roofy

1446 65 Street

Brooklyn, NY 11219BBL 3-05755-0025Map

Owner of record: Ingravallo John

1446 65 Street is a store building built in 1950 in Brooklyn, 11219. It has 1 residential unit across 2 floors. The owner of record is Ingravallo John. HPD has recorded 26 housing violations here, most recently on July 8, 2017. 19 of the 26 most recent violations are still open.

HPD violations
26
DOB violations
8
ECB violations
5
HPD complaints
247

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Jul 8, 2017

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 26

  • B

    Provide a safe and adequate supply of electric service to the fixtures in the bathroom located at apt 1rr, 1st story

    Jul 8, 2017 · Apt 1RR

    Open — Nov sent out
  • B

    Provide a safe and adequate supply of electric service to the fixtures in the 1st room from north at west located at apt 1rr, 1st story

    Jul 8, 2017 · Apt 1RR

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor, center in 3rd room from north located at apt 1rr, 1st story

    Jul 8, 2017 · Apt 1RR

    Open — Nov sent out
  • B

    Abate the nuisance consisting of excessive storage of material in 1st room from north at west located at apt 1rr, 1st story

    Jul 8, 2017 · Apt 1RR

    Open — Nov sent out
  • B

    Abate the nuisance consisting of excessive storage of material in 2nd room from north at west located at apt 1rr, 1st story

    Jul 8, 2017 · Apt 1RR

    Open — Nov sent out
  • B

    Replace with new the broken or defective drain pipe at basin/sink. in the bathroom located at apt 1rr, 1st story, 1st apartment from south at west

    May 15, 2017 · Apt 1RR

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective vinil floor tiles. in the entire apartment located at apt 1rr, 1st story, 1st apartment from south at west

    May 15, 2017 · Apt 1RR

    Closed — Violation closed
  • B

    Replace with new the missing mailbox. at public hall, 1st story

    May 15, 2017

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 1rr, 1st story, apartment at west

    Dec 2, 2016 · Apt 1RR

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective linoleum at floor in center in the kitchen located at apt 1rr, 1st story, apartment at west

    Dec 2, 2016 · Apt 1RR

    Open — Nov sent out
Show 16 more ↓
  • B

    Abate the nuisance consisting of excessive storage of material in entire apartment located at apt 1rr, 1st story, apartment at west

    Dec 2, 2016 · Apt 1RR

    Open — Nov sent out
  • B

    Properly repair the broken or defective mortise lock at door in the entrance located at apt 1rr, 1st story, apartment at west

    Dec 2, 2016 · Apt 1RR

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective vinyl floor tile at walking aria in the kitchen located at apt 1rr, 1st story, 1st apartment from east at south

    Apr 12, 2016 · Apt 1RR

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 1rr, 1st story, 1st apartment from east at south

    Apr 12, 2016 · Apt 1RR

    Open — Nov sent out
  • B

    Properly repair the broken or defective electrical outlet at north wall in the kitchen located at apt 1rr, 1st story, 1st apartment from east at south

    Apr 12, 2016 · Apt 1RR

    Open — Nov sent out
  • B

    Properly repair the broken or defective casing at entrance door in the entire apartment located at apt 1rr, 1st story, 1st apartment from east at south

    Apr 12, 2016 · Apt 1RR

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceilings and walls in the entire apartment located at apt 1rr, 1st story, 1st apartment from east at south

    Apr 12, 2016 · Apt 1RR

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in waste line at wash basin in the bathroom located at apt 1rr, 1st story, apartment at south

    Apr 12, 2016 · Apt 1RR

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the kitchen located at apt 1rr, 1st story, apartment at south

    Dec 28, 2015 · Apt 1RR

    Closed — Violation closed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 1rr, 1st story

    Dec 28, 2015 · Apt 1RR

    Open — Nov sent out
  • B

    Properly secure the loose electric wall outlet in the kitchen located at apt 1rr, 1st story, apartment at south

