roofy

5301 Ft Hamilton Parkway

Brooklyn, NY 11219BBL 3-05667-0010Map

Owner of record: Bgi LLC

5301 Ft Hamilton Parkway is a mixed residential and retail building built in 1930 in Brooklyn, 11219. It has 4 residential units across 3 floors. The owner of record is Bgi LLC. HPD has recorded 131 housing violations here, most recently on October 27, 2025. 4 of the 50 most recent violations are still open.

HPD violations
131
DOB violations
9
ECB violations
9
HPD complaints
71

What to know

Concern
2 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Oct 27, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 131

  • B

    Properly repair with similar material the broken or defective vinyl tiles at floor in the 1st room from east located at apt 2r, 2nd story, 1st apartment from south at west

    Oct 27, 2025 · Apt 2R

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west

    Oct 27, 2025 · Apt 2R

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west

    Oct 27, 2025 · Apt 2R

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... approximately 1 sqft at ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west original violation 16019208 issued 30-may-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    May 30, 2023 · Apt 2R

    Open — First no access to re- inspect violation
  • B

    Trace and repair the source and abate the visible mold condition... approximately 3qft around the window recess at north wall in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west original violation 16019204 issued 30-may-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    May 30, 2023 · Apt 2R

    Open — First no access to re- inspect violation
  • C

    Properly repair with similar material the broken or defective wood tread 8th from bottom up at public hall stairs, 1st story

    May 30, 2023

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective wood tread 8th and 2nd from bottom up from intermediate landing at public hall stairs, 1st story

    May 30, 2023

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective rubber gasket at lower refrigerator door in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west

    May 30, 2023 · Apt 2R

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... approximately 1 sqft at ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    May 30, 2023 · Apt 2R

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... approximately 3qft around the window recess at north wall in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    May 30, 2023 · Apt 2R

    Closed — Violation closed
Show 40 more ↓
  • C

    Replace or repair the self-closing doors that is missing or defective hinge broken in the entrance located at apt 2r, 2nd story, 1st apartment from south at west

    May 30, 2023 · Apt 2R

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west

    May 30, 2023 · Apt 2R

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north

    Apr 15, 2023 · Apt 3R

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north

    Apr 15, 2023 · Apt 3R

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north

    Apr 15, 2023 · Apt 3R

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jan 12, 2022

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of household items at public hall, 3rd story

    Jan 12, 2022

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north

    Jan 12, 2022 · Apt 2R

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north

    Jan 12, 2022 · Apt 2R

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood doors on base cabinet at south wall in the kitchen located at apt 2r, 2nd story, 1st apartment from west at north

    Jan 12, 2022 · Apt 2R

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north

    Jan 12, 2022 · Apt 2R

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north

    Jan 12, 2022 · Apt 2R

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at west, the 1st room from north at east, the 2nd room from north, the private hallway , the kitchen , the bathroom , the 5th room from north located at apt 2r, 2nd story, 1st apartment from west at north

    Jan 6, 2022 · Apt 2R

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchen located at apt 2r, 2nd story, 1st apartment from west at north

    Jan 6, 2022 · Apt 2R

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north

    Jan 6, 2022 · Apt 2R

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west

    Aug 31, 2020 · Apt 2R

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west

    Aug 31, 2020 · Apt 2R

    Open — Notice of issuance sent to tenant
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 3rd room from east at south located at apt 2r, 2nd story, 1st apartment from south at west

    Jun 2, 2020 · Apt 2R

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of household items at roof bulkhead

    Mar 12, 2020

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective located at apt 3r, 3rd story, 1st apartment from south at west

    Jan 23, 2020 · Apt 3R

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective located at apt 3r, 3rd story, 1st apartment from south at west

    Jan 23, 2020 · Apt 3R

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west

    Jan 23, 2020 · Apt 3R

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east, the private hallway , the kitchen located at apt 3r, 3rd story, 1st apartment from south at west

    Dec 9, 2019 · Apt 3R

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 5th room from east at north located at apt 3r, 3rd story, 1st apartment from south at west

    Dec 9, 2019 · Apt 3R

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the 5th room from east at north located at apt 3r, 3rd story, 1st apartment from south at west

    Dec 9, 2019 · Apt 3R

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective , in the entrance located at apt 3r, 3rd story, 1st apartment from south at west

    Dec 9, 2019 · Apt 3R

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west

    Dec 9, 2019 · Apt 3R

    Closed — Violation dismissed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air condition unit at fire escape window in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west

    Dec 9, 2019 · Apt 3R

    Closed — Violation dismissed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the private hallway located at apt 3r, 3rd story, 1st apartment from south at west

