982 East 14 Street
Brooklyn, NY 11230BBL 3-06706-0040Map
Owner of record: Zohov Realty Corp
982 East 14 Street is a walk-up apartment building built in 1931 in Brooklyn, 11230. It has 8 residential units across 4 floors. The owner of record is Zohov Realty Corp. HPD has recorded 183 housing violations here, most recently on May 14, 2026. 49 of the 50 most recent violations are still open.
- HPD violations
- 183
- DOB violations
- 5
- ECB violations
- 3
- HPD complaints
- 57
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 183
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the foyer located at apt 6, 3rd story, 1st apartment from south at west
May 14, 2026 · Apt 6
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 3rd wall cabinet from west at north wall, 2nd wall cabinet from west at north wall, 1st door frame from west at north wall, ceiling in the kitchen located at apt 6, 3rd story, 1st apartment from south at west
May 14, 2026 · Apt 6
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st closet from south at west wall door frame, 1st closet from south at west wall ceiling, 1st closet from south at west wall shelf, 1st closet from south at west wall wall, 1st closet from south at west wall baseboard, 1st window frame from east at south wall, ceiling in the 1st room from east at north located at apt 6, 3rd story, 1st apartment from south at west
May 14, 2026 · Apt 6
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective cracked and loose marble treads at stairs to split level, building' s vestibule, at public hall, 1st story
May 14, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective cracked and missing ceramic floor tiles , vestibule at public hall, 1st story
May 14, 2026
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from east at south wall in the kitchen located at apt 6, 3rd story, 1st apartment from south at west
May 14, 2026 · Apt 6
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from east at south wall, 1st riser from south at west wall, 2nd riser from south at west wall in the bathroom located at apt 6, 3rd story, 1st apartment from south at west
May 14, 2026 · Apt 6
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from north at east wall, 1st door frame from west at north wall, 1st door from west at north wall in the bathroom located at apt 6, 3rd story, 1st apartment from south at west
May 14, 2026 · Apt 6
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, ceiling in the bathroom located at apt 6, 3rd story, 1st apartment from south at west
May 14, 2026 · Apt 6
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from east at south wall in the 1st room from east at north located at apt 6, 3rd story, 1st apartment from south at west
May 14, 2026 · Apt 6
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall, baseboard at west wall in the 2nd room from east at south located at apt 6, 3rd story, 1st apartment from south at west
May 14, 2026 · Apt 6
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from east at south wall in the 2nd room from east at north located at apt 6, 3rd story, 1st apartment from south at west
May 14, 2026 · Apt 6
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, picture moulding at west wall in the 2nd room from east at north located at apt 6, 3rd story, 1st apartment from south at west
May 14, 2026 · Apt 6
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east at north located at apt 6, 3rd story, 1st apartment from south at west
May 14, 2026 · Apt 6
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east at south located at apt 6, 3rd story, 1st apartment from south at west
May 14, 2026 · Apt 6
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at 3rd wall cabinet from west at north wall in the kitchen located at apt 6, 3rd story, 1st apartment from south at west
May 14, 2026 · Apt 6
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, south wall in the 2nd room from east at south located at apt 6, 3rd story, 1st apartment from south at west
May 14, 2026 · Apt 6
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from west at north wall, east wall, west wall in the 2nd room from east at south located at apt 6, 3rd story, 1st apartment from south at west
May 14, 2026 · Apt 6
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, north wall in the 2nd room from east at south located at apt 6, 3rd story, 1st apartment from south at west
May 14, 2026 · Apt 6
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from south at west wall, north wall in the bathroom located at apt 6, 3rd story, 1st apartment from south at west
May 14, 2026 · Apt 6
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall in the bathroom located at apt 6, 3rd story, 1st apartment from south at west
May 14, 2026 · Apt 6
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st base cabinet from north at east wall, baseboard at west wall, 1st window frame from north at east wall in the kitchen located at apt 6, 3rd story, 1st apartment from south at west
May 14, 2026 · Apt 6
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, baseboard at east wall, 1st dumb waiter from east at south wall, north wall, south wall, east wall, west wall, 1st wall cabinet from west at north wall in the kitchen located at apt 6, 3rd story, 1st apartment from south at west
May 14, 2026 · Apt 6
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, 1st door frame from north at east wall, north wall, south wall, east wall, west wall, 1st window frame from south at west wall in the 2nd room from east at north located at apt 6, 3rd story, 1st apartment from south at west
May 14, 2026 · Apt 6
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from west at north wall in the 1st room from east at north located at apt 6, 3rd story, 1st apartment from south at west
