1936 East 8 Street
Brooklyn, NY 11223BBL 3-07089-0022Map
Owner of record: Rorouk Holding, LLC
1936 East 8 Street is a walk-up apartment building built in 1927 in Brooklyn, 11223. It has 4 residential units across 2 floors. The owner of record is Rorouk Holding, LLC. HPD has recorded 37 housing violations here, most recently on May 4, 2026. 4 of the 37 most recent violations are still open.
- HPD violations
- 37
- DOB violations
- 0
- ECB violations
- 1
- HPD complaints
- 24
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 37
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2024
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of stroler and house hold items at public hall, 1st story
Jun 11, 2023
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustic tile drop ceiling in the bathroom located at apt 1f, 1st story, 1st apartment from east at south
Jun 11, 2023 · Apt 1F
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling ceiling in the 4th room from east located at apt 1f, 1st story, 1st apartment from east at south
Mar 22, 2023 · Apt 1F
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective repair/door hinges in the entrance located at apt 1f, 1st story, 1st apartment from east at south
Mar 22, 2023 · Apt 1F
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective repair/door hinges in the entrance located at apt 1f, 1st story, 1st apartment from east at south
Mar 22, 2023 · Apt 1F
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st closet from west at north wall door in the 1st room from east located at apt 1f, 1st story, 1st apartment from east at south
Mar 22, 2023 · Apt 1F
Closed — Violation dismissed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1f, 1st story, 1st apartment from east at south
Mar 22, 2023 · Apt 1F
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 22, 2023
Closed — Violation dismissed
Show 27 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 1f, 1st story, 1st apartment from east at south
Mar 22, 2023 · Apt 1F
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st radiator from east at south wall in the 4th room from east located at apt 1f, 1st story, 1st apartment from east at south
Mar 22, 2023 · Apt 1F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 4th room from east located at apt 1f, 1st story, 1st apartment from east at south
Mar 22, 2023 · Apt 1F
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st radiator from north at east wall in the 1st room from east located at apt 1f, 1st story, 1st apartment from east at south
Mar 22, 2023 · Apt 1F
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the foyer located at apt 1f, 1st story, 1st apartment from east at south
Mar 22, 2023 · Apt 1F
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling ceiling, ceiling, north wall in the 4th room from east located at apt 1f, 1st story, 1st apartment from east at south
Mar 22, 2023 · Apt 1F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 1st room from east located at apt 1f, 1st story, 1st apartment from east at south
Mar 22, 2023 · Apt 1F
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, south wall, east wall, west wall, 2nd window frame from east at south wall in the 4th room from east located at apt 1f, 1st story, 1st apartment from east at south
Mar 22, 2023 · Apt 1F
Open — Defect letter issued - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling ceiling in the 4th room from east located at apt 1f, 1st story, 1st apartment from east at south
Mar 15, 2023 · Apt 1F
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color defective plaster at ceiling creating falling objects hazard ceiling in the 4th room from east located at apt 1f, 1st story, 1st apartment from east at south
Mar 15, 2023 · Apt 1F
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south
Mar 15, 2023 · Apt 1F
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south
Mar 15, 2023 · Apt 1F
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective wood door frame at vestibule , 1st story
Mar 15, 2023
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south
Mar 15, 2023 · Apt 1F
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4, wg to replace = 0, wg to repair = 1 in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south
Mar 15, 2023 · Apt 1F
Closed — Violation closed - BHazardous
Replace with new the broken or defective metal fire rated door at vestibule , 1st story
Mar 15, 2023
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of water bottles, carts, etc at public hall, 2nd story
Mar 15, 2023
Open — Not complied with - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 10, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 24, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 8, 2021
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story
Jun 28, 2016
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story
Jun 28, 2016
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story
Jun 28, 2016
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jun 28, 2016
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 28, 2016
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 8, 2015
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 18, 2015
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 1
- Class - 2
Ftm building in a code compliant manner: atoi, the wall paper in the common hallway was observed peeling. there is evidence of water leaks & peeling paint at the 2nd flr ceiling. the adhesive flr covering is pe
Sep 26, 2022 · Penalty $1,562
Resolve
Complaints
- Heat/hot water
Entire building
Mar 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 6, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 15, 2021 · Apt BLDG
Close - Unsanitary condition
Pests
Jun 23, 2016 · Apt 1F
Close - Unsanitary condition
Mold
Jun 23, 2016 · Apt 1F
Close - Unsanitary condition
Pests
Jun 23, 2016 · Apt 1F
Close - Electric
Lighting
Jun 23, 2016 · Apt 1F
Close - Appliance
Electric/gas range
Jun 23, 2016 · Apt 1F
Close - Door/window
Window frame
Jun 23, 2016 · Apt 1F
Close - Electric
Wiring
Jun 23, 2016 · Apt 1F
Close
Show 14 more ↓
- Paint/plaster
Wall
Jun 23, 2016 · Apt 1F
Close - Unsanitary condition
Pests
Jun 23, 2016 · Apt 1F
Close - Unsanitary condition
Pests
Jun 23, 2016 · Apt 1F
Close - Plumbing
Bathtub/shower
May 30, 2014 · Apt 1R
Close - Unsanitary condition
Pests
May 30, 2014 · Apt 1R
Close - Paint/plaster
Ceiling
May 30, 2014 · Apt 1R
Close - Plumbing
Basin/sink
May 30, 2014 · Apt 1R
Close - Electric
No lighting
May 30, 2014 · Apt 1R
Close - Door/window
Window pane
May 30, 2014 · Apt 1R
Close - Door/window
Door
May 30, 2014 · Apt 1R
Close - Door/window
Window pane
May 30, 2014 · Apt 1R
Close - Heating
Heat related
Nov 4, 2006 · Apt 1
Close - Heating
Heat related
Sep 13, 2006 · Apt 2FL
Close - Electric
Electric-supply
Apr 25, 2006 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1927
- Floors
- 2
- Residential units
- 4
- Building area
- 3,416 ft²
- Lot area
- 3,163 ft²
- Zoning
- R5
- Community board
- 315
- Council district
- 48
- Block / lot
- 7089 / 22
- Assessed value
- $381,150
- Landmark / historic district
- No
HPD registration #310989, last renewed Aug 28, 2025.
Questions about 1936 East 8 Street
Who owns 1936 East 8 Street?
The owner of record in NYC Department of City Planning PLUTO data is Rorouk Holding, LLC.
Does 1936 East 8 Street have violations?
Yes. NYC HPD has recorded 37 housing violations at this property.
Is 1936 East 8 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1936 East 8 Street built?
City records list 1927 as the year it was built.
How many apartments are in 1936 East 8 Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.