277 Neptune Avenue
Brooklyn, NY 11235BBL 3-07262-0006Map
Owner of record: 888 U LLC
277 Neptune Avenue is a mixed residential and retail building built in 1930 in Brooklyn, 11235. It has 5 residential units across 3 floors. The owner of record is 888 U LLC. HPD has recorded 145 housing violations here, most recently on May 24, 2026. 43 of the 50 most recent violations are still open.
- HPD violations
- 145
- DOB violations
- 2
- ECB violations
- 0
- HPD complaints
- 90
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 145
- BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 1st story
May 24, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
May 24, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story
Apr 28, 2026
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening consisting of key oberated lock installed at bulkhead door obstructing the people from re-entering the building at roof , 3rd story
Apr 28, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door frame at fire door at north leading to the yard at public hall, 1st story
Apr 28, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 3rd story
Apr 28, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 3rd story
Mar 30, 2026
Open — Nov certified late - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Mar 30, 2026
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at north stack building front at fire escape, 2nd story
Mar 30, 2026
Open — Nov certified late
Show 40 more ↓
- BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at public hall stairs, 2nd story
Mar 30, 2026
Open — Nov certified late - BHazardous
Remove all encumbrances consisting of construction material at public hall, 2nd story
Mar 30, 2026
Open — Nov certified late - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 20, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 10, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door at vestibule , 1st story
Oct 27, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door frame at door leading to north yard at public hall, 1st story
Oct 27, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges on door to east leading to cellar at public hall, 1st story
Apr 17, 2024
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system information missing at public hall, 1st story
Apr 17, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door at north, leading to north yard at public hall, 1st story
Apr 17, 2024
Open — Nov certified late - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 3rd story
Apr 17, 2024
Open — Nov certified late - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 3rd story
Apr 17, 2024
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story
Apr 17, 2024
Closed — Violation closed - BHazardous
§ 53,187,231 m/d law & dept rules & reg. provide means of egress from yard to street by fireproof passageway for which application must be filed for approval,or by unlocked door or gate in fence to adjoining premises with consent of adjacent owner.
Apr 17, 2024
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling ceiling, ceiling in the bathroom located at apt 3, 2nd story, 1st apartment from west at north
Apr 12, 2024 · Apt 3
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 6 sq feet at south wall in the bathroom located at apt 3, 2nd story, 1st apartment from west at north original violation 16851979 issued 12-apr-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Apr 12, 2024 · Apt 3
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall in the 1st room from north located at apt 3, 2nd story, 1st apartment from west at north
Apr 12, 2024 · Apt 3
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st closet from north at east wall door frame in the foyer located at apt 3, 2nd story, 1st apartment from west at north
Apr 12, 2024 · Apt 3
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective glass pane( cut hazard)at lower sash at 1st window from south at west wall in the 2nd room from north located at apt 3, 2nd story, 1st apartment from west at north
Apr 12, 2024 · Apt 3
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3, 2nd story, 1st apartment from west at north
Apr 12, 2024 · Apt 3
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3, 2nd story, 1st apartment from west at north
Apr 12, 2024 · Apt 3
Open — Notice of issuance sent to tenant - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3, 2nd story, 1st apartment from west at north
Apr 12, 2024 · Apt 3
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3, 2nd story, 1st apartment from west at north
Apr 12, 2024 · Apt 3
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic wall tiles north wall in the kitchen located at apt 3, 2nd story, 1st apartment from west at north
Apr 12, 2024 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3, 2nd story, 1st apartment from west at north
Apr 12, 2024 · Apt 3
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3, 2nd story, 1st apartment from west at north
Apr 12, 2024 · Apt 3
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 8sq feet at west wall, south wall, west wall, south wall in the bathroom located at apt 3, 2nd story, 1st apartment from west at north
Apr 12, 2024 · Apt 3
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 6 sq feet at south wall in the bathroom located at apt 3, 2nd story, 1st apartment from west at north
Apr 12, 2024 · Apt 3
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceilin ceiling, ceiling in the bathroom located at apt 3, 2nd story, 1st apartment from west at north
Apr 12, 2024 · Apt 3
