roofy

9116 3 Avenue

Brooklyn, NY 11209BBL 3-06085-0044Map

Owner of record: Petrolino And Rizzica Realty Co., INC.

9116 3 Avenue is a mixed residential and retail building built in 1925 in Brooklyn, 11209. It has 5 residential units across 3 floors. The owner of record is Petrolino And Rizzica Realty Co., INC.. HPD has recorded 22 housing violations here, most recently on April 30, 2026. 4 of the 22 most recent violations are still open.

HPD violations
22
DOB violations
4
ECB violations
0
HPD complaints
45

What to know

Concern
3 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 30, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 22

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 30, 2026

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 5, 2025

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 26, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 3, 2024

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west

    Nov 27, 2021 · Apt 3R

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west

    Nov 27, 2021 · Apt 3R

    Closed — Violation dismissed
  • C

    Code: arrange and make self-closing the doors .. in the entrance located at apt 3r, 3rd story, 1st apartment from south at west

    Nov 27, 2021 · Apt 3R

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story

    Nov 27, 2021

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Nov 27, 2021

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Nov 27, 2021

    Closed — Violation dismissed
Show 12 more ↓
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Nov 27, 2021

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story

    Nov 27, 2021

    Open — Invalid certification
  • B

    Remove all encumbrances consisting of household items at public hall, 3rd story

    Mar 29, 2021

    Closed — Violation closed
  • C

    Arrange and make self-closing the doors .. in the entrance located at apt 3r, 3rd story, apartment at west

    Dec 23, 2020 · Apt 3R

    Closed — Violation dismissed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required, light fixture present

    Oct 18, 2015

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 6, 2015

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall in the private hallway located at apt 1r, 1st story, 1st apartment from south at west

    Jul 15, 2009 · Apt 1R

    Closed — Violation closed
  • B

    Remove the illegal fastening ***lockable sliding bolt installed at bulkhead door to roof.***

    Sep 29, 2008

    Closed — Violation closed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes ***air condition protruding at 2nd story balcony,building front.***

    Sep 29, 2008

    Closed — Violation closed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts required

    Sep 25, 2004

    Open — First no access to re- inspect violation
  • C

    D26-17.10 adm code post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to building's heating system 1 sty public hall & on boiler room door r42.

    Sep 24, 1986

    Open — Not complied with
  • C

    D26-17.10 adm code provide ready access to building's heating system cellar door locked r43.

    Sep 24, 1986

    Open — Not complied with

DOB building violations · 4

  • Construction other optional

    C-construction other optional

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed

ECB violations · 0

No ECB violations on record

Complaints

  • General

    Cooking gas

    Jul 6, 2026 · Apt 2F

    Close
  • Door/window

    Door

    Dec 28, 2023 · Apt 3F

    Close
  • Door/window

    Window frame

    Aug 22, 2023 · Apt 3F

    Close
  • Heat/hot water

    Apartment only

    Nov 24, 2021 · Apt 3R

    Close
  • Heat/hot water

    Apartment only

    Dec 17, 2020 · Apt 3R

    Close
  • Unsanitary condition

    Pests

    Feb 9, 2019 · Apt 3F

    Close
  • Unsanitary condition

    Pests

    Feb 9, 2019 · Apt 3F

    Close
  • Unsanitary condition

    Mold

    Feb 9, 2019 · Apt 3F

    Close
  • Plumbing

    Bathtub/shower

    Feb 9, 2019 · Apt 3F

    Close
  • Plumbing

    Steam pipe/riser

    Feb 9, 2019 · Apt 3F

    Close
Show 35 more ↓
  • Plumbing

    Water supply

    Aug 7, 2015 · Apt 1R

    Close
  • Heat/hot water

    Entire building

    Nov 17, 2014 · Apt 2R

    Close
  • Heating

    Heat related

    Mar 9, 2011 · Apt 3

    Close
  • Paint/plaster

    Wall

    Sep 9, 2009 · Apt 1R

    Close
  • Nonconst

    Carbon monoxide

    Sep 9, 2009 · Apt 1R

    Close
  • Nonconst

    Smoke detector

    Sep 9, 2009 · Apt 1R

    Close
  • Electric

    Electric-supply

    Jul 3, 2009 · Apt 1R

    Close
  • Plumbing

    Toilet

    Jul 3, 2009 · Apt 1R

    Close
  • Nonconst

    Janitor/super

    Mar 30, 2009 · Apt 1R

    Close
  • General

    Doors

    Mar 30, 2009 · Apt 1R

    Close
  • General

    Doors

    Mar 24, 2009 · Apt BLDG

    Close
  • Heating

    Heat related

    Feb 18, 2009 · Apt 1R

    Close
  • Heating

    Heat related

    Nov 10, 2008 · Apt BLDG

    Close
  • General

    Doors

    Oct 7, 2008 · Apt BLDG

    Close
  • Paint/plaster

    Ceiling

    Sep 12, 2008 · Apt 1R

    Close
  • Paint/plaster

    Wall

    Sep 12, 2008 · Apt 1R

    Close
  • Paint/plaster

    Wall

    Sep 10, 2008 · Apt 1R

    Close
  • General

    Cooking gas

    Aug 12, 2008 · Apt 1R

    Close
  • Heating

    Heat related

    Aug 12, 2008 · Apt 1R

    Close
  • Paint/plaster

    Wall

    Aug 12, 2008 · Apt 1R

    Close
  • Electric

    Electric-supply

    Aug 12, 2008 · Apt 1R

    Close
  • Electric

    Electric-supply

    Aug 12, 2008 · Apt 1R

    Close
  • Electric

    Electric-supply

    Aug 12, 2008 · Apt 1R

    Close
  • Heating

    Heat related

    Aug 1, 2008 · Apt 3R

    Close
  • Electric

    Electric-supply

    Aug 1, 2008 · Apt 3R

    Close
  • Appliance

    Electric/gas range

    Aug 1, 2008 · Apt 3R

    Close
  • Appliance

    Electric/gas range

    Aug 1, 2008 · Apt 3R

    Close
  • Electric

    Electric-supply

    Aug 1, 2008 · Apt 3R

    Close
  • Heating

    Heat related

    Apr 7, 2008 · Apt BLDG

    Close
  • General

    Doors

    Apr 7, 2008 · Apt BLDG

    Close
  • Heating

    Heat related

    Apr 7, 2008 · Apt BLDG

    Close
  • Heating

    Heat related

    Apr 3, 2008 · Apt BLDG

    Close
  • Heating

    Heat related

    Mar 31, 2008 · Apt BLDG

    Close
  • Heating

    Heat related

    Feb 15, 2008 · Apt BLDG

    Close
  • General

    Fire-escape

    Sep 8, 2003 · Apt 2

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S5)
Year built
1925
Floors
3
Residential units
5
Building area
4,560 ft²
Lot area
2,000 ft²
Zoning
R6B
Community board
310
Council district
47
Block / lot
6085 / 44
Assessed value
$382,950
Landmark / historic district
No

HPD registration #336280, last renewed Aug 6, 2025.

Questions about 9116 3 Avenue

Who owns 9116 3 Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Petrolino And Rizzica Realty Co., INC..

Does 9116 3 Avenue have violations?

Yes. NYC HPD has recorded 22 housing violations at this property.

Is 9116 3 Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 9116 3 Avenue built?

City records list 1925 as the year it was built.

How many apartments are in 9116 3 Avenue?

It has 5 residential units and 6 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.