191 Avenue U
Brooklyn, NY 11223BBL 3-07100-0044Map
Owner of record: 191 Avenue U Realty LLC
191 Avenue U is a mixed residential and retail building built in 1931 in Brooklyn, 11223. It has 2 residential units across 2 floors. The owner of record is 191 Avenue U Realty LLC. HPD has recorded 5 housing violations here, most recently on August 2, 2022. 5 of the 5 most recent violations are still open.
- HPD violations
- 5
- DOB violations
- 11
- ECB violations
- 4
- HPD complaints
- 8
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 5
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Aug 2, 2022
Open — Info nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east
Aug 1, 2022 · Apt 2NDFLO
Open — Nov certified late - BHazardous
Trace and repair the source and abate the visible mold condition... approx 10 sq ft at ceilng in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east
Aug 1, 2022 · Apt 2NDFLO
Open — First no access to re- inspect violation - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east
Aug 1, 2022 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east
Aug 1, 2022 · Apt 2NDFLO
Open — Nov sent out
DOB building violations · 11
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Construction other optional
Work w/out permit
Jan 2, 2006
Vw*-violation - work w/o permit dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Electric signs none
Es-electric signs none
Apr 21, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed
Show 1 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed
ECB violations · 4
- Class - 2
B254,11b,24b,50,50a,50b. 50-both pressure controls on the same 1/4 pipe to boiler; 50a-boiler feed is direct into castiron boiler,and check valve is in the incorrect position;50b-sewer drain clogged and
Jul 16, 2013
Resolve - Hazardous
No access. failure to comply w/ commissioner's orders noted:ecb#34484849y was written for work w/o a permit for demo on 2nd fl. dept recordsindicate no permit has been obtained. remedy:comply w/ commissioner's
Jun 9, 2006 · Penalty $1,500
Resolve - Hazardous
Work w/o a permit.work noted:ceiling removed based on observation.remedy:stop all work except clean debris obtain permit
Jun 9, 2006
Resolve - Hazardous
Work w/o a permit noted:a demolition of 2nd fl has caused the entire ceiling to collapse onto flr w/o a permit.remedy:stop all work except to clean debris obtain permits
Jan 2, 2006 · Penalty $800
Resolve
Complaints
- Heat/hot water
Apartment only
Dec 28, 2022 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Dec 28, 2022 · Apt 2NDFLO
Close - Door/window
Door
Dec 28, 2022 · Apt 2NDFLO
Close - Electric
Wiring
Dec 28, 2022 · Apt 2NDFLO
Close - Water leak
Damp spot
Dec 28, 2022 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Dec 28, 2022 · Apt 2NDFLO
Close - Unsanitary condition
Mold
Dec 28, 2022 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Jul 30, 2022 · Apt 2NDFLO
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1931
- Floors
- 2
- Residential units
- 2
- Building area
- 1,920 ft²
- Lot area
- 2,000 ft²
- Zoning
- R5B
- Community board
- 311
- Council district
- 43
- Block / lot
- 7100 / 44
- Assessed value
- $49,320
- Landmark / historic district
- No
Questions about 191 Avenue U
Who owns 191 Avenue U?
The owner of record in NYC Department of City Planning PLUTO data is 191 Avenue U Realty LLC.
Does 191 Avenue U have violations?
Yes. NYC HPD has recorded 5 housing violations at this property.
Is 191 Avenue U rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 191 Avenue U built?
City records list 1931 as the year it was built.
How many apartments are in 191 Avenue U?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.