roofy

1520 61 Street

Brooklyn, NY 11219BBL 3-05523-0015Map

Owner of record: 1522 61 St LLC

1520 61 Street is a walk-up apartment building built in 1931 in Brooklyn, 11219. It has 4 residential units across 2 floors. The owner of record is 1522 61 St LLC. HPD has recorded 18 housing violations here, most recently on May 1, 2026. 12 of the 18 most recent violations are still open.

HPD violations
18
DOB violations
0
ECB violations
2
HPD complaints
48

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation May 1, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 18

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 1, 2026

    Open — Nov sent out
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor of the cellar staircase enclosure at front areaway

    May 22, 2025

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in the floor drain at cellar staircase enclosure, at front areaway

    May 22, 2025

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    May 22, 2025

    Open — Nov sent out
  • A

    Post a sign indicating hours of collection and method of collection of waste material where dumbwaiter service is not provided. at public hall, 1st story

    May 22, 2025

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    May 22, 2025

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south

    Feb 12, 2021 · Apt 2R

    Closed — Violation dismissed
  • B

    Remove all obstructions and repair all defects in waste line at sink in the kitchen located at apt 1f, 1st story, 1st apartment from east at south

    Dec 24, 2020 · Apt 1F

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hotwater fixtures in the entire apartment located at apt 1f, 1st story, 1st apartment from north at east

    Dec 10, 2020 · Apt 1F

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective located at apt 2r, 2nd story, 1st apartment from south at west

    Jan 31, 2018 · Apt 2R

    Open — Nov sent out
Show 8 more ↓
  • B

    Repair or replace the carbon monoxide detecting device(s). defective located at apt 2r, 2nd story, 1st apartment from south at west

    Jan 31, 2018 · Apt 2R

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of household items at scuttle ladder , 2nd story

    Jan 31, 2018

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department ceilings and walls in the entire apartment located at apt 1r, 1st story, apartment at west

    Apr 15, 2011 · Apt 1R

    Open — Not complied with
  • B

    Section 53,187,231 m/d law & dept rules & reg. provide means of egress from yard to street by fireproof passageway for which application must be filed for approval,or by unlocked door or gate in fence to adjoining premises with consent of adjacent owner.

    Apr 15, 2011

    Open — Not complied with
  • B

    Replace with new the broken or defective glass upper and lower sashes windows at celler

    Apr 15, 2011

    Open — Not complied with
  • C

    Remove or cover in a manner approved by the department the peeling lead paint walls northwest room 2 sty apt 2f rodriguez 259 7991 er1 44828 , section '' ''

    Aug 27, 1999 · Apt 2F

    Closed — Violation closed
  • C

    Remove or cover in a manner approved by the department the peeling lead paint closet doors northeast room 2 sty front apt 2f rodriguez 259 7991 er1 34549 , section '' ''

    Jul 7, 1999 · Apt 2F

    Closed — Violation closed
  • C

    Remove or cover in a manner approved by the department the peeling lead paint ceiling kitchen 2 sty front apt 2f er1 34549 , section '' ''

    Jul 7, 1999 · Apt 2F

    Closed — Violation closed

DOB building violations · 0

No DOB violations on record

ECB violations · 2

  • Hazardous

    Failure to provide at least two means of egress from room or space where required. noted: there is no secondary means of egress for either apartment at 2nd floor with no fire escape and no sprinkler in public

    Jan 5, 2005 · Penalty $480

    Active
  • Hazardous

    Failure to maintain building - hazardous noted: 1) exterior east wall in excessive disrepair at base ledge with large holes/cracks/erosion 2) no lock on front entrance door, no luck or knob on foyer entrance

    Jan 5, 2005 · Penalty $800

    Resolve

Complaints

  • Unsanitary condition

    Garbage/recycling storage

    Jul 2, 2025 · Apt 1F

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 24, 2025 · Apt 1F

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 21, 2025 · Apt 1F

    Close
  • Unsanitary condition

    Pests

    Apr 21, 2025 · Apt 1F

    Close
  • Heat/hot water

    Entire building

    Mar 2, 2025 · Apt 1F

    Close
  • Heat/hot water

    Apartment only

    Feb 4, 2025 · Apt 1F

    Close
  • Heat/hot water

    Entire building

    Feb 5, 2023 · Apt 1R

    Close
  • Heat/hot water

    Entire building

    Feb 9, 2021 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Dec 20, 2020 · Apt 1F

