224 Bay Ridge Avenue
Brooklyn, NY 11220BBL 3-05871-0026Map
Owner of record: Ali's Realty Corp
224 Bay Ridge Avenue is a store building built in 1931 in Brooklyn, 11220. The owner of record is Ali's Realty Corp. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 44
- ECB violations
- 34
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 44
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 3, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active
Show 34 more ↓
- Construction other optional
Borough commissioner has ordered all work stopped under permit# 321015058 on 11/27/17 because applicant withdrawal from project, stop all work immediately and make site safe remedy: stop all work immediately and make the site safe contract the borough commissioner's office at 718-802-3677
Nov 30, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Construction other optional
Work without a permit work noted at roof a/c unit installed at north east a tower aprx 4ft wide x 10ft high at north west constructed of plywood. remedy: obtain a permit
Dec 11, 2001
Vw-violation work without permit - active - Construction other optional
Work without a permit work noted tudor shaped structure approx 15'high erected on roof of premises remedy:obtain permit approvals if feasible or restore to prior legal condition
Jul 5, 2001
Vw-violation work without permit - active - Construction other optional
Work without a peermit. work noted: a structure was erected an roof building dept records indicate no permit was issued remedy: obtain permit if feasible or remove illegal structure
Jun 16, 2001
Vw-violation work without permit - active - Construction other optional
Work without a permit. tudor shaped structure erected on roof of premises remedy: obtain permits & approvals if feasible or restore premises to prior legal condition
May 10, 2001
Vw-violation work without permit - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Construction other optional
C-construction other optional
Sep 6, 2000
Dob violation - active - Construction other optional
C-construction other optional
Sep 6, 2000
Dob violation - active - Construction other optional
C-construction other optional
Sep 6, 2000
Dob violation - active - Construction other optional
C-construction other optional
Sep 6, 2000
Dob violation - active - Construction other optional
C-construction other optional
Sep 6, 2000
Dob violation - active - Construction other optional
C-construction other optional
Sep 6, 2000
Dob violation - active - Construction other optional
C-construction other optional
Sep 6, 2000
Dob violation - active - Construction other optional
C-construction other optional
Sep 6, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - active
ECB violations · 34
- Class - 2
At the time of inspection, observed a sidewalk shed installed at exposures 1 and 4. no permit was posted at the site, contrary to code requirements.
Oct 5, 2026 · Penalty $300
Active - Class - 1
Failure to maintain building in code-compliant manner. observed at time of inspection for vio#39072543m at exp#1&exp#4 step cracks and a large crack in the conner of 1&4 at roof level ,at exp#4 above rollup doo
May 26, 2026 · Penalty $12,500
Active - Class - 2
Cracks in facade & bricks shifting on overhang at corner of building and cracks on wall (bay ridge place side) exp4 of building., maintain exterior building wall
Feb 23, 2023 · Penalty $6,250
Active - Class - 1
Upon inspection observed no active construction, building is closed at this time. swo is still in effect. however did observed a failure to maintain the building at the corner of exp.#1 & #4 due to the parapet
Oct 24, 2022 · Penalty $625
Active - Class - 2
Failure to maintain building in code compliant manner.at the time of inspection it was noted that facade was in slate of disrepair with siding bulging and with broker sections various area.rem:repair and replac
May 30, 2020 · Penalty $312
Active - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35362759l issued on 01-08-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for failure to maintain bldg. throughout the laundromat there
Oct 31, 2019 · Penalty $3,125
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35362759l issued on 01-08-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant manner. remedy: comp
Sep 14, 2019 · Penalty $625
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35362759l issued on 01-08-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant manner. remedy: comp
Jul 17, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/v olation#35362759l issued on 01/08/19 and to file a certificate of cor ection pursuant to 28-201.1 and 1rcny 102-01.failure to maintain buil
May 3, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building in a code compliant manner.noted;observed throughout laundromat several sections of ceiling collapsed + other section with the potential to collapse.also observed water damage wall
Jan 8, 2019 · Penalty $1,250
Resolve
Show 24 more ↓
- Class - 2
Work w/out a permit. noted: @ time of insp observed a newly installed commercial model solid fuel pizza oven approximately 23"w by 11"w a chimney pipe exhausting through the roof. the dob records indicate no pe
Nov 20, 2017 · Penalty $200
Active - Class - 2
As per class 1 (b265) 28-303.7 failure to file a complete boiler inspection report as per dob records. submit a current b09 report.
May 12, 2017 · Penalty $500
Active - Class - 2
Work w/o permit. observed from open front door renovation work occurring.access denied front door closed then locked. no permits on file inspector denied access. rmdy:obtain permit or restore premises to pri
Jul 20, 2016 · Penalty $4,000
Active - Class - 3
Work w/o a permit. at time of inspection observed at roof level the illegal creation of wood framed storage shed w/shed nailed down to roof measuring approx 4 feet wide x 8 feet long & 8 feet high w/o obtaining
Jul 12, 2011 · Penalty $500
Active - Class - 2
Altered/changed bldg occupied w/o a valid cofo as per 28-118.3.1&28-118.3.2note:one story bldg been altered from 6 stories to one laudromat & one restaurant(eating & drinking est)& one mosque,work done under jo
May 23, 2011 · Penalty $500
Active - Non-hazardous
Operation of pa w/o a current permit.noted:owner unable to provide a pa permit at time of inspection.remedy:obtain a pa permit.