    Dec 28, 2015 · Apt 1RR

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the kitchen located at apt 1rr, 1st story, apartment at south

    Dec 28, 2015 · Apt 1RR

    Open — Nov sent out
  • C

    Replace with new the broken or defective glass pane at lower window sash in the 4th room from north located at apt 1rr, 1st story

    Dec 28, 2015 · Apt 1RR

    Closed — Violation closed
  • A

    Properly repair the broken or defective mailbox door at lobby, 1st story

    Oct 20, 2014 · Apt 1RTREA

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective door lock at vestibule door

    Feb 28, 2014

    Closed — Violation closed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling in the entire apartment located at apt 1rr, 1st story, 1st apartment from south at west

    Dec 15, 2010 · Apt 1RR

    Open — Not complied with

DOB building violations · 8

  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Jan 17, 2020

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 14, 2015

    Dob violation - active

ECB violations · 5

  • Class - 2

    Work without a permit .at time of inspection i bserved at rear expo.3 a wooden structure approx. 40ft(l)x20ft(w)makeshift shed used to store tires . no permit on file., obtain all permits

    Oct 7, 2026 · Penalty $1,250

    Active
  • Class - 1

    Failure to maintain building in code-compliant manner. at time of inspection i observed at front expo.1 vertical and horizontal cracks along roller gate door level ., repair and/replace

    Oct 7, 2026 · Penalty $2,500

    Active
  • Class - 1

    Failure to comply w/ the commissioner's order contained in notice of violation # 35097885h issued on 10/18/14. illegal work at cellar. remedy: comply w/ the commissioner's order

    Dec 6, 2014 · Penalty $2,400

    Active
  • Class - 2

    Occupancy contrary to that allowed by the cofo bldg dept records and/or all applicable laws and regulations. cofo #219379 indicates first tobe store,and construction establishment offices & garage illegal occu

    Oct 18, 2014 · Penalty $1,200

    Active
  • Class - 1

    Work w/o a permit. work noted: partitions erected at 1st flr rear creating four (4) rooms.plumbing lines installed for 3pc bathroom and kit chen w/sink & gas stove. all work is contrary to certificate of occupa

