2760 West 22 Street

Brooklyn, NY 11224BBL 3-06990-0001Map

Owner of record: Neptune Avenue LLC

2760 West 22 Street is a hotel built in 2019 in Brooklyn, 11224. The owner of record is Neptune Avenue LLC. HPD has recorded 17 housing violations here, most recently on July 1, 2024.

HPD violations
17
DOB violations
7
ECB violations
24
HPD complaints
35

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Jul 1, 2024

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 17

  • C

    Provide hot water at all hot water fixtures in the 3rd room from east located at apt 712, 7th story, 11th apartment from south at west

    Jul 1, 2024 · Apt 712

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective door to stairs at north at public hall, 7th story

    Jul 1, 2024

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges on south hopper door at compactor closet, 5th story

    Jul 1, 2024

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the 1st room from east located at b-room 328, 3rd story, 10th b-room from north at east

    May 14, 2023 · Apt 328

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the kitchen located at apt 619, 6th story, 1st apartment from north at east

    Apr 26, 2023 · Apt 619

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system boiler room door locked, 5th story public hall

    Apr 26, 2023

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Apr 18, 2023

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Apr 18, 2023

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Apr 18, 2023

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box [ missing notice ] at public hall, 1st story

    Apr 18, 2023

    Closed — Violation dismissed
Show 7 more ↓
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Apr 18, 2023

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor [ missing frame ] at public hall, 1st story

    Apr 18, 2023

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). that is missing in the entire apartment located at apt 509, 5th story, 8th apartment from south at west

    Apr 18, 2023 · Apt 509

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector that is missing in the entire apartment located at apt 509, 5th story, 8th apartment from south at west

    Apr 18, 2023 · Apt 509

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 509, 5th story, 8th apartment from south at west

    Apr 18, 2023 · Apt 509

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the 1st room from east located at b-room 125, 1st story, 1st b-room from north at east

    Mar 11, 2023 · Apt 125

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 20, 2021

    Closed — Violation dismissed

DOB building violations · 7

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2024

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 25, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 4, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 4, 2020

    Dob violation - dismissed

ECB violations · 24

  • Class - 2

    Found laars water heater model mgv1600 inopertive and not supplying hot water to building due to pump failure., maintain boiler; correct all violating conditions and submit a certificate of correction.

    Jul 5, 2024 · Penalty $625

    Resolve
  • Class - 2

    I observed on all floors the installation of data equipment and wiring for the installed wifi system , no communication system shall be installed in the electrical closets except what is allowed in ec 110.25,su

    Nov 30, 2023

    Resolve
  • Class - 2

    Hole penetration with pipes, cables, and wiring with no fire stop, located first floor i.t. room., provide/maintain fire stopping

    Nov 16, 2023

    Resolve
  • Class - 1

    I observed on floors 2 thru 5 the installation of wiring and data equipment, electrical closets are for electrical distribution equipment only., comply with ec; remove all non-electrical distribution equipment.

    Apr 27, 2023

    Resolve
  • Class - 2

    I observed in the gas meter room an electric heater without a required equipment disconnect as per ec 424.19; ec 424.19, comply with ec code; install disconnect as required.

    Apr 27, 2023

    Resolve
  • Class - 2

    I observed on the roof the generator exposed to the elements due to a broken access door. also noted the ground conductor in the rooftop ats room installed in the concrete without protection from deteriorating

    Apr 27, 2023 · Penalty $800

    Resolve
  • Class - 2

    I observed on the roof the exhaust fan opposite the electrical rooms with flexible cord supplying power, also noted the use of and extension cord suppýying power to a fixed in place a.c unit in the lobby. as pe

    Apr 27, 2023 · Penalty $800

    Resolve
  • Class - 2

    I observed in the gas meter room the installation of branch circuit wiring to supply power for an electric heater. this work is not covered under the previous scope of work., obtain permit; obtain permit and ca

    Apr 27, 2023

    Resolve
  • Class - 2

    Observed: at roof level, at room, 6th fl electrical room, at first fl compactor room and throughout the building, laundry rooms, several openings through ceiling / walls due pipes and cables penetration without

    Feb 22, 2023

    Resolve
  • Class - 2

    Bc3307.6.5.8.periodic inspection.@ time of inspeciton i observed sidewalk shed in place along perimeter @ exp#neptune ave.upon request for 6month periodic inspection report none was provided or made available.m

    Nov 1, 2020

    Resolve
Show 14 more ↓
  • Class - 1

    Work does not conform to approved documents & or amendments. at time of inspection i observed the following conditions that did not conform w/cd5 provided by competent person. parapet clamps missing blocking.

    Aug 28, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Sec. 3309.12 protection of chimneys. at time of inspection,i observed that chimney/exhaust pipes at exp#2&3 was not extended above parapet wall of subject property not extending the chimney poses co2 hazard in

    Aug 28, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Sec. bc3314.6.3 life lines & suspension popes at time of inspection life line were loose & sitting or roof in water there were cd blocked & connected to inadequate parapet clamps. having life lines hooked on to

    Aug 28, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Sec. 3307.4 failure to maintain adequate storage zone. at time of inspection,i observed a container full of debris & a man lift parked w/jersey barriers around them. this poses a hazard to pdestrian walking nea

    Aug 28, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to maintain display on site documents require by bc/chapter 33. at time of inspection i observed loose netting drapping the height of bldg at exp#1 enclosing suspended scaffold. when requested drawings

