1889 Mcdonald Avenue is a school building built in 2024 in Brooklyn, 11223. The owner of record is Mdy Quentin LLC. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
0
ECB violations
15
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 0

No DOB violations on record

ECB violations · 15

  • Class - 1

    At the time of my inspection, i observed jersey barriers with chain link fence on top covered with debris netting, upon review of the dot permit it allowed to only occupy 8 feet of roadway and the barriers was

    Jun 12, 2026 · Penalty $5,000

    Active
  • Class - 1

    At the time of my inspection of a 6 story new building, i observed 1 worker operating a forklift, upon request for his certificate to operate according to the manufacture specification none was presented or at

    Jun 12, 2026 · Penalty $2,500

    Active
  • Class - 1

    At the time of my inspection of a 6 story new building, i observed sidewalk shed in place at exposure #1 and 2, upon review of the site safety plan it reveal that sidewalk shed at exposure #1 should be install

    Jun 12, 2026 · Penalty $2,500

    Active
  • Class - 1

    At time of inspection of a 6-story active job site, standpipe system and alarm system were in readiness. upon request, no electrical permit for the standpipe alarm system was provided. department records show n

    May 28, 2026 · Penalty $1,250

    Resolve
  • Class - 1

    At time of inspection of a 6-story active job site, fire hydrants were observed in use. upon request, no dep permit was provided. unauthorized use of fire hydrants creates a hazardous condition. stop all use im

    May 28, 2026 · Penalty $2,500

    Resolve
  • Class - 1

    Bc 3303.12.2.1 at time of inspection of a 6-story active job site, building topped off at 99 feet with no elevator or hoist in readiness. condition creates hazard to public/property and impedes emergency access

    May 28, 2026 · Penalty $5,000

    Resolve
  • Class - 2

    Bc3303.3 watchperson 6 story new building, building approximately 19792 square feet. site closed and there were no construction activity. upon shouting at perimeter and banging on fence and door to alert watchp

    May 20, 2026 · Penalty $2,500

    Resolve
  • Class - 2

    Observed jersey barriers at exp#1 not as per manufactures specification. jersey barriers not continuously interlocked fill with water/sand which poses a potential hazard by allowing unintended movement of the

    May 20, 2026 · Penalty $1,250

    Resolve
  • Class - 2

    Observation: @ exposure#1 scaffold on needle beams upon my request for needle beams drawing none was provided/displayed. pswo for no manufacure specs for needle beams. stop all scaffold work.provided manufactur

    May 4, 2026 · Penalty $6,250

    Active
  • Class - 2

    Observation:. @ exposure#1&2 support scaffold has modified cuts throughout. upon my research of scaffold drawing, drawing does not reflect cuts. pswo for scaffolds contrary to plan for modified cuts. stop all s

    May 4, 2026

    Resolve
Show 5 more ↓
  • Class - 1

    Failure to institute safety equip measures or temporary construction-"no guardrail". as noted: at time of inspection at an active jobsite for a proposed 6 story building already at the 3 floor level. observed a

    Mar 3, 2026 · Penalty $5,000

    Resolve
  • Class - 1

    At the time of my inspection observed active site erecting structural steel beams upon request observed red steel fabricator machine in use. site failed to provide manufacturer specifications(3301.6) for diesel

    Feb 18, 2026 · Penalty $2,500

    Resolve
  • Class - 2

    At time of inspection, no watchperson present on site as required; contrary to bc 3303.3, once the foundation is poured, sites exceeding 5,000 sq ft must maintain a competent watchperson during all non-working

    Oct 11, 2025 · Penalty $2,500

    Active
  • Class - 2

    Upon inspection i observed a fence installed at exposures 1&4 not constructed or maintained according to code. missing/obstructed viewing panel at expos 1& 4. protruding objects (screws, nails, damaged wood) at

    Apr 14, 2025 · Penalty $1,000

    Resolve
  • Class - 2

    Upon inspection i observed fence project info panels installed at exposures 1 and 4 contrary to code 3301.9.1.1 project information panel content. a copy of the primary project permit shall be posted or printed

    Apr 14, 2025 · Penalty $1,250

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
School building (W2)
Year built
2024
Floors
6
Residential units
—
Building area
111,940 ft²
Lot area
13,284 ft²
Zoning
R7A
Community board
315
Council district
44
Block / lot
6658 / 1
Assessed value
$149,400
Landmark / historic district
No

Questions about 1889 Mcdonald Avenue

Who owns 1889 Mcdonald Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Mdy Quentin LLC.

Does 1889 Mcdonald Avenue have violations?

NYC HPD has no housing violations on record for this property.

Is 1889 Mcdonald Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1889 Mcdonald Avenue built?

City records list 2024 as the year it was built.