1214 43 Street
Brooklyn, NY 11219BBL 3-05604-0012Map
Owner of record: Yeshivath Diurei Chaim
1214 43 Street is a religious facility built in 1992 in Brooklyn, 11219. The owner of record is Yeshivath Diurei Chaim. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 56
- ECB violations
- 17
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 56
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 29, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 22, 2023
Dob violation - dismissed - Construction other optional
Inspection by department 7/25/23, revealed aprox.20ft x8ft x 12ft deep unsupprtd, unpermttd, excavation with shear cuts. remedy: develop & file permanent repair plans&file dob application work under.permit no later than 2/23/24
Aug 23, 2023
Dob violation - active - Immediate emergency anythingoptional
Erect an 8ft u-shaped construction fence approximately 8ft x10ft x 8ft at corners of exposures 1 and 2 to enclose entire public sidewalk to safeguard the public
Jul 26, 2023
Dob violation - active - Construction other optional
Structure rendered non compliant due to shear cut excavation along exp osure #2 approximately 8wx10dx20'long with no shoring sheeting area is structuraly compromised
Jul 25, 2023
Dob violation - dismissed - Construction other optional
Emer wrk,aprox 24'l x 9'w x 9'd unsuportd,unpermitd excavtn.soil shear cut on 3 sides,existing open foundatn wall@ 1 side.potental.for soil colapse of adj yard, porches & public sidewalk remedy: comply w.code,imediatly retain nys pe,cs&gc,start wrk by 12pm,7/26/23
Jul 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active
Show 40 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 21, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 13, 2019
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 21, 2015
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 30, 2014
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 28, 2012
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 27, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 31, 2007
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 2, 2007
Dob violation - active
ECB violations · 17
- Class - 1
At the time of my inspection 3 story building, i observed at exposure #2 a opening excavated 24ft in length 8ft wide and 9ft deep, leaving the foundation of the adjoining building at exposure #2 exposed with a
Jul 25, 2023 · Penalty $10,000
Resolve - Class - 1
At the time of my inspection 3 story building, i observed at exposure #2 a opening excavated 24ft in length 8ft wide and 9ft deep, leaving the foundation of the adjoining building at exposure #2 exposed. did a
Jul 25, 2023
Resolve - Class - 1
Installation of boilers w/o plans or permits on file with the nyc dob
Mar 30, 2010
Resolve - Class - 1
B154/36-boiler not registered
Mar 30, 2010 · Penalty $200
Active - Class - 1
B154/36-boiler not registered
Mar 30, 2010 · Penalty $200
Active - Class - 1
B154/36-boiler not registered
Mar 30, 2010 · Penalty $200
Active - Class - 1
Plumbing work without permit. work noted: i elevator mechanical removed. original work done under permit# 301009986 which is expired 04/02/2008 and application is signed off. rem: obtain permit by lic sprinkler
Jul 10, 2009 · Penalty $1,600
Active - Class - 1
Failure to have a new or altered plumbing system tested & inspected. work notd: two sprinkler heads removed from elevator mechanical room. rem: perform test by lic contractor.
Jul 10, 2009 · Penalty $1,000
Active - Class - 2
40r7.40r remove sprinkler heads
May 6, 2009 · Penalty $250
Resolve - Non-hazardous
Work without permit - at time of inspection no permit posted at site. research of dept. records shows nb 789/89 for foundation only ex 5/17/91 at time of inspection works exceeds permit. stell and qdeck has bee
Nov 26, 1990 · Penalty $285
Resolve
Show 7 more ↓
- Hazardous
Failure to provide a solid fence as required in the building code at the perimeter of a co,pleted demolition site. remedy: provide a fence.
Mar 20, 1990 · Penalty $1,435
Resolve - Hazardous
Failure to safely and properly remove combustible debris from a demolition site ( in excess of 30 days). bldg demolished prioir to 092790. remedy: remove combustible debris.
Mar 20, 1990 · Penalty $575
Resolve - Hazardous
Failure to provide sidewalk protection in that fence has not been erected at demolotion site and debris has fallen out onto sidewalk. rmedy: provide sidewalk protection as required in the bldg code.
Mar 20, 1990
Resolve - Hazardous
Failure to properly grade site at the completion of demolition operations
Mar 20, 1990 · Penalty $1,435
Resolve - Hazardous
Failure to provide fence at perimeter of completed demolition site: bldg demolished prior to 9/27/89. remedy: provide fence as required in bldg code.
Jan 17, 1990 · Penalty $500
Resolve - Hazardous
Failure to adequately grade site after demolition. remedy: remove debris and grade site for drainage.
Dec 27, 1989 · Penalty $575
Resolve - Hazardous
Failure to provide fence at perimeter of completed demolition site, building demolished prior to 09-28-89
Dec 27, 1989 · Penalty $1,435
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Religious facility (M9)
- Year built
- 1992
- Floors
- 3
- Residential units
- —
- Building area
- 13,600 ft²
- Lot area
- 5,008 ft²
- Zoning
- R6
- Community board
- 312
- Council district
- 44
- Block / lot
- 5604 / 12
- Assessed value
- $1,103,400
- Landmark / historic district
- No
Questions about 1214 43 Street
Who owns 1214 43 Street?
The owner of record in NYC Department of City Planning PLUTO data is Yeshivath Diurei Chaim.
Does 1214 43 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 1214 43 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1214 43 Street built?
City records list 1992 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.