1306 Avenue H
Brooklyn, NY 11230BBL 3-06697-0002Map
Owner of record: 1306 H Realty LLC
1306 Avenue H is a mixed residential and retail building built in 1931 in Brooklyn, 11230. It has 2 residential units across 3 floors. The owner of record is 1306 H Realty LLC. HPD has recorded 7 housing violations here, most recently on May 6, 2011. 7 of the 7 most recent violations are still open.
- HPD violations
- 7
- DOB violations
- 3
- ECB violations
- 7
- HPD complaints
- 5
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 7
- BHazardous
Properly repair the broken or defective metal door at east wall (second means of egress) in the 3rd room from north at east located at apt 3fl, 3rd story, apartment at west
May 6, 2011 · Apt 3FL
Open — Nov sent out - BHazardous
Properly repair the broken or defective lock at entrance door located at apt 3fl, 3rd story, apartment at west
May 6, 2011 · Apt 3FL
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 3fl, 3rd story, apartment at west
May 6, 2011 · Apt 3FL
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 3fl, 3rd story, apartment at west
May 6, 2011 · Apt 3FL
Open — Nov sent out - BHazardous
Properly secure the loose hand rails at west wall at public hall stairs, 1st story
May 3, 2011
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of househald items at public hall stairs, 1st story
May 3, 2011
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 3fl, 3rd story, 1st apartment from south at west
May 3, 2011 · Apt 3FL
Open — Nov sent out
DOB building violations · 3
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 30, 2016
Dob violation - dismissed - Construction other optional
Hazardous
Jul 25, 2000
Dob violation - dismissed - Construction other optional
Work without a permit. work noted: installed window a/c at front 2nd floor window over entrance 20" out resting; community board 14 sign by 2"x2"x 24" wood. (complete) remedy: obtain a permit or remove a/c forthwith
Jun 30, 1999
Vw*-violation - work w/o permit dismissed
ECB violations · 7
- Class - 2
Work does not conform to approved construction documents and/or approved amendments.noted: alt2 #321452502 at 1st flr bthroom area sink roughing and outlet in wrong layout/location also noted: at 2nd flr kitch
Jan 4, 2017 · Penalty $500
Resolve - Class - 2
Failure to maintain bldg in code compliant manner use of prohibited door and/or hardware per bc 1008.1 and 27-371 (j) noted at 1st floor rear exit door latch bolt locks installed and key locking doorknob
Jan 4, 2017 · Penalty $250
Active - Class - 1
Work w/o a permit. illegal work noted: erected new framing, partitionselectrical water,waste,gas lines,duct work for new a/c, heating.for apts on 3, 3 floor and commercial space on 1st flr and waste line in cel
Sep 8, 2016 · Penalty $1,600
Resolve - Non-hazardous
Failure to maintain.defect is.due to water leak from 2fl ceiling at 1fl has sections of sheetrock missing(holes in ceiling)rem:make all necessary repairs and replace missing.
Jul 25, 2000 · Penalty $2,500
Resolve - Hazardous
Residence altered for occupancy as a dwelling for more than the legally approved number of families. department records state two families store now 2nd floor altered for occuoancy by an office and studio apt
Jan 27, 2000
Resolve - Non-hazardous
Work without a permit. work noted installed window a/c in front secondfloor window over entrance 20" out resting community board 14 high by 2"x2"x2" wood. (complete) obtain a permit or remove a/c forthwith.
Jun 30, 1999 · Penalty $2,500
Resolve - Hazardous
Failure to maintain. defect is: due to water leak from 2nd floor, ceiling in on first floor is sagging with water damage to computers and telephones all wet and out of service could cause electrical short.
Dec 23, 1998 · Penalty $2,500
Resolve
Complaints
- General
Doors
May 2, 2011 · Apt 3FL
Close - General
Locks
May 2, 2011 · Apt 3FL
Close - Nonconst
Vermin
May 2, 2011 · Apt 3FL
Close - General
Stairs
May 2, 2011 · Apt 3FL
Close - General
Stairs
May 2, 2011 · Apt 3FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 2
- Building area
- 3,300 ft²
- Lot area
- 1,800 ft²
- Zoning
- R5D
- Community board
- 314
- Council district
- 45
- Block / lot
- 6697 / 2
- Assessed value
- $89,460
- Landmark / historic district
- No
Questions about 1306 Avenue H
Who owns 1306 Avenue H?
The owner of record in NYC Department of City Planning PLUTO data is 1306 H Realty LLC.
Does 1306 Avenue H have violations?
Yes. NYC HPD has recorded 7 housing violations at this property.
Is 1306 Avenue H rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1306 Avenue H built?
City records list 1931 as the year it was built.
How many apartments are in 1306 Avenue H?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.