Jun 21, 2007 · Penalty $10,000
Active - Non-hazardous
Operation of a pa contrary to the c of o.noted:c of o#204167 does not allow operation of a pa.remedy:discontinue illegal use & obtain a new c of o.
Jun 21, 2007 · Penalty $2,500
Active - Non-hazardous
Work w/o a permit.noted:construction at cellar level has occurred w/electrical & a wood frame stairs approx 4'wide w/11 risers & 2 baths have been erected also at cellar level w/o permits.remedy:obtain permits
Jun 21, 2007 · Penalty $2,500
Active - Non-hazardous
Operation of a place of assembly w/o a current permit noted : manager unable to provide a pa. permit at time of inspection remedy : obtain p.a. permit
Mar 13, 2004 · Penalty $2,500
Active - Hazardous
Exit door total obstruction : at rear of premises 2nd means of egress totally obstructed by chairs & debris no 2nd means of egress. remedy : remove obstruction immediately
Mar 12, 2004 · Penalty $2,500
Active - Non-hazardous
Exit door swings against flow of egress : front exit doors swing into premises against flow of egress remedy : repair or replace door
Mar 12, 2004 · Penalty $2,500
Active - Non-hazardous
Failure to provide fire stopping where required noted : in cellar no stopping thru out on 1st fl in kitchen a ceiling panel is missing exposing roof joists remedy : provide fire stopping
Mar 12, 2004 · Penalty $2,500
Active - Hazardous
Failure to maintain building noted : in cellar of premises there is numerous open electrical boxes with main wires exposed which could be a fire hazard also there is piles of flamable material strewn thru out c
Mar 12, 2004 · Penalty $2,500
Active - Non-hazardous
Failure to maintain exterior building wall. defects is cracked and defective stacco with holes, also martar joints missing on front facade at front of building. make all neccessary repairs.
Apr 21, 2003 · Penalty $2,500
Active - Non-hazardous
Altered bldg occupied without a valid c/o noted premesis is one stry bldg occupied as a mosque prayer service on sunday nights remedy discontinue illegal use or amend c of o
Jul 14, 2002 · Penalty $350
Active - Non-hazardous
Occupacny contrary to that allowed by building dept records sandborm maps show commercial, rear estate register shows 1k store bldg presently being used as a house of workship ( mosque ) remedy : discontinue il
Dec 11, 2001 · Penalty $800
Active - Non-hazardous
Work w/o a permit : work noted at roof a/c unit installed at north east, & a tower aprx 4th wide x 10ft high, at north west constrcuted of plywood remedy : obtain a permit
Dec 11, 2001 · Penalty $500
Active - Non-hazardous
Work without a permit. work noted. tudor shaped structure approx 15' hih erected on roof of premises. remedy: obtain permit & approvals if feasible or restore to prior legal condition.
Jul 5, 2001
Resolve - Non-hazardous
Work without a permit work noted: a structure was erected on roof & building dept records indicate no permit was issue. remedy: obtain permit if feasible or remove illegal structure.
Jun 16, 2001 · Penalty $2,500
Active - Non-hazardous
Work without a permit.tudor shaped structure erected on roof of premises.remedy:obtain permits &approvals if feasible or restore premises to prior legal condition
May 10, 2001
Resolve - Non-hazardous
Work without a permit.work noted:tudor shape structure approx 15'high erected on roof of premises.rem:obtian permit and approvals from d.o.b if feasible or restore premises to prior legal condition.
Sep 27, 2000 · Penalty $250
Active - Non-hazardous
Occupancy contrary to that allowed by c of o #204167. legal use 6 stores now 5 stores. remedy: obtain admended c of o.
Jun 4, 1999 · Penalty $2,500
Active - Unknown
Operation of a place of assembly without a current permit remedy obtain a current pa permit. failure to have approve pa plans avial. for insp remedy post copy of approved pa plan framed and hung of wall
Aug 11, 1988 · Penalty $135
Active - Hazardous
Failure to post approved capacity sign remedy post approved cpacity sign at 1fl for 175 persons. required means of egress obstructed. north west exit base of stairs on ground floor obstructed by boxes
Aug 11, 1988
Active
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K1)
- Year built
- 1931
- Floors
- 1
- Residential units
- —
- Building area
- 5,300 ft²
- Lot area
- 5,300 ft²
- Zoning
- R5B
- Community board
- 310
- Council district
- 47
- Block / lot
- 5871 / 26
- Assessed value
- $441,900
- Landmark / historic district
- No
Questions about 224 Bay Ridge Avenue
Who owns 224 Bay Ridge Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Ali's Realty Corp.
Does 224 Bay Ridge Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 224 Bay Ridge Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 224 Bay Ridge Avenue built?
City records list 1931 as the year it was built.