1735 East 14 Street
Brooklyn, NY 11229BBL 3-06797-0079Map
Owner of record: Cai, Ren Tian
1735 East 14 Street is a walk-up apartment building built in 1985 in Brooklyn, 11229. It has 4 residential units across 3 floors. The owner of record is Cai, Ren Tian. HPD has recorded 22 housing violations here, most recently on July 8, 2026. 15 of the 22 most recent violations are still open.
- HPD violations
- 22
- DOB violations
- 0
- ECB violations
- 1
- HPD complaints
- 22
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 22
- CImmediately hazardous
Remove device preventing door from being self-closing consisting of permanently installed kickdown door stopper at building entrance door
Jul 8, 2026
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Jul 8, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 8, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Jul 8, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Jul 8, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Jul 8, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jul 8, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges on door at building vestibule
Jul 8, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at 2nd story balcony at building front at fire escape, 2nd story
Feb 24, 2025
Open — Nov sent out
Show 12 more ↓
- BHazardous
Repair the roof so that it will not leak over the ceiling at public hall, 3rd story
Feb 24, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling and north wall at public hall, 3rd story
Feb 24, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and north wall at public hall, 3rd story
Feb 24, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at intermediate landing at ceiling and west wall at public hall, 2nd story
Feb 24, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and west wall at intermediate landing at public hall, 2nd story
Feb 24, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at 2nd story ceiling at public hall, 2nd story
Feb 24, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at 2nd story at public hall, 2nd story
Feb 24, 2025
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing kick stand at vestibule door , 1st story
Feb 24, 2025
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 22, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 24, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 8, 2021
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 1
- Class - 2
Work w/o a permit. note: interior partition walls erected creating 3 rooms with 2 3pc bathroom in the cellar. plumbing work completed for 2 bathrooms at cellar level. remedy: obtain permit or restore premises t
Apr 28, 2009 · Penalty $400
Resolve
Complaints
- Water leak
Heavy flow
Jul 6, 2026 · Apt BASEME
Close - Paint/plaster
Wall
Jul 6, 2026 · Apt BASEME
Close - Paint/plaster
Wall
Jul 6, 2026 · Apt BASEME
Close - Paint/plaster
Ceiling
Jul 6, 2026 · Apt BASEME
Close - Paint/plaster
Ceiling
Jul 6, 2026 · Apt BASEME
Close - Paint/plaster
Ceiling
Jul 6, 2026 · Apt BASEME
Close - Paint/plaster
Wall
Jul 6, 2026 · Apt BASEME
Close - Paint/plaster
Ceiling
Jul 6, 2026 · Apt BASEME
Close - Water leak
Heavy flow
Jul 6, 2026 · Apt BASEME
Close - Paint/plaster
Ceiling
Jul 6, 2026 · Apt BASEME
Close
Show 12 more ↓
- Paint/plaster
Wall
Jul 6, 2026 · Apt BASEME
Close - Paint/plaster
Wall
Jul 6, 2026 · Apt BASEME
Close - Paint/plaster
Ceiling
Jul 6, 2026 · Apt BASEME
Close - Paint/plaster
Wall
Jul 6, 2026 · Apt BASEME
Close - Paint/plaster
Wall
Jul 6, 2026 · Apt BASEME
Close - Paint/plaster
Ceiling
Jul 6, 2026 · Apt BASEME
Close - Paint/plaster
Ceiling
Jul 6, 2026 · Apt BASEME
Close - Heat/hot water
Entire building
Mar 14, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 22, 2025 · Apt BLDG
Close - Safety
Smoke detector
Mar 7, 2019 · Apt 2D
Close - Safety
Carbon monoxide detector
Mar 7, 2019 · Apt 2D
Close - Heating
Heat related
Dec 6, 2006 · Apt B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1985
- Floors
- 3
- Residential units
- 4
- Building area
- 5,250 ft²
- Lot area
- 2,500 ft²
- Zoning
- R5B
- Community board
- 315
- Council district
- 48
- Block / lot
- 6797 / 79
- Assessed value
- $566,100
- Landmark / historic district
- No
HPD registration #313824, last renewed Aug 1, 2025.
Questions about 1735 East 14 Street
Who owns 1735 East 14 Street?
The owner of record in NYC Department of City Planning PLUTO data is Cai, Ren Tian.
Does 1735 East 14 Street have violations?
Yes. NYC HPD has recorded 22 housing violations at this property.
Is 1735 East 14 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1735 East 14 Street built?
City records list 1985 as the year it was built.
How many apartments are in 1735 East 14 Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.