1953 65 Street
Brooklyn, NY 11204BBL 3-05548-0056Map
Owner of record: Shefa Owners Corp
1953 65 Street is a walk-up apartment building built in 1931 in Brooklyn, 11204. It has 21 residential units across 4 floors. The owner of record is Shefa Owners Corp. HPD has recorded 18 housing violations here, most recently on May 2, 2025. 1 of the 18 most recent violations are still open.
- HPD violations
- 18
- DOB violations
- 8
- ECB violations
- 1
- HPD complaints
- 29
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 18
- BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor, at 1st fire passage way from north at east
May 2, 2025
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner units protruding beyond window sills more than 4 inches at 2nd and 4th story balconies, west stack, building front at fire escape
Oct 20, 2021
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at north wall and ceiling in bulkhead at public hall
Oct 20, 2021
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department north wall and ceiling in bulkhead at public hall
Oct 20, 2021
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of garbage bags being stored at the front entrance to the areaway at east at the front of the building obstructing egress from the firepassageway to the street
Jul 6, 2020
Closed — Violation closed - BHazardous
Fire egress defective. remove the obstruction in fireproof passageway consisting of garbage bins being stored at fire passage way at east
Jul 6, 2020
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1a, 1st story, 1st apartment from west at north
Aug 30, 2019 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tile at the end wall of bathtub in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Aug 30, 2019 · Apt 1A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the kitchen located at apt 1a, 1st story, 1st apartment from west at north
Aug 30, 2019 · Apt 1A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective sink base cabinet in the kitchen located at apt 1a, 1st story, 1st apartment from west at north
Aug 30, 2019 · Apt 1A
Closed — Violation closed
Show 8 more ↓
- BHazardous
Properly repair with similar material the broken or defective base and wall cabinets at north wall in the kitchen located at apt 1a, 1st story, 1st apartment from west at north
Aug 30, 2019 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... at ceiling apprx. 50 sq. feet in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Aug 30, 2019 · Apt 1A
Open — Defect letter issued - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and all walls in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Aug 30, 2019 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective washbasin cabinet in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Aug 30, 2019 · Apt 1A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the private hallway located at apt 1a, 1st story, 1st apartment from west at north
Aug 30, 2019 · Apt 1A
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Aug 30, 2019 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Aug 30, 2019 · Apt 1A
Closed — Violation dismissed - BHazardous
Replace with new the missing lids for garbage cans at building front south
Aug 21, 2019
Closed — Violation dismissed
DOB building violations · 8
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 1
- Class - 2
50,50a,50b,50c,50d,50e,50f,50g,50h. 50-chamber door gasket defective;50a-hw mxing valve defective; 50b-boiler safety valves missing seat drain piped to floor; 50c-anti-syphon oil valve not installed at highest
May 5, 2017 · Penalty $2,500
Active
Complaints
- Plumbing
Water supply
Feb 25, 2026 · Apt BLDG
Close - Plumbing
Water supply
Feb 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 17, 2026 · Apt BLDG
Close - Electric
Wiring
Jan 7, 2026 · Apt 4
Close - Heat/hot water
Entire building
Oct 25, 2025 · Apt 4B
Close - General
Bell/buzzer/intercom
Sep 7, 2025 · Apt 1A
Close - Unsanitary condition
Garbage/recycling storage
Jan 14, 2025 · Apt 4E4D
Close - Safety
Sprinkler
May 15, 2023 · Apt 2A
Close - Heat/hot water
Entire building
May 15, 2023 · Apt 2A
Close - Unsanitary condition
Pests
May 15, 2023 · Apt 2A
Close
Show 19 more ↓
- Heat/hot water
Entire building
Oct 23, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 18, 2022 · Apt 2B
Close - Heat/hot water
Entire building
Oct 25, 2021 · Apt 2A
Close - Heat/hot water
Entire building
Oct 18, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 2, 2020 · Apt 3E
Close - Heat/hot water
Entire building
Oct 27, 2020 · Apt 4A
Close - Unsanitary condition
Garbage/recycling storage
Jul 23, 2020 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 23, 2020 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 2, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 15, 2019 · Apt 1A
Close - Heat/hot water
Entire building
Oct 8, 2019 · Apt 3B
Close - Flooring/stairs
Floor
Aug 9, 2019 · Apt 1A
Close - Plumbing
Basin/sink
Aug 9, 2019 · Apt 1A
Close - Plumbing
Bathtub/shower
Aug 9, 2019 · Apt 1A
Close - Paint/plaster
Wall
Aug 9, 2019 · Apt 1A
Close - Heat/hot water
Entire building
Feb 4, 2018 · Apt 2A
Close - Door/window
Door
Nov 26, 2017 · Apt 4A
Close - General
Bell/buzzer/intercom
Nov 26, 2017 · Apt 4A
Close - Plumbing
Water supply
Jul 25, 2007 · Apt 4D
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Aug 10, 2026 | $345,000 | Coops - walkup apartments | — |
| Nov 19, 2025 | $278,000 | Coops - walkup apartments | — |
Building details
- Building type
- Walk-up apartment building (C6)
- Year built
- 1931
- Floors
- 4
- Residential units
- 21
- Building area
- 18,920 ft²
- Lot area
- 5,500 ft²
- Zoning
- R5
- Community board
- 311
- Council district
- 43
- Block / lot
- 5548 / 56
- Assessed value
- $592,200
- Landmark / historic district
- No
HPD registration #331900, last renewed Sep 5, 2025.
Questions about 1953 65 Street
Who owns 1953 65 Street?
The owner of record in NYC Department of City Planning PLUTO data is Shefa Owners Corp.
Does 1953 65 Street have violations?
Yes. NYC HPD has recorded 18 housing violations at this property.
Is 1953 65 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1953 65 Street built?
City records list 1931 as the year it was built.
How many apartments are in 1953 65 Street?
It has 21 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.