roofy

1586 East 22 Street

Brooklyn, NY 11210BBL 3-06768-0019Map

Owner of record: 1586 E. 22 St Holding LLC

1586 East 22 Street is a walk-up apartment building built in 1926 in Brooklyn, 11210. It has 6 residential units across 3 floors. The owner of record is 1586 E. 22 St Holding LLC. HPD has recorded 102 housing violations here, most recently on July 29, 2026. 44 of the 50 most recent violations are still open.

HPD violations
102
DOB violations
28
ECB violations
3
HPD complaints
15

What to know

Concern
9 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Jul 29, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 102

  • C

    Properly repair or replace the broken or defective spring balances at lower sash window to north wall in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective cracked wood door in the entrance at south wall in the 4th room from east located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st door from north at east wall, 1st door frame from north at east wall in the foyer located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... at less than 10 sqft west wall in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Notice of issuance sent to tenant
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 square feet observed at south wall in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Notice of issuance sent to tenant
  • A

    Trace and repair the source and abate the visible mold condition... at less than 10 sqft ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Notice of issuance sent to tenant
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, east wall in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from west at north wall in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 2nd window frame from south at west wall, 1st window frame from south at west wall in the 3rd room from east at south located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
Show 40 more ↓
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Notice of issuance sent to tenant
  • B

    Properly repair with similar material the broken or defective cracked ceramic floor tiles in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Refit wood doors at wall and base cabinets , east wall , in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective regrout the joints between the bathtub and ceramic ties at north wall in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Properly secure the loose wash basin at west wall in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 3rd room from east at south located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at west wall, 1st closet from east at south wall door frame, 2nd closet from east at south wall door frame, north wall in the foyer located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 1st room from east located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 4th room from east located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the north wall, 1st window frame from south at west wall in the 4th room from east located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from north at east wall in the 3rd room from east at south located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall, east wall, 1st window frame from west at north wall in the 1st room from east located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st window frame from west at north wall in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the baseboard at north wall, 1st closet from east at south wall door, 2nd closet from east at south wall door in the foyer located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). north wall, 1st window frame from south at west wall in the 4th room from east located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from north at east wall in the 3rd room from east at south located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from south at west wall, east wall, 1st window frame from west at north wall in the 1st room from east located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from west at north wall in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). baseboard at north wall, 1st closet from east at south wall door, 2nd closet from east at south wall door in the foyer located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Closed — Violation closed
  • B

    Properly secure the loose ceiling light fixture with exposed electrical wires , at building 's vestibule , at public hall, 1st story

    Jul 29, 2026

    Open — Nov certified on time
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at entrance door , east walll, in the foyer located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — First no access to re- inspect violation
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 5, wg to replace = 0, wg to repair = 3 in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — First no access to re- inspect violation
  • B

    Properly repair or replace the broken or defective gasket at refrigerator door in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Civ14 mailed
  • B

    Properly repair or replace the broken or defective wood floor at base cabinet underearth sink at east wall in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective finn radiator end cover section at north wall in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective rotten sink's counter top , at east wall, in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective cracked marble door saddle in the entrnace at south wall in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • B

    Abate the nuisance consisting of pests. evidence of ants in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the foyer located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Nov sent out
  • A

    Provide a peep hole in entrance door of the dwelling unit so located so as to permit a person inside the dwelling to view any person outside entrance door at east wall in the foyer located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Civ14 mailed
  • B

    Replace with new the missing door knob at south closet , 1st from east in the foyer located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Civ14 mailed
  • B

    Properly repair or replace the broken or defective cracked entrance door in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Civ14 mailed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate illegal gate with padlock installed at window to fire escape north wall in the 1st room from east located at apt 2r, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2R

    Open — Civ14 mailed
  • B

    Remove all encumbrances consisting of aluminum a- framed ladder at south wall , at public hall, 1st story

    Jul 29, 2026

    Open — Nov certified on time

DOB building violations · 28

  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
Show 18 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed

ECB violations · 3

  • Class - 2

    Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. no certificate of correction on file for vio#39144560y as of 2/6/26., file a certificate of

    Feb 6, 2026 · Penalty $6,250

    Active
  • Class - 1

    Failure to provide unobstructed exit passageway. at time of inspection, observed 3 story 6 family dwelling egress exit passageway blocked/obstructed with items stored on approx. 4 wood pallets approx. 40" w and

    Apr 10, 2025 · Penalty $6,250

    Active
  • Class - 2

    Illegal use in a residential district. at time of inspection, observed 2 motorcycles stored/parked on the side of the building exposure 4 in violation of zr 25-41 regulation., conform to parking regulations

    Apr 10, 2025 · Penalty $1,250

    Active

Complaints

  • Unsanitary condition

    Pests

    Jul 17, 2026 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Jul 17, 2026 · Apt 2R

    Close
  • Paint/plaster

    Wall

    Jul 17, 2026 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Jul 17, 2026 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Jul 17, 2026 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Feb 23, 2025 · Apt 1R

    Close
  • Water leak

    Damp spot

    Feb 23, 2025 · Apt 1R

    Close
  • Paint/plaster

    Ceiling

    Feb 23, 2025 · Apt 1R

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2025 · Apt BLDG

    Close
  • Electric

    No lighting

    Dec 4, 2023 · Apt 1R

    Close
Show 5 more ↓
  • Heat/hot water

    Apartment only

    Nov 8, 2023 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Nov 2, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 19, 2023 · Apt 3B

    Close
  • Heat/hot water

    Entire building

    Apr 2, 2019 · Apt 3R

    Close
  • Electric

    Electric-supply

    Mar 4, 2012 · Apt 1F

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1926
Floors
3
Residential units
6
Building area
5,451 ft²
Lot area
3,000 ft²
Zoning
R4-1
Community board
314
Council district
48
Block / lot
6768 / 19
Assessed value
$409,500
Landmark / historic district
No

HPD registration #316288, last renewed Jul 30, 2025.

Questions about 1586 East 22 Street

Who owns 1586 East 22 Street?

The owner of record in NYC Department of City Planning PLUTO data is 1586 E. 22 St Holding LLC.

Does 1586 East 22 Street have violations?

Yes. NYC HPD has recorded 102 housing violations at this property.

Is 1586 East 22 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1586 East 22 Street built?

City records list 1926 as the year it was built.

How many apartments are in 1586 East 22 Street?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.