1446 65 Street
Brooklyn, NY 11219BBL 3-05755-0025Map
Owner of record: Ingravallo John
1446 65 Street is a store building built in 1950 in Brooklyn, 11219. It has 1 residential unit across 2 floors. The owner of record is Ingravallo John. HPD has recorded 26 housing violations here, most recently on July 8, 2017. 19 of the 26 most recent violations are still open.
- HPD violations
- 26
- DOB violations
- 8
- ECB violations
- 5
- HPD complaints
- 247
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 26
- BHazardous
Provide a safe and adequate supply of electric service to the fixtures in the bathroom located at apt 1rr, 1st story
Jul 8, 2017 · Apt 1RR
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures in the 1st room from north at west located at apt 1rr, 1st story
Jul 8, 2017 · Apt 1RR
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor, center in 3rd room from north located at apt 1rr, 1st story
Jul 8, 2017 · Apt 1RR
Open — Nov sent out - BHazardous
Abate the nuisance consisting of excessive storage of material in 1st room from north at west located at apt 1rr, 1st story
Jul 8, 2017 · Apt 1RR
Open — Nov sent out - BHazardous
Abate the nuisance consisting of excessive storage of material in 2nd room from north at west located at apt 1rr, 1st story
Jul 8, 2017 · Apt 1RR
Open — Nov sent out - BHazardous
Replace with new the broken or defective drain pipe at basin/sink. in the bathroom located at apt 1rr, 1st story, 1st apartment from south at west
May 15, 2017 · Apt 1RR
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinil floor tiles. in the entire apartment located at apt 1rr, 1st story, 1st apartment from south at west
May 15, 2017 · Apt 1RR
Closed — Violation closed - BHazardous
Replace with new the missing mailbox. at public hall, 1st story
May 15, 2017
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 1rr, 1st story, apartment at west
Dec 2, 2016 · Apt 1RR
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective linoleum at floor in center in the kitchen located at apt 1rr, 1st story, apartment at west
Dec 2, 2016 · Apt 1RR
Open — Nov sent out
Show 16 more ↓
- BHazardous
Abate the nuisance consisting of excessive storage of material in entire apartment located at apt 1rr, 1st story, apartment at west
Dec 2, 2016 · Apt 1RR
Open — Nov sent out - BHazardous
Properly repair the broken or defective mortise lock at door in the entrance located at apt 1rr, 1st story, apartment at west
Dec 2, 2016 · Apt 1RR
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tile at walking aria in the kitchen located at apt 1rr, 1st story, 1st apartment from east at south
Apr 12, 2016 · Apt 1RR
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 1rr, 1st story, 1st apartment from east at south
Apr 12, 2016 · Apt 1RR
Open — Nov sent out - BHazardous
Properly repair the broken or defective electrical outlet at north wall in the kitchen located at apt 1rr, 1st story, 1st apartment from east at south
Apr 12, 2016 · Apt 1RR
Open — Nov sent out - BHazardous
Properly repair the broken or defective casing at entrance door in the entire apartment located at apt 1rr, 1st story, 1st apartment from east at south
Apr 12, 2016 · Apt 1RR
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceilings and walls in the entire apartment located at apt 1rr, 1st story, 1st apartment from east at south
Apr 12, 2016 · Apt 1RR
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in waste line at wash basin in the bathroom located at apt 1rr, 1st story, apartment at south
Apr 12, 2016 · Apt 1RR
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the kitchen located at apt 1rr, 1st story, apartment at south
Dec 28, 2015 · Apt 1RR
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 1rr, 1st story
Dec 28, 2015 · Apt 1RR
Open — Nov sent out - BHazardous
Properly secure the loose electric wall outlet in the kitchen located at apt 1rr, 1st story, apartment at south
Dec 28, 2015 · Apt 1RR
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the kitchen located at apt 1rr, 1st story, apartment at south
Dec 28, 2015 · Apt 1RR
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective glass pane at lower window sash in the 4th room from north located at apt 1rr, 1st story
Dec 28, 2015 · Apt 1RR
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective mailbox door at lobby, 1st story
Oct 20, 2014 · Apt 1RTREA
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective door lock at vestibule door
Feb 28, 2014
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling in the entire apartment located at apt 1rr, 1st story, 1st apartment from south at west
Dec 15, 2010 · Apt 1RR
Open — Not complied with
DOB building violations · 8