    Dec 5, 2019 · Apt 3R

    Closed — Violation dismissed
  • A

    Provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also door chain guard in the entrance located at apt 3r, 3rd story, 1st apartment from south at west

    Dec 5, 2019 · Apt 3R

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing located at apt 3r, 3rd story, 1st apartment from south at west

    Dec 5, 2019 · Apt 3R

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 3r, 3rd story, 1st apartment from south at west

    Dec 5, 2019 · Apt 3R

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective sink cabinet in the kitchen located at apt 3r, 3rd story, 1st apartment from south at west

    Dec 5, 2019 · Apt 3R

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 3r, 3rd story, 1st apartment from south at west

    Dec 5, 2019 · Apt 3R

    Closed — Violation dismissed
  • B

    Replace with new the broken or defective door in the 1st room from east located at apt 3r, 3rd story, 1st apartment from south at west

    Dec 5, 2019 · Apt 3R

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective at entrance to building , 1st story

    Aug 29, 2019

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of consiting of flower pots at the 2nd and 3rd story balcony on the fire escape at building front

    Jul 3, 2019

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Jul 3, 2019

    Closed — Violation dismissed
  • B

    Replace or repair the self-closing doors that is missing or defective , in the entrance located at apt 2r, 2nd story, 1st apartment from west at north

    Apr 7, 2019 · Apt 2R

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north

    Apr 7, 2019 · Apt 2R

    Closed — Violation dismissed

DOB building violations · 9

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 16, 2022

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 22, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 13, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 7, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 3, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 25, 2020

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Electric signs none

    Es-electric signs none

    Apr 1, 1992

    Dob violation - active
  • Electric signs none

    Es-electric signs none

    Apr 1, 1992

    Dob violation - active

ECB violations · 9

  • Class - 2

    Failure to maintain building in a code compliance manner. at time of inspection building is using 1000 53 street on the building. its actual range is 1026-1036 53 st as per section fc 505 buildings are to have

    Apr 20, 2026 · Penalty $1,250

    Active
  • Class - 1

    Observed at exp.1 & 2 of (5301 ft. hamilton pkwy) corner lot, facade in state of disrepair with mortar missing between brick joints, creating several voids & step cracks at various locations from 3rd flr. windo

    Sep 13, 2022 · Penalty $3,125

    Resolve
  • Class - 1

    Failure to maintain bldg in codecompliant manner note@exp1 front facade above 3fl window step cracks up to parapet wall top cap in middle offacade,also@3fl window on right side lentil above window rusted&fallin

    Nov 18, 2021 · Penalty $6,250

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner.noted:at time ofinspection,observed at exposure 1(front) above the 3rd floor windows of the middle section,exposure 2(left) right corner wall above the 3rd

    Sep 28, 2021 · Penalty $6,250

    Resolve
  • Class - 1

    Failure to maintain bldg in codecompliant manner.observed:@exp1,2,4 several horiz&vert cracks of lengths b/w 4&6',0.3" openings from cornersof windows to coping stone of parapet wall.also,cracks surround corner

    Jul 21, 2021 · Penalty $3,125

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner. noted: observed during inspection of exp#2(53st)top window on corner of bldg step cracking going to coping stone. various vertical cracking above top windows

    Apr 9, 2021 · Penalty $6,250

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner:noted-53rd st side has cracks starting at coping stone.in danger of falling.remedy:repair and/or replace.

    Dec 3, 2020 · Penalty $3,125

    Resolve
  • Class - 1

    On exp 1 (53rd street side) large crack going down from the top of the parapet at roof level the the top of the 3rd floor window, at exp2 stucco layer put on the brick is crumbling away on to the side yard. and

    Sep 3, 2020 · Penalty $3,125

    Resolve
  • Class - 3

    Observed window in bathroom on 1st floor to be broken, & at time of inspection the broken/missing glass to have been replaced with cardboard., repair and or replace; repair/replace

    Aug 9, 2019 · Penalty $250

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Apr 8, 2026 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Oct 25, 2025 · Apt 2R

    Close
  • Paint/plaster

    Wall

    Dec 30, 2022 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Dec 30, 2022 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Jan 1, 2022 · Apt 2R

