2029 West 9 Street
Brooklyn, NY 11223BBL 3-07097-0071Map
Owner of record: Gournelos, Lambrina
2029 West 9 Street is a two-family home built in 1925 in Brooklyn, 11223. It has 2 residential units across 2 floors. The owner of record is Gournelos, Lambrina. HPD has recorded 29 housing violations here, most recently on September 26, 2026. 14 of the 29 most recent violations are still open.
- HPD violations
- 29
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 63
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 29
- BHazardous
Remove all obstructions and repair all defects in waste line at sink in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Sep 26, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective front panel at wash basin base cabinet in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Sep 26, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Sep 26, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and all walls in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Sep 26, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet observed at south wall in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Sep 26, 2026 · Apt 2
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from south at west
Jul 30, 2026 · Apt 2NDFLO
Open — Certification postponment denied - BHazardous
Properly repair or replace the broken or defective at base cabinet at sink in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from south at west
Jul 30, 2026 · Apt 2NDFLO
Open — Certification postponment granted - BHazardous
Properly repair with similar material the broken or defective wood cabinet at west wall in the bathroom located at apt 2ndfl, 1st story, 1st apartment from south at west
Jul 29, 2026 · Apt 2NDFL
Open — Certification postponment granted - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling in the bathroom located at apt 2ndfl, 1st story, 1st apartment from south at west
Jul 29, 2026 · Apt 2NDFL
Open — Certification postponment granted - BHazardous
Properly repair with similar material the broken or defective wash basin cabinet at west wall in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from south at west
Jul 15, 2026 · Apt 2NDFLO
Open — Certification postponment granted
Show 19 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from south at west
Jul 15, 2026 · Apt 2NDFLO
Open — Certification postponment granted - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less that 10 sq.ft at ceiling in the bathroom located at apt 2fl, 2nd story, 1st apartment from south at west
Jun 9, 2026 · Apt 2FL
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the kitchen located at apt 2fl, 2nd story, 1st apartment from south at west
Jun 9, 2026 · Apt 2FL
Open — Certification postponment granted - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 21, 2026
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electric wire from ceiling to suspended ceiling light. at public hall, 2nd story
Apr 20, 2026
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at the ceiling, at public hall, 2nd story
Apr 20, 2026
Closed — Violation closed - CImmediately hazardous
Properly secure the loose radiator at east wall in the kitchen located at apt 2ndfl, 2nd story, 1st apartment from south at west
Apr 20, 2026 · Apt 2NDFL
Closed — Violation closed - ANon-hazardous
Refit door in the 1st room from east located at apt 2ndfl, 2nd story, 1st apartment from south at west
Apr 20, 2026 · Apt 2NDFL
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood window casing of the window 1st from east at south, in the bathroom located at apt 2ndfl, 2nd story, 1st apartment from south at west
Apr 20, 2026 · Apt 2NDFL
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the visible mold at caulking of the fiber panels at the east, south and west walls around bathtub, in the bathroom located at apt 2ndfl, 2nd story, 1st apartment from south at west
Apr 20, 2026 · Apt 2NDFL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at west wall, in the 4th room from east located at apt 2ndfl, 2nd story, 1st apartment from south at west
Apr 20, 2026 · Apt 2NDFL
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood panels at north, east,south and west walls, in the 4th room from east located at apt 2ndfl, 2nd story, 1st apartment from south at west
Apr 20, 2026 · Apt 2NDFL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at the ceiling,east, south, north and west walls, in the 1st room from east located at apt 2ndfl, 2nd story, 1st apartment from south at west
Apr 20, 2026 · Apt 2NDFL
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet at water closet in the bathroom located at apt 2ndfl, 1st story, 1st apartment from south at west
