6909 4 Avenue
Brooklyn, NY 11209BBL 3-05873-0110Map
Owner of record: Guornelos, Sotirios
6909 4 Avenue is a mixed residential and retail building built in 1931 in Brooklyn, 11209. It has 2 residential units across 3 floors. The owner of record is Guornelos, Sotirios. HPD has recorded 25 housing violations here, most recently on August 11, 2015. 25 of the 25 most recent violations are still open.
- HPD violations
- 25
- DOB violations
- 0
- ECB violations
- 2
- HPD complaints
- 1
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 25
- BHazardous
And department rules and regulations: remove the encumbrance obstructing egress from fire escapes flower pots at rear of the building at fire escape, 3rd story
Aug 11, 2015
Open — Nov sent out - ANon-hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the cellar throughout.
Jul 9, 2003
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective connection water line sink kitchen 1st sty. apt. 1 er-1
Jul 9, 2003
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures kitchen and bathroom, 2nd story apt 1.
Jul 9, 2003
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures oven kitchen, 2nd story apt 1. er-1
Jul 9, 2003
Open — Nov sent out - CImmediately hazardous
Repair the leaky and/or defective water supply pipe under sink at kitchen 2nd sty. er-1
Jul 9, 2003
Open — Nov sent out - BHazardous
Properly repair the broken or defective hot and cold water control valves kitchen sink faucet 2 sty. apt. #1.
Jul 9, 2003
Open — Nov sent out - BHazardous
Replace with new the broken or defective pull chain switch at ceiling light at entrance foyer and bathroom 2 sty. apt. #1.
Jul 9, 2003
Open — Nov sent out - ANon-hazardous
Refit upper and lower window sashes at center room and rear east and west rooms 2 sty. apt. #1.
Jul 9, 2003
Open — Nov sent out - BHazardous
Abate the nuisance consisting of concealed water leak at ceiling of rear east room 2 sty. apt. #1.
Jul 9, 2003
Open — Nov sent out
Show 15 more ↓
- BHazardous
Abate the nuisance consisting of vermin mice and roaches thru/out 2 sty. apt. #1.
Jul 9, 2003
Open — Nov sent out - ANon-hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard.
Jul 9, 2003
Open — Nov sent out - ANon-hazardous
Provide a proper screw cap for the cleanout of trap water line sink kitchen 1st sty. apt. 1 er-1.
Jul 9, 2003
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and walls of rear east room 2 sty. apt. #1.
Jul 9, 2003
Open — Nov sent out - BHazardous
Replace with new the missing cold water control knob at kitchen sink faucet 2nd story apt. #1.
Jul 9, 2003
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets kitchen sink faucets, 2nd story apt. #1.
Jul 9, 2003
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color wall under kitchen sink, 2nd story apt. #1.
Jul 9, 2003
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice & roaches throughout, 2nd story apt. #1.
Jul 9, 2003
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile wall & floor of bathroom, 2nd story apt. #1.
Jul 9, 2003
Open — Nov sent out - BHazardous
Properly repair the broken or defective pull chain switch at ceiling light of bathroom, 2nd story apt. #1.
Jul 9, 2003
Open — Nov sent out - BHazardous
Abate the nuisance consisting of concealed water leak at wall of rear southeast room, 2nd story apt. #1.
Jul 9, 2003
Open — Nov sent out - BHazardous
Abate the nuisance consisting of cut steam pipe at ceiling of northeast room, 2nd story apt. #1.
Jul 9, 2003
Open — Nov sent out - BHazardous
Properly secure the loose copper pipe at vestibule wall.
Jul 9, 2003
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls & ceiling, throughout 2nd story apt. #1.
Jul 9, 2003
Open — Nov sent out - ANon-hazardous
Refit upper & lower window sashes of rear east & west room, 2nd story apt. #1.
Jul 9, 2003
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 2
- Non-hazardous
Work without a permit. work noted:having renovated 1st floor commercial store thru out. remedy: obtain approvals & permits.
Dec 9, 1994 · Penalty $175
Resolve - Non-hazardous
Work without a permit.work noted:(1)installed new store front.sheet lock partition to form bathroom at rear,exhaust fan thru rear wall, sealing up rear doorway with cindar block(note:work completed.remedy:o
Jun 5, 1990 · Penalty $285
Resolve
Complaints
- Safety
Fire escape
Aug 4, 2015 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 2
- Building area
- 3,420 ft²
- Lot area
- 1,615 ft²
- Zoning
- R7B
- Community board
- 310
- Council district
- 47
- Block / lot
- 5873 / 110
- Assessed value
- $79,860
- Landmark / historic district
- No
Questions about 6909 4 Avenue
Who owns 6909 4 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Guornelos, Sotirios.
Does 6909 4 Avenue have violations?
Yes. NYC HPD has recorded 25 housing violations at this property.
Is 6909 4 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 6909 4 Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 6909 4 Avenue?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.