    Close
  • Appliance

    Refrigerator

    Jan 1, 2022 · Apt 2R

    Close
  • Appliance

    Electric/gas range

    Jan 1, 2022 · Apt 2R

    Close
  • Door/window

    Window frame

    Dec 8, 2021 · Apt 3R

    Close
  • Door/window

    Window pane

    Dec 8, 2021 · Apt 3R

    Close
  • Door/window

    Door frame

    Dec 8, 2021 · Apt 3R

    Close
Show 40 more ↓
  • Door/window

    Door

    Dec 8, 2021 · Apt 3R

    Close
  • Plumbing

    Bathtub/shower

    Dec 8, 2021 · Apt 3R

    Close
  • Heat/hot water

    Apartment only

    Dec 8, 2021 · Apt 3R

    Close
  • General

    Ventilation system

    Nov 25, 2019 · Apt 3R

    Close
  • General

    Cabinet

    Nov 25, 2019 · Apt 3R

    Close
  • Flooring/stairs

    Floor

    Nov 25, 2019 · Apt 3R

    Close
  • Paint/plaster

    Wall

    Nov 25, 2019 · Apt 3R

    Close
  • Door/window

    Door

    Nov 25, 2019 · Apt 3R

    Close
  • Paint/plaster

    Ceiling

    Nov 25, 2019 · Apt 3R

    Close
  • Electric

    Outlet/switch

    Nov 1, 2016 · Apt 3R

    Close
  • Plumbing

    Basin/sink

    Nov 1, 2016 · Apt 3R

    Close
  • Electric

    Outlet/switch

    Nov 1, 2016 · Apt 3R

    Close
  • Paint/plaster

    Ceiling

    Nov 1, 2016 · Apt 3R

    Close
  • Paint/plaster

    Ceiling

    Nov 1, 2016 · Apt 3R

    Close
  • Electric

    Outlet/switch

    Nov 1, 2016 · Apt 3R

    Close
  • Heat/hot water

    Apartment only

    Oct 27, 2016 · Apt 2R

    Close
  • Door/window

    Door

    Nov 29, 2015 · Apt 3R

    Close
  • Door/window

    Window frame

    Nov 9, 2015 · Apt 3R

    Close
  • General

    Cabinet

    Nov 9, 2015 · Apt 3R

    Close
  • Door/window

    Door

    Nov 9, 2015 · Apt BLDG

    Close
  • Paint/plaster

    Ceiling

    Nov 9, 2015 · Apt 3R

    Close
  • Door/window

    Door

    Aug 14, 2015 · Apt 2R

    Close
  • Water leak

    Slow leak

    Aug 14, 2015 · Apt 2R

    Close
  • Paint/plaster

    Wall

    Aug 14, 2015 · Apt 2R

    Close
  • Paint/plaster

    Wall

    Aug 14, 2015 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Aug 14, 2015 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Aug 14, 2015 · Apt 2R

    Close
  • Paint/plaster

    Wall

    Aug 14, 2015 · Apt 2R

    Close
  • General

    Cabinet

    Aug 14, 2015 · Apt 2R

    Close
  • Door/window

    Door

    Aug 14, 2015 · Apt 2R

    Close
  • Door/window

    Door

    Aug 14, 2015 · Apt 2R

    Close
  • Plumbing

    Radiator

    Mar 6, 2015 · Apt 2R

    Close
  • Plumbing

    Radiator

    Mar 6, 2015 · Apt 2R

    Close
  • Door/window

    Door frame

    Mar 6, 2015 · Apt 2R

    Close
  • Electric

    Electric-supply

    Aug 25, 2006 · Apt 2L

    Close
  • Appliance

    Refrigerator

    Aug 25, 2006 · Apt 2L

    Close
  • Electric

    Electric-supply

    Aug 25, 2006 · Apt 2R

    Close
  • Nonconst

    Rubbish

    Aug 25, 2006 · Apt 2R

    Close
  • Electric

    Wiring

    Aug 25, 2006 · Apt 2R

    Close
  • Paint/plaster

    Ceiling

    Aug 25, 2006 · Apt 2R

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S9)
Year built
1930
Floors
3
Residential units
4
Building area
5,412 ft²
Lot area
2,050 ft²
Zoning
R5
Community board
312
Council district
44
Block / lot
5667 / 10
Assessed value
$615,600
Landmark / historic district
No

HPD registration #333470, last renewed Aug 28, 2025.

Questions about 5301 Ft Hamilton Parkway

Who owns 5301 Ft Hamilton Parkway?

The owner of record in NYC Department of City Planning PLUTO data is Bgi LLC.

Does 5301 Ft Hamilton Parkway have violations?

Yes. NYC HPD has recorded 131 housing violations at this property.

Is 5301 Ft Hamilton Parkway rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 5301 Ft Hamilton Parkway built?

City records list 1930 as the year it was built.

How many apartments are in 5301 Ft Hamilton Parkway?

It has 4 residential units and 6 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.