May 14, 2026 · Apt 6
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at west wall, 1st door frame from west at north wall, north wall, south wall, west wall in the 1st room from east at north located at apt 6, 3rd story, 1st apartment from south at west
May 14, 2026 · Apt 6
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, baseboard at west wall, 1st closet from north at east wall door, 1st closet from north at east wall door frame, south wall, east wall, west wall in the private hallway located at apt 6, 3rd story, 1st apartment from south at west
May 14, 2026 · Apt 6
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from north at east wall in the foyer located at apt 6, 3rd story, 1st apartment from south at west
May 14, 2026 · Apt 6
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, 1st closet from east at south wall door, 1st closet from east at south wall door frame, 1st door frame from north at east wall, north wall, south wall, east wall in the foyer located at apt 6, 3rd story, 1st apartment from south at west
May 14, 2026 · Apt 6
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at 1st closet from south at west wall wall in the 1st room from east at north located at apt 6, 3rd story, 1st apartment from south at west
May 14, 2026 · Apt 6
Open — Nov sent out - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door at east wall, in the entrance located at apt 6, 3rd story, 1st apartment from south at west
May 13, 2026 · Apt 6
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective cracked brick wall with deteriorated and missing mortar at joints , 4th story and parapet at building front yard
May 13, 2026
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the regrout the molded joints betwween the bathtub and ceramic tiles at east wall in the bathroom located at apt 6, 3rd story, 1st apartment from south at west
May 13, 2026 · Apt 6
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl at south wall in the bathroom located at apt 6, 3rd story, 1st apartment from south at west
May 13, 2026 · Apt 6
Open — Nov sent out - CImmediately hazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 6, 3rd story, 1st apartment from south at west
May 13, 2026 · Apt 6
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective reglaze the porcelain paint at bathtub , east wall in the bathroom located at apt 6, 3rd story, 1st apartment from south at west
May 13, 2026 · Apt 6
Open — Nov sent out - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door in the entrance, east wall, in the 2nd room from east at north located at apt 6, 3rd story, 1st apartment from south at west
May 13, 2026 · Apt 6
Open — Nov sent out - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door in the entrance , north wall, in the 1st room from east at north located at apt 6, 3rd story, 1st apartment from south at west
May 13, 2026 · Apt 6
Open — Nov sent out - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate slidebolt locking device at steel gate with eyehook capable of being padlocked at 1st window from south at west wall in the 2nd room from east at north located at apt 6, 3rd story, 1st apartment from south at west
May 13, 2026 · Apt 6
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective spring balances at lower sash of 1st window from south at west wall, window with access fire escape balcony in the 2nd room from east at north located at apt 6, 3rd story, 1st apartment from south at west
May 13, 2026 · Apt 6
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 6, 3rd story, 1st apartment from south at west
May 13, 2026 · Apt 6
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 6, 3rd story, 1st apartment from south at west
May 13, 2026 · Apt 6
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6, 3rd story, 1st apartment from south at west
May 13, 2026 · Apt 6
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6, 3rd story, 1st apartment from south at west
May 13, 2026 · Apt 6
Open — Notice of issuance sent to tenant - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 6, 3rd story, 1st apartment from south at west
May 13, 2026 · Apt 6
Closed — Violation closed - ANon-hazardous
Provide a peep hole in entrance door of the dwelling unit so located so as to permit a person inside the dwelling to view any person outside entrance door ... in the entrance located at apt 6, 3rd story, 1st apartment from south at west
May 13, 2026 · Apt 6
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective locking device at door in the entrance located at apt 6, 3rd story, 1st apartment from south at west
May 13, 2026 · Apt 6
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective spring balances at lower window sash at 1st window from south at west in the 4th room from east at north located at apt 6, 3rd story, 1st apartment from south at west
May 8, 2026 · Apt 6
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage yard
May 8, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door
May 8, 2026
Open — Nov sent out
DOB building violations · 5
- Construction other optional
Hazardous
Oct 13, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations · 3
- Class - 2
Failure to comply w/ the commissioner's order contained in nov# 35196641p issued on 6/16/16 & to file a c of c pursuant to 28-201.1, 28-204.4 & 1rcny 102-01. failure to safeguard all persons & property affected
Jul 12, 2016
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. noted: at time of inspection,observed 2 workers standing ona single plank on top of fire escape w/o any safety mesures in place
Jun 16, 2016
Resolve - Hazardous
Failure to maintain exterior bldg wall. noted:precast cement pulling away from main entrance in danger of falling. remedy: maintain exteriorbldg wall asap.
