2613 East 16 Street
Brooklyn, NY 11235BBL 3-07460-0100Map
Owner of record: Gum 15, LLC
2613 East 16 Street is an office building built in 1960 in Brooklyn, 11235. The owner of record is Gum 15, LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 7
- ECB violations
- 22
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 7
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 15, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 15, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 15, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 15, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 15, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 15, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 14, 2021
Dob violation - dismissed
ECB violations · 22
- Class - 2
Work doesnt conform to const docs &/or approved amendments atoi of active jobsite i observed parapet wall 8" from curbline drawings indicatethat parapet wall should be 18" from curbline when parapet too close t
Oct 14, 2021
Resolve - Class - 2
Work doesnt conform to const docs &/or approved amendments.atoi of active jobsite i observed standard tie@18' on center vert on pipe scf drawing it indicates that (braces) standard tie should be@10' on center v
Oct 14, 2021
Resolve - Class - 2
Work doesnt conform to const docs &/or approved amendments.atoi of active jobsite i observed hvac units,skylights@exp2 unprotected after revof ssp.plan indicates that hvac units,skylights shouldve been protecte
Oct 14, 2021
Resolve - Class - 1
Sec. bc 3301.13.1 no site safety plan on site. as per article 110 of chapter 1 of titles 28. at time of inspection on an active 6 sty alt-1 job site when asking the superintendent to provide the ssp for the
Jun 17, 2021 · Penalty $625
Resolve - Class - 1
Sec. 28-105.12.8 work contrary to approved construction documents. at time of inspection on an active 6 sty alt-1 job site i observed supported scaffold installed on exp#1 on top of sws exp#2&3. upon review of
Jun 17, 2021 · Penalty $2,500
Resolve - Class - 1
Sec. 28-105.12.8 work contrary to approved construction documents. at time of inspection on an active 6 sty alt-1 job site i observed a sidewalk shed installed at exp#1. after reviewing approved design drawings
Jun 17, 2021 · Penalty $2,500
Resolve - Class - 1
Sec. bc 3301.1.1. responsibility for safety. at time of inspection on an active 6 sty alt-1 job site,i observed all staircases missing handrails. as per bc 3301.2. all fire extinguishers on site have never been
Jun 17, 2021 · Penalty $2,500
Resolve - Class - 2
Sec. bc 3301.1 fire code-fire extinguishers(fdny fc 906). at time of inspection on an active 6 sty alt job site,i observed all fire extinguishers not inspected,missing inspection tags,& several floors w/no fire
Jun 17, 2021 · Penalty $625
Resolve - Class - 1
Sec. bc 3307.6.3 area to be protected. the decking of the sidewalk shed shall extend the full length of the area that falls within the zone specified in section 3307.6.2,plus an additional 5 feet beyond such le
Jun 17, 2021 · Penalty $2,500
Resolve - Class - 1
Documents to be kept on site. at time of inspection on an active 6 styalt-1 job site when asking the superintendent to provide the followingrequired documents none could be provided. 1)no design drawings for
Jun 17, 2021 · Penalty $2,500
Resolve
Show 12 more ↓
- Class - 1
Bc3309.10.protection of roofs.note-@time of inspection i observed inadequate roof protection @exp2&4.failure to provide protection for adjacent parapets can create unsafe condition (damage).stop all exterior wo
Jan 5, 2021 · Penalty $6,250
Resolve - Class - 2
Bc3301.6.design,sizes&capacity of materials,structures temp construction equipment.note-@time of inspection i observed outrigger scaffold&exp3 upon request for design drawing none were provided (bc3301.7) desig
Jan 5, 2021 · Penalty $3,125
Resolve - Class - 1
Permit holder failed to ensure workers receive site safety orientationnote-@time of my inspection upon request for site safety orientation records for workers mario virves&enrique l. tzunun none were provided.f
Jan 5, 2021 · Penalty $12,500
Resolve - Class - 1
Installed outrigger scaffold w/o permit.note@time of inspection i observed supported scaffold consisting of platform resting on outrigger.beams projecting beyong wall or face of bldg or structure.this outrigger
Jan 5, 2021 · Penalty $12,500
Resolve - Class - 2
Failure to provide ohp. observed: active job site at exp#3 there were not overhead protection. creating a potential hazard condition for adjoining property. stop all work 10' from leading edge adjoining propert
Mar 20, 2020 · Penalty $5,000
Resolve - Class - 2
Failure to provide drawings for temporary shoring. at the time of inspection active job site,(after)finished(rim)inspection uponaccess gc for drawings for temporary shoring none was provide. creating a hazard
Mar 20, 2020
Resolve - Class - 2
Construction superintendent failed to perform duties as per rule. the following hazardous conditions were observed & stop work order was issued to this construction site: 1)work contrary to site safety plans.
Mar 20, 2020 · Penalty $2,500
Resolve - Class - 1
Failure to provide site safety orientation. after finished my inspection construction superintendent & competent person camr to my car saying that they left by emergency to homedepot,because i(seen)jobsite for
Mar 20, 2020
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-guardrails. at time of inspection active job site observed11'height construction w/o guardrails at exp#3 creating a potential ha
Mar 20, 2020
Resolve - Class - 1
Preshift safety talk. at the of inspection active job site after finishing inspection construction super & competent person came to my car &say c.p. left to homedepot,i went back to job site & upon request for
Mar 20, 2020
Resolve - Class - 2
Construction superintendent failed to perform duties as per rule-no competent person. at time of inspection,active job site upon asking for competent person no one was authorized. creating a hazard conditions
Mar 20, 2020
Resolve - Class - 2
Work contrary to plan-site safety plan.at the time of inspection observed active jobsite.upon request of site safety plan observed ohp at exp 1,2,3 on ssp,however,there was no ohp in place on exp.3;on exp.2 ina
Mar 20, 2020 · Penalty $625
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O5)
- Year built
- 1960
- Floors
- 6
- Residential units
- —
- Building area
- 16,132 ft²
- Lot area
- 3,000 ft²
- Zoning
- C4-2
- Community board
- 315
- Council district
- 48
- Block / lot
- 7460 / 100
- Assessed value
- $1,675,350
- Landmark / historic district
- No
Questions about 2613 East 16 Street
Who owns 2613 East 16 Street?
The owner of record in NYC Department of City Planning PLUTO data is Gum 15, LLC.
Does 2613 East 16 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 2613 East 16 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2613 East 16 Street built?
City records list 1960 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.