    Close
  • Heat/hot water

    Apartment only

    Dec 10, 2020 · Apt 2F

    Close
Show 38 more ↓
  • Heat/hot water

    Entire building

    Dec 7, 2020 · Apt 1F

    Close
  • Heat/hot water

    Apartment only

    Jan 30, 2018 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    May 8, 2017 · Apt 2F

    Close
  • Heat/hot water

    Entire building

    May 8, 2017 · Apt 1R

    Close
  • Paint/plaster

    Wall

    Nov 21, 2014 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Nov 21, 2014 · Apt 2F

    Close
  • Paint/plaster

    Ceiling

    Nov 21, 2014 · Apt 2F

    Close
  • Door/window

    Window frame

    Nov 21, 2014 · Apt 2F

    Close
  • Paint/plaster

    Ceiling

    Nov 21, 2014 · Apt 2F

    Close
  • Flooring/stairs

    Floor

    Nov 21, 2014 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Nov 21, 2014 · Apt 2F

    Close
  • Flooring/stairs

    Floor

    Nov 21, 2014 · Apt 2F

    Close
  • Heating

    Heat related

    Dec 23, 2011 · Apt 2R

    Close
  • Nonconst

    Vermin

    Aug 24, 2011 · Apt 2F

    Close
  • Nonconst

    Vermin

    Aug 24, 2011 · Apt 2F

    Close
  • Nonconst

    Vermin

    Aug 24, 2011 · Apt 2F

    Close
  • Heating

    Heat related

    Dec 5, 2010 · Apt BLDG

    Close
  • Heating

    Heat related

    Dec 4, 2010 · Apt 2F

    Close
  • Heating

    Heat related

    Nov 24, 2010 · Apt 1R

    Close
  • Nonconst

    Rubbish

    Oct 6, 2010 · Apt BLDG

    Close
  • Electric

    Lighting

    Oct 6, 2010 · Apt BLDG

    Close
  • Nonconst

    Rubbish

    Oct 6, 2010 · Apt BLDG

    Close
  • Nonconst

    Rubbish

    Oct 6, 2010 · Apt BLDG

    Close
  • General

    Mold

    Oct 28, 2005 · Apt 2F

    Close
  • Plumbing

    Water-leaks

    Oct 28, 2005 · Apt 2F

    Close
  • Heating

    Heat related

    Oct 28, 2005 · Apt 2F

    Close
  • General

    Locks

    Dec 23, 2004 · Apt 1F

    Close
  • Heating

    Radiator

    Dec 23, 2004 · Apt 1F

    Close
  • General

    Locks

    Dec 23, 2004 · Apt 1F

    Close
  • Electric

    Wiring

    Dec 23, 2004 · Apt 1F

    Close
  • General

    Floor

    Dec 23, 2004 · Apt 1F

    Close
  • Paint/plaster

    Ceiling

    Dec 23, 2004 · Apt 1F

    Close
  • General

    Windows

    Dec 23, 2004 · Apt 1F

    Close
  • Paint/plaster

    Ceiling

    Dec 23, 2004 · Apt 1F

    Close
  • Paint/plaster

    Wall

    Dec 23, 2004 · Apt 1F

    Close
  • General

    Stairs

    Jul 28, 2003 · Apt BLDG

    Close
  • General

    Stairs

    Jul 28, 2003 · Apt BLDG

    Close
  • General

    Stairs

    Jul 28, 2003 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C3)
Year built
1931
Floors
2
Residential units
4
Building area
3,280 ft²
Lot area
2,000 ft²
Zoning
M1-1
Community board
311
Council district
43
Block / lot
5523 / 15
Assessed value
$448,200
Landmark / historic district
No

HPD registration #308021, last renewed —.

Questions about 1520 61 Street

Who owns 1520 61 Street?

The owner of record in NYC Department of City Planning PLUTO data is 1522 61 St LLC.

Does 1520 61 Street have violations?

Yes. NYC HPD has recorded 18 housing violations at this property.

Is 1520 61 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1520 61 Street built?

City records list 1931 as the year it was built.

How many apartments are in 1520 61 Street?

It has 4 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.