Oct 13, 2000 · Penalty $2,500
Resolve
Complaints
- Unsanitary condition
Pests
Apr 14, 2026 · Apt APT6
Close - Unsanitary condition
Pests
Apr 13, 2026 · Apt APT6
Close - Unsanitary condition
Garbage/recycling storage
Apr 13, 2026 · Apt APT6
Close - Unsanitary condition
Pests
Apr 13, 2026 · Apt 6
Close - Flooring/stairs
Floor
Jan 23, 2023 · Apt 2
Close - Door/window
Door
Jan 23, 2023 · Apt 2
Close - Safety
Carbon monoxide detector
Jan 23, 2023 · Apt 2
Close - Paint/plaster
Wall
Jan 23, 2023 · Apt 2
Close - Safety
Smoke detector
Jan 23, 2023 · Apt 2
Close - Unsanitary condition
Mold
Jan 23, 2023 · Apt 2
Close
Show 40 more ↓
- Heat/hot water
Entire building
Oct 3, 2022 · Apt BLDG
Close - Water leak
Heavy flow
Oct 12, 2021 · Apt 6
Close - Paint/plaster
Ceiling
Oct 12, 2021 · Apt 6
Close - Heat/hot water
Entire building
Nov 25, 2020 · Apt 7
Close - Water leak
Slow leak
Sep 16, 2019 · Apt 6
Close - Water leak
Heavy flow
Aug 23, 2019 · Apt 7
Close - Outside building
Roofing
Nov 26, 2018 · Apt 7
Close - Paint/plaster
Wall
Nov 26, 2018 · Apt 7
Close - Paint/plaster
Ceiling
Nov 26, 2018 · Apt 7
Close - Water leak
Slow leak
Nov 26, 2018 · Apt 7
Close - Water leak
Heavy flow
Mar 2, 2018 · Apt 7
Close - Water leak
Heavy flow
Mar 2, 2018 · Apt 7
Close - Paint/plaster
Ceiling
Jul 7, 2017 · Apt 7
Close - Door/window
Window frame
Jul 7, 2017 · Apt 7
Close - Water leak
Heavy flow
Apr 24, 2015 · Apt 6
Close - Paint/plaster
Ceiling
Apr 23, 2015 · Apt 2
Close - Paint/plaster
Wall
Apr 23, 2015 · Apt 2
Close - Water leak
Heavy flow
Apr 23, 2015 · Apt 2
Close - Water leak
Heavy flow
Mar 31, 2015 · Apt 2
Close - Paint/plaster
Wall
Mar 31, 2015 · Apt 2
Close - Paint/plaster
Ceiling
Mar 31, 2015 · Apt 2
Close - Paint/plaster
Ceiling
Mar 31, 2015 · Apt 2
Close - Heat/hot water
Entire building
Feb 25, 2015 · Apt 7
Close - Heat/hot water
Entire building
Feb 20, 2015 · Apt 7
Close - Heat/hot water
Entire building
Feb 20, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 10, 2015 · Apt 6
Close - Heat/hot water
Entire building
Jan 10, 2015 · Apt 1C
Close - Unsanitary condition
Garbage/recycling storage
Jul 17, 2014 · Apt 2
Close - Unsanitary condition
Garbage/recycling storage
May 29, 2014 · Apt BLDG
Close - Paint/plaster
Wall
Nov 1, 2011 · Apt 8
Close - Plumbing
Water-leaks
Nov 1, 2011 · Apt 8
Close - Paint/plaster
Ceiling
Oct 27, 2011 · Apt 7
Close - Paint/plaster
Ceiling
Aug 29, 2011 · Apt 7
Close - Paint/plaster
Ceiling
Aug 29, 2011 · Apt 7
Close - Plumbing
Water-leaks
Aug 29, 2011 · Apt 7
Close - Plumbing
Water-leaks
Aug 29, 2011 · Apt 7
Close - Plumbing
Water-leaks
Aug 29, 2011 · Apt 7
Close - Heating
Heat related
Dec 11, 2010 · Apt 8
Close - Heating
Heat related
Jan 7, 2008 · Apt 3
Close - Paint/plaster
Wall
Jan 7, 2008 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1931
- Floors
- 4
- Residential units
- 8
- Building area
- 7,639 ft²
- Lot area
- 3,000 ft²
- Zoning
- R5
- Community board
- 314
- Council district
- 44
- Block / lot
- 6706 / 40
- Assessed value
- $529,650
- Landmark / historic district
- No
HPD registration #301891, last renewed Dec 15, 2020.
Questions about 982 East 14 Street
Who owns 982 East 14 Street?
The owner of record in NYC Department of City Planning PLUTO data is Zohov Realty Corp.
Does 982 East 14 Street have violations?
Yes. NYC HPD has recorded 183 housing violations at this property.
Is 982 East 14 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 982 East 14 Street built?
City records list 1931 as the year it was built.
How many apartments are in 982 East 14 Street?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.