3802 15 Avenue
Brooklyn, NY 11218BBL 3-05347-7501Map
Owner of record: 15th Ave Condo Gardens Associates
3802 15 Avenue is a condominium built in 1983 in Brooklyn, 11218. It has 22 residential units across 3 floors. The owner of record is 15th Ave Condo Gardens Associates. HPD has recorded 40 housing violations here, most recently on November 7, 2024. 9 of the 40 most recent violations are still open.
- HPD violations
- 40
- DOB violations
- 25
- ECB violations
- 1
- HPD complaints
- 11
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 40
- BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at boiler room
Nov 7, 2024
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jul 1, 2024
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor [ missing accessable frame ] at public hall, 1st story
Jul 1, 2024
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jul 1, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective [ hinges] at the front entrance to building , , 1st story
Jul 1, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective [latch set assembly] at the vestibule door, at public hall, 1st story
Jul 1, 2024
Closed — Violation closed - BHazardous
Remove the illegal fastening slidebolt capable to be padlocked installed on bulkhead door at public hall stairs, 3rd story
May 11, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 29, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 29, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 20, 2023
Closed — Violation dismissed
Show 30 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 9, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 9, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 9, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 8, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 8, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 8, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 8, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 18, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 18, 2022
Closed — Violation dismissed - CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the .. at boiler room
Apr 29, 2021
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 6, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 6, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Sep 5, 2020
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ... at public hall, 1st story
Sep 5, 2020
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Sep 5, 2020
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 5, 2020
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story
Sep 5, 2020
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Sep 5, 2020
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Oct 5, 2018
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at the bulkhead area at public hall
Sep 27, 2016
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective water supply pipe at top of expansion tank at boiler at cellar
Sep 27, 2016
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door ... in the entrance located at apt 22, 3rd story, 1st apartment from east at south , section ''3806'', at north
Sep 27, 2016 · Apt 22
Closed — Violation closed - BHazardous
Section 185, 240 m/d law properly fire retard in accordance with the rules and regulations of this department the cellar ceiling with approved material at cellar
Feb 18, 2015
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceililing and all walls all stories at public hall
Oct 3, 2014
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items all stories at public hall
Oct 3, 2014
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective fire retardent at ceilings, walls, 2nd story, at public hall
Aug 21, 2012
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective fire retardent at ceilings, walls, 1st story, at public hall
Aug 21, 2012
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective fire retardent at ceilings, walls, 3rd story, at public hall
Aug 21, 2012
Closed — Violation dismissed
DOB building violations · 25
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 22, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2023
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - active
Show 15 more ↓
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active
ECB violations · 1
- Class - 2
Electrical work without permit. noted: at a 3-story multi dwelling observed installation of electrical wiring for 7 split system air conditioning units, 4 at exposure 1 and 3 at exposure 3. including connection
Aug 13, 2026 · Penalty $1,250
Active
Complaints
- Plumbing
Water supply
Jun 28, 2024 · Apt 19
Close - Plumbing
Water supply
Jun 27, 2024 · Apt BLDG
Close - Appliance
Electric/gas range
Jan 21, 2024 · Apt 6
Close - Heat/hot water
Apartment only
Jan 21, 2024 · Apt 6
Close - Flooring/stairs
Stairs
Sep 1, 2020 · Apt 1
Close - Paint/plaster
Window/frame
Aug 14, 2012 · Apt 22
Close - Electric
Wiring
Aug 14, 2012 · Apt 22
Close - Plumbing
Water-leaks
Aug 14, 2012 · Apt 22
Close - Paint/plaster
Window/frame
Aug 14, 2012 · Apt 22
Close - Paint/plaster
Ceiling
Aug 14, 2012 · Apt 22
Close
Show 1 more ↓
- Nonconst
Vermin
Sep 5, 2007 · Apt 12
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (R2)
- Year built
- 1983
- Floors
- 3
- Residential units
- 22
- Building area
- 28,288 ft²
- Lot area
- 38,070 ft²
- Zoning
- R6
- Community board
- 312
- Council district
- 39
- Block / lot
- 5347 / 7501
- Assessed value
- $1,198,582
- Landmark / historic district
- No
HPD registration #375904, last renewed Oct 2, 2025.
Questions about 3802 15 Avenue
Who owns 3802 15 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 15th Ave Condo Gardens Associates.
Does 3802 15 Avenue have violations?
Yes. NYC HPD has recorded 40 housing violations at this property.
Is 3802 15 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 3802 15 Avenue built?
City records list 1983 as the year it was built.
How many apartments are in 3802 15 Avenue?
It has 22 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.