2302 West 12 Street
Brooklyn, NY 11223BBL 3-07161-0007Map
Owner of record: Avenue W Holdings LLC
2302 West 12 Street is a walk-up apartment building built in 1978 in Brooklyn, 11223. It has 12 residential units across 3 floors. The owner of record is Avenue W Holdings LLC. HPD has recorded 178 housing violations here, most recently on July 29, 2026. 2 of the 50 most recent violations are still open.
- HPD violations
- 178
- DOB violations
- 0
- ECB violations
- 1
- HPD complaints
- 498
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 178
- CImmediately hazardous
Provide ready access to buildings heating system . at boiler room
Jul 29, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt j2, 2nd story, 1st apartment from west at north
Jul 29, 2026 · Apt J2
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of a kickstand at vestibule door at public hall, 1st story
Jul 29, 2026
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing kickstand device at vestibule door
Jun 26, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 6, 2026
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing kickstand installed at vestibule door , 1st story
May 1, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective mortise lock at vestibule door , 1st story
May 1, 2026
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south
May 1, 2026 · Apt 3
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall and ceiling in the 4th room from east at north located at apt 3, 3rd story, 1st apartment from east at south
May 1, 2026 · Apt 3
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall and ceiling in the bathroom located at apt 3, 3rd story, 1st apartment from east at south
May 1, 2026 · Apt 3
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 3, 3rd story, 1st apartment from east at south
May 1, 2026 · Apt 3
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east at south located at apt 3, 3rd story, 1st apartment from east at south
May 1, 2026 · Apt 3
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east at north located at apt 3, 3rd story, 1st apartment from east at south
May 1, 2026 · Apt 3
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south
May 1, 2026 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south
May 1, 2026 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective base cabinet at sink in the kitchen located at apt 3, 3rd story, 1st apartment from east at south
May 1, 2026 · Apt 3
Open — Not complied with - CImmediately hazardous
Remove device preventing door from being self-closing consisting of permanently installed kickdown door stopper at building vestibule door
Apr 2, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Feb 2, 2026 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Feb 2, 2026 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling, north, south and west walls in the bathroom located at apt 1g, 1st story, 1st apartment from south at west
Nov 17, 2025 · Apt 1G
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1g, 1st story, 1st apartment from south at west
Nov 17, 2025 · Apt 1G
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1g, 1st story, 1st apartment from south at west
Nov 17, 2025 · Apt 1G
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1g, 1st story, 1st apartment from south at west
Nov 17, 2025 · Apt 1G
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1g, 1st story, 1st apartment from south at west
Nov 17, 2025 · Apt 1G
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of permanently installed kickdown door stopper at building vestibule door
Nov 17, 2025
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1g, 1st story, 1st apartment from south at west
Nov 17, 2025 · Apt 1G
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Apr 28, 2025
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hotwater exeeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Apr 18, 2025 · Apt 1
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Apr 10, 2025 · Apt 1
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of plexiglass at vestible door at public hall, 1st story
Sep 9, 2024
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective glass at vestible door at public hall, 1st story
Sep 9, 2024
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling. in the 3rd room from north located at apt 1j, 1st story, 1st apartment from south at west
Jun 12, 2024 · Apt 1J
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling. in the kitchen located at apt 1j, 1st story, 1st apartment from south at west
Jun 12, 2024 · Apt 1J
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt j2, 2nd story, 1st apartment from east at south
Jun 11, 2024 · Apt J2
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 17, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 17, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 17, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2024
Closed — Violation dismissed - BHazardous