    Oct 18, 2014 · Penalty $1,600

    Active

Complaints

  • General

    Mailbox

    May 3, 2017 · Apt 1RR

    Close
  • Door/window

    Door

    May 3, 2017 · Apt 1RR

    Close
  • Paint/plaster

    Ceiling

    May 3, 2017 · Apt 1RR

    Close
  • Paint/plaster

    Ceiling

    May 3, 2017 · Apt 1RR

    Close
  • Paint/plaster

    Ceiling

    May 3, 2017 · Apt 1RR

    Close
  • Paint/plaster

    Wall

    May 3, 2017 · Apt 1RR

    Close
  • Door/window

    Window frame

    May 3, 2017 · Apt 1RR

    Close
  • Flooring/stairs

    Floor

    May 3, 2017 · Apt 1RR

    Close
  • Plumbing

    Basin/sink

    May 3, 2017 · Apt 1RR

    Close
  • General

    Mailbox

    Nov 29, 2016 · Apt 1RR

    Close
Show 40 more ↓
  • Door/window

    Door

    Nov 29, 2016 · Apt 1RR

    Close
  • Unsanitary condition

    Pests

    Nov 29, 2016 · Apt 1RR

    Close
  • Unsanitary condition

    Pests

    Nov 29, 2016 · Apt 1RR

    Close
  • Paint/plaster

    Wall

    Nov 29, 2016 · Apt 1RR

    Close
  • Paint/plaster

    Ceiling

    Nov 29, 2016 · Apt 1RR

    Close
  • Paint/plaster

    Wall

    Nov 29, 2016 · Apt 1RR

    Close
  • Flooring/stairs

    Floor

    Nov 29, 2016 · Apt 1RR

    Close
  • Flooring/stairs

    Floor

    Nov 29, 2016 · Apt 1RR

    Close
  • Door/window

    Window frame

    Nov 29, 2016 · Apt 1RR

    Close
  • Paint/plaster

    Ceiling

    Nov 29, 2016 · Apt 1RR

    Close
  • Door/window

    Door

    Sep 6, 2016 · Apt 1RR

    Close
  • Door/window

    Door

    Sep 6, 2016 · Apt 1RR

    Close
  • General

    Mailbox

    Sep 6, 2016 · Apt 1RR

    Close
  • Door/window

    Door

    Sep 6, 2016 · Apt 1RR

    Close
  • Plumbing

    Basin/sink

    Sep 6, 2016 · Apt 1RR

    Close
  • Appliance

    Electric/gas range

    Sep 6, 2016 · Apt 1RR

    Close
  • Electric

    Lighting

    Sep 6, 2016 · Apt 1RR

    Close
  • Electric

    Outlet/switch

    Sep 6, 2016 · Apt 1RR

    Close
  • Electric

    Outlet/switch

    Sep 6, 2016 · Apt 1RR

    Close
  • Paint/plaster

    Wall

    Sep 6, 2016 · Apt 1RR

    Close
  • Door/window

    Window pane

    Sep 6, 2016 · Apt 1RR

    Close
  • Safety

    Carbon monoxide detector

    Sep 6, 2016 · Apt 1RR

    Close
  • Safety

    Smoke detector

    Sep 6, 2016 · Apt 1RR

    Close
  • Door/window

    Window pane

    Sep 6, 2016 · Apt 1RR

    Close
  • General

    Bell/buzzer/intercom

    Sep 6, 2016 · Apt 1RR

    Close
  • Electric

    Lighting

    Sep 6, 2016 · Apt 1RR

    Close
  • Appliance

    Electric/gas range

    Sep 6, 2016 · Apt 1RR

    Close
  • Flooring/stairs

    Floor

    Sep 6, 2016 · Apt 1RR

    Close
  • Flooring/stairs

    Floor

    Sep 6, 2016 · Apt 1RR

    Close
  • Electric

    Lighting

    Sep 6, 2016 · Apt 1RR

    Close
  • Door/window

    Door

    Sep 6, 2016 · Apt 1RR

    Close
  • Door/window

    Door

    Aug 4, 2016 · Apt 1R

    Close
  • Door/window

    Door

    Aug 4, 2016 · Apt 1R

    Close
  • General

    Bell/buzzer/intercom

    Aug 4, 2016 · Apt 1R

    Close
  • Safety

    Carbon monoxide detector

    Aug 4, 2016 · Apt 1R

    Close
  • Safety

    Smoke detector

    Aug 4, 2016 · Apt 1R

    Close
  • General

    Mailbox

    Aug 4, 2016 · Apt 1R

    Close
  • Appliance

    Electric/gas range

    Aug 4, 2016 · Apt 1R

    Close
  • Electric

    Lighting

    Aug 4, 2016 · Apt 1R

    Close
  • Plumbing

    Basin/sink

    Aug 4, 2016 · Apt 1R

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Store building (K4)
Year built
1950
Floors
2
Residential units
1
Building area
4,400 ft²
Lot area
6,000 ft²
Zoning
R5
Community board
311
Council district
43
Block / lot
5755 / 25
Assessed value
$326,250
Landmark / historic district
No

Questions about 1446 65 Street

Who owns 1446 65 Street?

The owner of record in NYC Department of City Planning PLUTO data is Ingravallo John.

Does 1446 65 Street have violations?

Yes. NYC HPD has recorded 26 housing violations at this property.

Is 1446 65 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1446 65 Street built?

City records list 1950 as the year it was built.

How many apartments are in 1446 65 Street?

It has 1 residential units and 3 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.