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the foyer located at apt 3, 2nd story, 1st apartment from west at north
Apr 12, 2024 · Apt 3
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 1st room from north located at apt 3, 2nd story, 1st apartment from west at north
Apr 12, 2024 · Apt 3
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 8sq feet at west wall, south wall, west wall, south wall in the bathroom located at apt 3, 2nd story, 1st apartment from west at north original violation 16851978 issued 12-apr-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Apr 12, 2024 · Apt 3
Open — First no access to re- inspect violation - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 11, 2024
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3, 2nd story, 1st apartment from west at north
Apr 9, 2024 · Apt 3
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 1st room from north located at apt 3, 2nd story, 1st apartment from west at north
Apr 9, 2024 · Apt 3
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance lower sash at first and second window from west at north in the 1st room from north located at apt 3, 2nd story, 1st apartment from west at north
Apr 9, 2024 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3, 2nd story, 1st apartment from west at north
Apr 9, 2024 · Apt 3
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall, north wall in the bathroom located at apt 3, 2nd story, 1st apartment from west at north
Apr 9, 2024 · Apt 3
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3, 2nd story, 1st apartment from west at north
Apr 9, 2024 · Apt 3
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st radiator from south at west wall in the kitchen located at apt 3, 2nd story, 1st apartment from west at north
Apr 9, 2024 · Apt 3
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling, north wall, west wall in the bathroom located at apt 3, 2nd story, 1st apartment from west at north
Apr 9, 2024 · Apt 3
Open — Nov sent out
DOB building violations · 2
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Plumbing none
The department of buildings intends to revoke all plumbing approvals & permits under plumbing application #340010687 due to suspension of lic ense stop all plumbing work immediately except to make site safe
Jul 6, 2017
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Heat/hot water
Entire building
May 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 8, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 28, 2026 · Apt 3
Close - Heat/hot water
Entire building
Mar 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 10, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Feb 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 26, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 13, 2024 · Apt 3
Close - Heat/hot water
Apartment only
Apr 13, 2024 · Apt 3
Close - Heat/hot water
Apartment only
Apr 12, 2024 · Apt 3
Close - Water leak
Heavy flow
Apr 10, 2024 · Apt 3
Close - Heat/hot water
Entire building
Apr 10, 2024 · Apt 3
Close - Heat/hot water
Apartment only
Apr 10, 2024 · Apt 3
Close - Heat/hot water
Apartment only
Apr 10, 2024 · Apt 3
Close - Water leak
Slow leak
Apr 9, 2024 · Apt 3
Close - Unsanitary condition
Pests
Apr 9, 2024 · Apt 3
Close - Heat/hot water
Apartment only
Apr 9, 2024 · Apt 3
Close - Heat/hot water
Entire building
Apr 7, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 7, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 7, 2024 · Apt 3
Close - Unsanitary condition
Mold
Apr 7, 2024 · Apt 3
Close - Unsanitary condition
Pests
Apr 7, 2024 · Apt 3
Close - Heat/hot water
Entire building
Apr 7, 2024 · Apt 3
Close - Unsanitary condition
Mold
Apr 3, 2024 · Apt 3
Close - Paint/plaster
Ceiling
Apr 3, 2024 · Apt 3
Close - Flooring/stairs
Floor
Apr 3, 2024 · Apt 3
Close - Heat/hot water
Apartment only
Apr 3, 2024 · Apt 3
Close - Door/window
Door
Apr 3, 2024 · Apt 3
Close - Plumbing
Water supply
Mar 10, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 16, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 13, 2023 · Apt BLDG
Close - Paint/plaster
Ceiling
May 5, 2023 · Apt 3
Close - Door/window
Window frame
May 5, 2023 · Apt 3
Close - Heat/hot water
Apartment only
May 5, 2023 · Apt 3
Close - Heat/hot water
Apartment only
May 4, 2023 · Apt APT3
Close - Heat/hot water
Entire building
May 3, 2023 · Apt 3
Close - Heat/hot water
Apartment only
May 3, 2023 · Apt 3
Close - Heat/hot water
Apartment only
May 2, 2023 · Apt 3
Close - Heat/hot water
Entire building
May 2, 2023 · Apt 3
Close - Heat/hot water
Entire building
Apr 30, 2023 · Apt 3
Close - Heat/hot water
Entire building
Apr 29, 2023 · Apt 3
Close - Heat/hot water
Entire building
Apr 28, 2023 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S5)
- Year built
- 1930
- Floors
- 3
- Residential units
- 5
- Building area
- 4,120 ft²
- Lot area
- 2,000 ft²
- Zoning
- R6
- Community board
- 313
- Council district
- 48
- Block / lot
- 7262 / 6
- Assessed value
- $277,200
- Landmark / historic district
- No
HPD registration #342009, last renewed Nov 5, 2024.
Questions about 277 Neptune Avenue
Who owns 277 Neptune Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 888 U LLC.
Does 277 Neptune Avenue have violations?
Yes. NYC HPD has recorded 145 housing violations at this property.
Is 277 Neptune Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 277 Neptune Avenue built?
City records list 1930 as the year it was built.
How many apartments are in 277 Neptune Avenue?
It has 5 residential units and 6 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.