Refit counter balance lower sash at 1st window at east in the 4th room from east at south located at apt i3, 3rd story, 1st apartment from west at north
Mar 13, 2024 · Apt I3
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak above ceiling in the 1st room from east at south located at apt i3, 3rd story, 1st apartment from west at north
Mar 13, 2024 · Apt I3
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak above ceiling in the 1st room from east at north located at apt i3, 3rd story, 1st apartment from west at north
Mar 13, 2024 · Apt I3
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at north located at apt i3, 3rd story, 1st apartment from west at north
Mar 13, 2024 · Apt I3
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at south located at apt i3, 3rd story, 1st apartment from west at north
Mar 13, 2024 · Apt I3
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding h0t water exeeds the maximum allowable operating temperature of 130f at all fixtures in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 18, 2024 · Apt 1STFLO
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1stflo, 1st story, 1st apartment from south at west
Jan 18, 2024 · Apt 1STFLO
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 1
- Class - 1
Plumbing work w/o a permit witnessed one larrs teledyne low pressure boiler. hot water built in march 2007 and one weilmclain storage tank on grounf flr there was no permit filed at time of inspection. remedy:
Jun 2, 2009 · Penalty $2,400
Active
Complaints
- Heat/hot water
Entire building
Jul 28, 2026 · Apt BUILDI
Close - Plumbing
Water supply
Jul 28, 2026 · Apt ENTIRE
Close - General
Janitor/super
Jul 22, 2026 · Apt IE
Close - Unsanitary condition
Mold
Jun 19, 2026 · Apt I3
Close - Plumbing
Sewer
Jun 19, 2026 · Apt I3
Close - Electric
Power outage
Jun 7, 2026 · Apt I3
Close - General
Janitor/super
Jun 7, 2026 · Apt I3
Close - Flooring/stairs
Floor
Apr 15, 2026 · Apt 3
Close - Door/window
Door
Apr 15, 2026 · Apt 3
Close - Unsanitary condition
Pests
Apr 15, 2026 · Apt 3
Close
Show 40 more ↓
- General
Cabinet
Apr 15, 2026 · Apt 3
Close - Unsanitary condition
Pests
Apr 15, 2026 · Apt 3
Close - Heat/hot water
Entire building
Jan 28, 2026 · Apt G11STF
Close - Water leak
Slow leak
Dec 22, 2025 · Apt H3
Close - Door/window
Door
Dec 22, 2025 · Apt H3
Close - Unsanitary condition
Pests
Dec 22, 2025 · Apt H3
Close - Flooring/stairs
Floor
Dec 22, 2025 · Apt H3
Close - Plumbing
Basin/sink
Dec 22, 2025 · Apt H3
Close - General
Cabinet
Dec 22, 2025 · Apt H3
Close - Unsanitary condition
Pests
Dec 22, 2025 · Apt H3
Close - Heat/hot water
Apartment only
Dec 20, 2025 · Apt G2
Close - Water leak
Heavy flow
Dec 20, 2025 · Apt H3
Close - Plumbing
Basin/sink
Dec 20, 2025 · Apt H3
Close - Water leak
Slow leak
Dec 20, 2025 · Apt H3
Close - Heat/hot water
Apartment only
Dec 16, 2025 · Apt G2
Close - Heat/hot water
Apartment only
Dec 16, 2025 · Apt G2
Close - Heat/hot water
Entire building
Nov 14, 2025 · Apt 1G
Close - Heat/hot water
Entire building
Nov 14, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 25, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 16, 2025 · Apt 1
Close - Heat/hot water
Apartment only
Apr 8, 2025 · Apt 1
Close - Door/window
Door
Feb 24, 2025 · Apt 3
Close - Flooring/stairs
Floor
Feb 24, 2025 · Apt 3
Close - Plumbing
Basin/sink
Feb 24, 2025 · Apt 3
Close - Door/window
Window frame
Feb 24, 2025 · Apt 3
Close - Paint/plaster
Wall
Feb 24, 2025 · Apt 3
Close - General
Cabinet
Feb 24, 2025 · Apt 3
Close - Safety
Smoke detector
Feb 24, 2025 · Apt 3
Close - Electric
Outlet/switch
Feb 24, 2025 · Apt 3
Close - Door/window
Door frame
Feb 24, 2025 · Apt 3
Close - Safety
Carbon monoxide detector
Feb 24, 2025 · Apt 3
Close - Heat/hot water
Apartment only
Dec 14, 2024 · Apt FLOOR1
Close - Heat/hot water
Apartment only
Dec 5, 2024 · Apt 1STFLO
Close - Heat/hot water
Entire building
Oct 10, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 9, 2024 · Apt J2
Close - Door/window
Door
Aug 19, 2024 · Apt H3
Close - Appliance
Refrigerator
Aug 19, 2024 · Apt H3
Close - Appliance
Electric/gas range
Aug 19, 2024 · Apt H3
Close - Heat/hot water
Entire building
Jul 15, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 12, 2024 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1978
- Floors
- 3
- Residential units
- 12
- Building area
- 13,536 ft²
- Lot area
- 10,167 ft²
- Zoning
- R5
- Community board
- 313
- Council district
- 47
- Block / lot
- 7161 / 7
- Assessed value
- $807,750
- Landmark / historic district
- No
HPD registration #374908, last renewed Aug 28, 2025.
Questions about 2302 West 12 Street
Who owns 2302 West 12 Street?
The owner of record in NYC Department of City Planning PLUTO data is Avenue W Holdings LLC.
Does 2302 West 12 Street have violations?
Yes. NYC HPD has recorded 178 housing violations at this property.
Is 2302 West 12 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2302 West 12 Street built?
City records list 1978 as the year it was built.
How many apartments are in 2302 West 12 Street?
It has 12 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.