7013 3 Avenue
Brooklyn, NY 11209BBL 3-05891-0018Map
Owner of record: 7013-7015 Thrid Ave LLC
7013 3 Avenue is a mixed residential and retail building built in 1914 in Brooklyn, 11209. It has 2 residential units across 3 floors. The owner of record is 7013-7015 Thrid Ave LLC. HPD has recorded 20 housing violations here, most recently on October 2, 2026. 14 of the 20 most recent violations are still open.
- HPD violations
- 20
- DOB violations
- 26
- ECB violations
- 4
- HPD complaints
- 16
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 20
- BHazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2, 3rd story, 1st apartment from east at south
Oct 2, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2, 3rd story, 1st apartment from east at south
Oct 2, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 3rd story, 1st apartment from east at south
Oct 2, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening consisting of key operated double cylinder lock installed at building entrance door
Oct 2, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 3rd story, 1st apartment from east at south
Sep 27, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 3rd story, 1st apartment from east at south
Sep 25, 2026 · Apt 2
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures at range in the kitchenette located at apt 2, 3rd story, 1st apartment from east at south
Sep 25, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the visible mold at caulking, grout joints of the ceramic tiles at south, west and north walls around shower stall in the 1st bathroom from east located at apt 2, 3rd story, 1st apartment from east at south
Sep 25, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the visible mold at caulking, grout joints of the ceramic tiles at west, north and east walls around shower stall in the 2nd bathroom from east located at apt 2, 3rd story, 1st apartment from east at south
Sep 25, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Sep 25, 2026
Open — Nov sent out
Show 10 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 24, 2025
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 3, 2024
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 28, 2023
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2022
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 21, 2021
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of evidence of water leak at ceiling, north and east walls in the kitchen located at apt 1fl, 1st story
Jun 17, 2006 · Apt 1FL
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color east and north walls in the kitchen located at apt 1fl, 1st story
Jun 17, 2006 · Apt 1FL
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective metal ceiling in the kitchen located at apt 1fl, 1st story
Jun 17, 2006 · Apt 1FL
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color west wall in the 4th room from east at south located at apt 1fl, 1st story
Jun 17, 2006 · Apt 1FL
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color south wall in the 3rd room from east at north located at apt 1fl, 1st story
Jun 17, 2006 · Apt 1FL
Closed — Violation dismissed
DOB building violations · 26
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 2, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Construction other optional
Work without a permit. work noted: wood shed erected in rear yard of p premises approx 15'x 15'x 10' high remedy: obtain necessary permits and approvals from d.o.b. if feasible or restore premises to prior legal condition
Oct 13, 2000
Vw*-violation - work w/o permit dismissed - Construction other optional
C-construction other optional
Nov 29, 1999
Dob violation - dismissed - Construction other optional
Work without a permit. having erected a wood frame structure at first floor rear approx 20ft wide, 30ft deep and used as food freezer stor- age box remedy: obtain approvals & permits if feasible or remove illegal construction
Jul 15, 1999
Vw*-violation - work w/o permit dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed
Show 16 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 4
- Class - 2
Work without a permit: illuminated business accessory signs with 3 over head led lights projectors appox 5'x19'x6'' read alosra market with 2 circles icons and letterings and electrical works installed without
Mar 7, 2024
Resolve - Non-hazardous
Having installed a sign w/o a permit. having an illuminated sign w/o a current permit. remedy: remove illegal work.
Jun 17, 2002 · Penalty $2,500
Resolve - Non-hazardous
Work without permit. work noted. wood shed erected in rear yard of premises approx 15'w15'dand 10'h. remedy:obtain necessary permits & approvedls from dob if fesible or restore premises to prior legal condition
Oct 13, 2000
Resolve - Non-hazardous
Work without a permit having erected a wood frame structure at first fl rear approx 20ft wide 30 ft deep and used as food freger store gebox remedy obtain approvels permits if feasible or remove ilelgal constru
Jul 15, 1999 · Penalty $500
Resolve
Complaints
- Heat/hot water
Entire building
Oct 2, 2026 · Apt BLDG
Close - General
Cooking gas
Oct 2, 2026 · Apt BLDG
Close - General
Cooking gas
Sep 26, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Sep 26, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Sep 24, 2026 · Apt 2
Close - General
Cooking gas
Sep 24, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Sep 24, 2026 · Apt 2
Close - Appliance
Electric/gas range
Sep 24, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Sep 22, 2026 · Apt 2
Close - General
Cooking gas
Sep 22, 2026 · Apt 2
Close
Show 6 more ↓
- Heat/hot water
Apartment only
Sep 22, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Sep 22, 2026 · Apt 2
Close - Electric
Electric-supply
Jul 13, 2006 · Apt 2FL
Close - Heating
Heat related
Jul 13, 2006 · Apt 2FL
Close - General
Doors
Jul 11, 2006 · Apt 2FL
Close - Plumbing
Water-leaks
Jun 9, 2006 · Apt 1FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1914
- Floors
- 3
- Residential units
- 2
- Building area
- 3,288 ft²
- Lot area
- 1,692 ft²
- Zoning
- R6B
- Community board
- 310
- Council district
- 47
- Block / lot
- 5891 / 18
- Assessed value
- $83,340
- Landmark / historic district
- No
HPD registration #818454, last renewed Oct 29, 2021.
Questions about 7013 3 Avenue
Who owns 7013 3 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 7013-7015 Thrid Ave LLC.
Does 7013 3 Avenue have violations?
Yes. NYC HPD has recorded 20 housing violations at this property.
Is 7013 3 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 7013 3 Avenue built?
City records list 1914 as the year it was built.
How many apartments are in 7013 3 Avenue?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.