Mar 21, 2026 · Apt 2NDFL
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at west wall and ceiling in the private hallway located at apt 2ndfl, 1st story, 1st apartment from south at west
Mar 21, 2026 · Apt 2NDFL
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2ndfl, 1st story, 1st apartment from south at west
Mar 21, 2026 · Apt 2NDFL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from east located at apt 2ndfl, 1st story, 1st apartment from south at west
Mar 21, 2026 · Apt 2NDFL
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at south wall and west wall in the bathroom located at apt 2ndfl, 1st story, 1st apartment from south at west
Mar 21, 2026 · Apt 2NDFL
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak above ceiling in the 1st room from east located at apt 2ndfl, 1st story, 1st apartment from south at west
Mar 21, 2026 · Apt 2NDFL
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Heat/hot water
Apartment only
Oct 19, 2026 · Apt 2
Open - Flooring/stairs
Floor
Sep 24, 2026 · Apt 2NDFLO
Close - Plumbing
Basin/sink
Sep 24, 2026 · Apt 2NDFLO
Close - Paint/plaster
Wall
Sep 22, 2026 · Apt 2NDFLO
Close - Safety
Smoke detector
Sep 22, 2026 · Apt 2NDFLO
Close - Paint/plaster
Wall
Sep 22, 2026 · Apt 2NDFLO
Close - Flooring/stairs
Floor
Sep 22, 2026 · Apt 2NDFLO
Close - Unsanitary condition
Mold
Sep 22, 2026 · Apt 2NDFLO
Close - Unsanitary condition
Mold
Aug 1, 2026 · Apt 2
Close - Safety
Smoke detector
Aug 1, 2026 · Apt 2
Close
Show 40 more ↓
- Paint/plaster
Wall
Aug 1, 2026 · Apt 2
Close - General
Ventilation system
Jul 29, 2026 · Apt 2NDFLO
Close - General
Cabinet
Jul 29, 2026 · Apt 2NDFLO
Close - Plumbing
Steam pipe/riser
Jul 29, 2026 · Apt 2NDFLO
Close - Unsanitary condition
Mold
Jul 29, 2026 · Apt 2NDFLO
Close - Paint/plaster
Wall
Jul 16, 2026 · Apt 2NDFL
Close - Unsanitary condition
Mold
Jul 16, 2026 · Apt 2NDFL
Close - Door/window
Window frame
Jul 16, 2026 · Apt 2NDFL
Close - Flooring/stairs
Floor
Jul 16, 2026 · Apt 2NDFL
Close - Paint/plaster
Wall
Jul 8, 2026 · Apt 2NDFLO
Close - Paint/plaster
Wall
Jul 8, 2026 · Apt 2NDFLO
Close - Flooring/stairs
Floor
Jul 8, 2026 · Apt 2NDFLO
Close - Unsanitary condition
Mold
Jul 8, 2026 · Apt 2NDFLO
Close - Flooring/stairs
Floor
Jun 26, 2026 · Apt 2FLOOR
Close - Unsanitary condition
Mold
Jun 26, 2026 · Apt 2FLOOR
Close - Paint/plaster
Wall
Jun 26, 2026 · Apt 2FLOOR
Close - Paint/plaster
Wall
Jun 6, 2026 · Apt 2FL
Close - Unsanitary condition
Mold
Jun 6, 2026 · Apt 2FL
Close - General
Cabinet
Jun 6, 2026 · Apt 2FL
Close - Safety
Smoke detector
Jun 6, 2026 · Apt 2FL
Close - Paint/plaster
Ceiling
Jun 6, 2026 · Apt 2FL
Close - Flooring/stairs
Floor
May 29, 2026 · Apt 2NDFL
Close - Paint/plaster
Window/frame
May 29, 2026 · Apt 2NDFL
Close - General
Cabinet
May 29, 2026 · Apt 2NDFL
Close - Paint/plaster
Wall
May 6, 2026 · Apt 2NDFLO
Close - Unsanitary condition
Mold
Apr 15, 2026 · Apt 2NDFLO
Close - Paint/plaster
Wall
Apr 15, 2026 · Apt 2NDFLO
Close - Paint/plaster
Ceiling
Apr 15, 2026 · Apt 2NDFLO
Close - Paint/plaster
Ceiling
Apr 14, 2026 · Apt SECOND
Close - Unsanitary condition
Mold
Apr 14, 2026 · Apt SECOND
Close - Paint/plaster
Ceiling
Apr 14, 2026 · Apt SECOND
Close - Paint/plaster
Ceiling
Mar 20, 2026 · Apt 2NDFL
Close - Unsanitary condition
Mold
Mar 20, 2026 · Apt 2NDFL
Close - Heat/hot water
Apartment only
Mar 15, 2026 · Apt 2NDFLO
Close - Paint/plaster
Ceiling
Mar 15, 2026 · Apt 2NDFLO
Close - Paint/plaster
Ceiling
Mar 15, 2026 · Apt SECOND
Close - Heat/hot water
Entire building
Mar 3, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 3, 2026 · Apt 2
Close - Heat/hot water
Entire building
Mar 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 27, 2026 · Apt 2NDFL
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Apr 8, 2026 | Non-market transfer | Two family dwellings | 2 |
Building details
- Building type
- Two-family home (B3)
- Year built
- 1925
- Floors
- 2
- Residential units
- 2
- Building area
- 1,440 ft²
- Lot area
- 1,967 ft²
- Zoning
- R4-1
- Community board
- 311
- Council district
- 43
- Block / lot
- 7097 / 71
- Assessed value
- $59,940
- Landmark / historic district
- No
Questions about 2029 West 9 Street
Who owns 2029 West 9 Street?
The owner of record in NYC Department of City Planning PLUTO data is Gournelos, Lambrina.
Does 2029 West 9 Street have violations?
Yes. NYC HPD has recorded 29 housing violations at this property.
Is 2029 West 9 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2029 West 9 Street built?
City records list 1925 as the year it was built.
How many apartments are in 2029 West 9 Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.