the illegal fastening : double cylinder key operated lock at the metal entrance gate to apt in the entrance located at apt 2, 1st story, 1st apartment from north at east

    Jul 18, 2014 · Apt 2

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color east wall under window sill in the 1st room from east located at apt 3fl, 3rd story

    Feb 3, 2006 · Apt 3FL

    Open — Nov sent out
  • B

    Properly repair the broken or defective calking around the west wall window in the 3rd room from east located at apt 3fl, 3rd story

    Feb 3, 2006 · Apt 3FL

    Open — Nov sent out
  • C

    Remove the illegal fastening : double cylinder lock at the metal entrance gate to the building

    Feb 3, 2006

    Closed — Violation closed
  • B

    Properly repair the broken or defective and make operable upper and lower window sashes in the 1st room from east located at apt 2, 2nd story

    Mar 31, 2003 · Apt 2

    Open — Nov sent out
  • A

    Properly repair the broken or defective make operable upper and lower window sashes in the entire apartment located at apt 2, 2nd story

    Mar 22, 2003 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color east wall in the 1st room from north at east located at apt 2, 2nd story

    Mar 22, 2003 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color east wall in the 1st room from east at south located at apt 2, 2nd story

    Mar 22, 2003 · Apt 2

    Open — Nov sent out
  • B

    Replace with new the broken or defective ceramic tiles at north wall in the bathroom located at apt 2, 2nd story

    Mar 13, 2003 · Apt 2

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at tub in the bathroom located at apt 2, 2nd story

    Mar 13, 2003 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective connection drain pipe under sink in the kitchen located at apt 2, 2nd story

    Mar 13, 2003 · Apt 2

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective sheetrock east wall in the 1st room from east located at apt 2, 2nd story

    Mar 13, 2003 · Apt 2

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective sheetrock east wall in the 2nd room from east located at apt 2, 2nd story

    Mar 13, 2003 · Apt 2

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective sheetrock west wall in the 3rd room from east located at apt 2, 2nd story

    Mar 13, 2003 · Apt 2

    Open — Nov sent out
  • B

    Properly secure the loose switch at east wall in the 3rd room from east located at apt 2, 2nd story

    Mar 13, 2003 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 2, 2nd story

    Mar 13, 2003 · Apt 2

    Open — Nov sent out

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Heat/hot water

    Apartment only

    Jan 27, 2022 · Apt HOUSE

    Close
  • Plumbing

    Toilet

    Jul 20, 2012 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Jul 20, 2012 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Jul 20, 2012 · Apt 2

    Close
  • Electric

    Lighting

    Jul 20, 2012 · Apt 2

    Close
  • Heating

    Heat related

    Feb 8, 2006 · Apt 2FL

    Close
  • Heating

    Heat related

    Dec 10, 2005 · Apt 3FL

    Close
  • Heating

    Heat related

    Dec 7, 2005 · Apt 3FL

    Close
  • Heating

    Heat related

    Nov 26, 2005 · Apt 3FL

    Close
  • General

    Windows

    Nov 10, 2005 · Apt 3FL

    Close
Show 19 more ↓
  • Plumbing

    Basin/sink

    Nov 10, 2005 · Apt 3FL

    Close
  • Heating

    Heat related

    Nov 10, 2005 · Apt 3FL

    Close
  • Heating

    Heat related

    Oct 25, 2005 · Apt 3FL

    Close
  • Heating

    Heat related

    Oct 18, 2003 · Apt 3 FL

    Close
  • Heating

    Heat related

    Mar 15, 2003 · Apt 3 FL

    Close
  • Paint/plaster

    Wall

    Mar 11, 2003 · Apt TFL

    Close
  • Paint/plaster

    Wall

    Mar 11, 2003 · Apt TFL

    Close
  • Heating

    Radiator

    Mar 11, 2003 · Apt TFL

    Close
  • General

    Windows

    Mar 11, 2003 · Apt TFL

    Close
  • Plumbing

    Basin/sink

    Mar 11, 2003 · Apt TFL

    Close
  • Plumbing

    Basin/sink

    Mar 11, 2003 · Apt 3-FL

    Close
  • Paint/plaster

    Wall

    Mar 10, 2003 · Apt 3 FL

    Close
  • General

    Windows

    Mar 10, 2003 · Apt 3 FL

    Close
  • Paint/plaster

    Wall

    Mar 10, 2003 · Apt TFL

    Close
  • Paint/plaster

    Ceiling

    Mar 10, 2003 · Apt TFL

    Close
  • General

    Windows

    Mar 10, 2003 · Apt TFL

    Close
  • Plumbing

    Basin/sink

    Mar 10, 2003 · Apt TFL

    Close
  • Appliance

    Air-conditioner

    Mar 10, 2003 · Apt TFL

    Close
  • General

    Windows

    Mar 10, 2003 · Apt TFL

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
1970
Floors
2
Residential units
3
Building area
2,970 ft²
Lot area
3,033 ft²
Zoning
R4-1
Community board
318
Council district
42
Block / lot
7968 / 28
Assessed value
$59,220
Landmark / historic district
No

Questions about 535 East 89 Street

Who owns 535 East 89 Street?

The owner of record in NYC Department of City Planning PLUTO data is Tania Pericles, Trustee.

Does 535 East 89 Street have violations?

Yes. NYC HPD has recorded 26 housing violations at this property.

Is 535 East 89 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 535 East 89 Street built?

City records list 1970 as the year it was built.

How many apartments are in 535 East 89 Street?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.