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 14, 2015
Dob violation - active
ECB violations · 5
- Class - 2
Work without a permit .at time of inspection i bserved at rear expo.3 a wooden structure approx. 40ft(l)x20ft(w)makeshift shed used to store tires . no permit on file., obtain all permits
Oct 7, 2026 · Penalty $1,250
Active - Class - 1
Failure to maintain building in code-compliant manner. at time of inspection i observed at front expo.1 vertical and horizontal cracks along roller gate door level ., repair and/replace
Oct 7, 2026 · Penalty $2,500
Active - Class - 1
Failure to comply w/ the commissioner's order contained in notice of violation # 35097885h issued on 10/18/14. illegal work at cellar. remedy: comply w/ the commissioner's order
Dec 6, 2014 · Penalty $2,400
Active - Class - 2
Occupancy contrary to that allowed by the cofo bldg dept records and/or all applicable laws and regulations. cofo #219379 indicates first tobe store,and construction establishment offices & garage illegal occu
Oct 18, 2014 · Penalty $1,200
Active - Class - 1
Work w/o a permit. work noted: partitions erected at 1st flr rear creating four (4) rooms.plumbing lines installed for 3pc bathroom and kit chen w/sink & gas stove. all work is contrary to certificate of occupa
Oct 18, 2014 · Penalty $1,600
Active
Complaints
- General
Mailbox
May 3, 2017 · Apt 1RR
Close - Door/window
Door
May 3, 2017 · Apt 1RR
Close - Paint/plaster
Ceiling
May 3, 2017 · Apt 1RR
Close - Paint/plaster
Ceiling
May 3, 2017 · Apt 1RR
Close - Paint/plaster
Ceiling
May 3, 2017 · Apt 1RR
Close - Paint/plaster
Wall
May 3, 2017 · Apt 1RR
Close - Door/window
Window frame
May 3, 2017 · Apt 1RR
Close - Flooring/stairs
Floor
May 3, 2017 · Apt 1RR
Close - Plumbing
Basin/sink
May 3, 2017 · Apt 1RR
Close - General
Mailbox
Nov 29, 2016 · Apt 1RR
Close
Show 40 more ↓
- Door/window
Door
Nov 29, 2016 · Apt 1RR
Close - Unsanitary condition
Pests
Nov 29, 2016 · Apt 1RR
Close - Unsanitary condition
Pests
Nov 29, 2016 · Apt 1RR
Close - Paint/plaster
Wall
Nov 29, 2016 · Apt 1RR
Close - Paint/plaster
Ceiling
Nov 29, 2016 · Apt 1RR
Close - Paint/plaster
Wall
Nov 29, 2016 · Apt 1RR
Close - Flooring/stairs
Floor
Nov 29, 2016 · Apt 1RR
Close - Flooring/stairs
Floor
Nov 29, 2016 · Apt 1RR
Close - Door/window
Window frame
Nov 29, 2016 · Apt 1RR
Close - Paint/plaster
Ceiling
Nov 29, 2016 · Apt 1RR
Close - Door/window
Door
Sep 6, 2016 · Apt 1RR
Close - Door/window
Door
Sep 6, 2016 · Apt 1RR
Close - General
Mailbox
Sep 6, 2016 · Apt 1RR
Close - Door/window
Door
Sep 6, 2016 · Apt 1RR
Close - Plumbing
Basin/sink
Sep 6, 2016 · Apt 1RR
Close - Appliance
Electric/gas range
Sep 6, 2016 · Apt 1RR
Close - Electric
Lighting
Sep 6, 2016 · Apt 1RR
Close - Electric
Outlet/switch
Sep 6, 2016 · Apt 1RR
Close - Electric
Outlet/switch
Sep 6, 2016 · Apt 1RR
Close - Paint/plaster
Wall
Sep 6, 2016 · Apt 1RR
Close - Door/window
Window pane
Sep 6, 2016 · Apt 1RR
Close - Safety
Carbon monoxide detector
Sep 6, 2016 · Apt 1RR
Close - Safety
Smoke detector
Sep 6, 2016 · Apt 1RR
Close - Door/window
Window pane
Sep 6, 2016 · Apt 1RR
Close - General
Bell/buzzer/intercom
Sep 6, 2016 · Apt 1RR
Close - Electric
Lighting
Sep 6, 2016 · Apt 1RR
Close - Appliance
Electric/gas range
Sep 6, 2016 · Apt 1RR
Close - Flooring/stairs
Floor
Sep 6, 2016 · Apt 1RR
Close - Flooring/stairs
Floor
Sep 6, 2016 · Apt 1RR
Close - Electric
Lighting
Sep 6, 2016 · Apt 1RR
Close - Door/window
Door
Sep 6, 2016 · Apt 1RR
Close - Door/window
Door
Aug 4, 2016 · Apt 1R
Close - Door/window
Door
Aug 4, 2016 · Apt 1R
Close - General
Bell/buzzer/intercom
Aug 4, 2016 · Apt 1R
Close - Safety
Carbon monoxide detector
Aug 4, 2016 · Apt 1R
Close - Safety
Smoke detector
Aug 4, 2016 · Apt 1R
Close - General
Mailbox
Aug 4, 2016 · Apt 1R
Close - Appliance
Electric/gas range
Aug 4, 2016 · Apt 1R
Close - Electric
Lighting
Aug 4, 2016 · Apt 1R
Close - Plumbing
Basin/sink
Aug 4, 2016 · Apt 1R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K4)
- Year built
- 1950
- Floors
- 2
- Residential units
- 1
- Building area
- 4,400 ft²
- Lot area
- 6,000 ft²
- Zoning
- R5
- Community board
- 311
- Council district
- 43
- Block / lot
- 5755 / 25
- Assessed value
- $326,250
- Landmark / historic district
- No
Questions about 1446 65 Street
Who owns 1446 65 Street?
The owner of record in NYC Department of City Planning PLUTO data is Ingravallo John.
Does 1446 65 Street have violations?
Yes. NYC HPD has recorded 26 housing violations at this property.
Is 1446 65 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1446 65 Street built?
City records list 1950 as the year it was built.
How many apartments are in 1446 65 Street?
It has 1 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.