    Aug 28, 2020 · Penalty $625

    Resolve
  • Class - 2

    Failure to institute & maiuntain safety equipment measures & temporaryconstruction. at time of inspection of a 7 sty nb currently at roof level construction work in progress stucco operations from suspended sca

    Jul 29, 2020 · Penalty $5,000

    Resolve
  • Class - 1

    Work does not conform to approved plans-temp stair platform elevator-egress. at time of inspection on a active jobsite of a 7 sty bldg,currently forminh 6 floor,it was observed that temp stairs(egress)to access

    Apr 29, 2020

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures(no rebar caps). at time of inspection of a new 7 story bldg on excavation/earthwork phase. i observed an active construction site w/ a rebar installed and

    Dec 12, 2019

    Resolve
  • Class - 1

    Bc 3304.8 dewatering(excavation/pit not adequately drained off water. at time of inspection of a new bldg 7 stry under-construction. i observed an active construction site on excavation/earthwork phase. upon in

    Dec 12, 2019

    Resolve
  • Class - 2

    Failure to have new or altered plumbing system tested sprinkler systeminstalled throughout 2201 neptune ave ava #301579450 w/ no insp results enter on bldg website w/ open work order filed at 01/24/03 rem: perf

    Dec 13, 2010 · Penalty $500

    Resolve
  • Non-hazardous

    Occupancy contrary to that allowed by the certificate of occupancy and bldg records c of o #238847 & alteration 482/90 for c of o, c of o use 1 floor yard kaitting dyeing eactory accessory storage & 1 prif offi

    Jan 8, 2003

    Resolve
  • Hazardous

    Work without a permit hazardous at west corner 1 floor installed 3 commercial over & verting to roof a steel colomn deck creating additional mezzanine floor area appr 25'x30' with a electricl ceiling additional

    Jan 8, 2003

    Resolve
  • Non-hazardous

    Work w/o a permit: work noted constructed a 1story wood structure on w23 sidewalk attached to bldg appx size 8ft x 8ft x 9ft high & 1 on west 22nd st side aprx 10ft x 8ft x 10ft high remy: obtian a permit if fe

    Nov 14, 2002

    Resolve
  • Non-hazardous

    Plumbing work without a permit, tank and bowl and lavatory basin, connected to storm drain in machine shop. remedy: obtain permit if feasible or return to prior legal condition

    Mar 11, 1993 · Penalty $350

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Jul 15, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jul 9, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jul 8, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jul 8, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jul 1, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2024 · Apt 515

    Close
  • Heat/hot water

    Entire building

    Jan 27, 2024 · Apt 328

    Close
  • Paint/plaster

    Wall

    Sep 13, 2023 · Apt 511

    Close
  • Unsanitary condition

    Pests

    Jun 18, 2023 · Apt 513

    Close
  • Heat/hot water

    Entire building

    May 16, 2023 · Apt 516

    Close
Show 25 more ↓
  • Heat/hot water

    Entire building

    May 16, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    May 16, 2023 · Apt 503

    Close
  • Heat/hot water

    Entire building

    May 15, 2023 · Apt 28

    Close
  • Heat/hot water

    Entire building

    May 15, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    May 15, 2023 · Apt 511

    Close
  • Heat/hot water

    Entire building

    May 15, 2023 · Apt 619

    Close
  • Heat/hot water

    Entire building

    May 15, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    May 14, 2023 · Apt 515

    Close
  • Heat/hot water

    Apartment only

    May 14, 2023 · Apt 509

    Close
  • Heat/hot water

    Entire building

    May 13, 2023 · Apt 1

    Close
  • Plumbing

    Water supply

    May 13, 2023 · Apt 509

    Close
  • Heat/hot water

    Apartment only

    May 13, 2023 · Apt 509

    Close
  • Heat/hot water

    Entire building

    Apr 26, 2023 · Apt 509

    Close
  • Heat/hot water

    Entire building

    Apr 26, 2023 · Apt 509

    Close
  • Heat/hot water

    Entire building

    Apr 26, 2023 · Apt 509

    Close
  • Heat/hot water

    Entire building

    Apr 25, 2023 · Apt 509

    Close
  • Unsanitary condition

    Pests

    Apr 10, 2023 · Apt 509

    Close
  • Heat/hot water

    Entire building

    Mar 13, 2023 · Apt 328

    Close
  • Heat/hot water

    Entire building

    Mar 11, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 11, 2023 · Apt BUILDI

    Close
  • Heat/hot water

    Entire building

    Mar 9, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 8, 2023 · Apt 509

    Close
  • Heat/hot water

    Entire building

    Mar 5, 2023 · Apt 509

    Close
  • Heat/hot water

    Entire building

    Apr 12, 2021 · Apt 702

    Close
  • Heat/hot water

    Apartment only

    Apr 12, 2021 · Apt 702

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Hotel (H9)
Year built
2019
Floors
7
Residential units
—
Building area
100,550 ft²
Lot area
15,113 ft²
Zoning
M1-5/R7-3
Community board
313
Council district
47
Block / lot
6990 / 1
Assessed value
$12,346,650
Landmark / historic district
No

HPD registration #389530, last renewed Jul 10, 2025.

Questions about 2760 West 22 Street

Who owns 2760 West 22 Street?

The owner of record in NYC Department of City Planning PLUTO data is Neptune Avenue LLC.

Does 2760 West 22 Street have violations?

Yes. NYC HPD has recorded 17 housing violations at this property.

Is 2760 West 22 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 2760 West 22 Street built?

City records list 2019 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.