1354 38 Street
Brooklyn, NY 11218BBL 3-05299-0029Map
Owner of record: Neustein, David
1354 38 Street is a two-family home built in 1910 in Brooklyn, 11218. It has 2 residential units across 2 floors. The owner of record is Neustein, David. HPD has recorded 55 housing violations here, most recently on October 5, 2022. 43 of the 50 most recent violations are still open.
- HPD violations
- 55
- DOB violations
- 2
- ECB violations
- 2
- HPD complaints
- 47
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 55
- CImmediately hazardous
Abate the nuisance consisting of hot water exceeds the maximum temperature of 130 degrees at all fixtures in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from east at south
Oct 5, 2022 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from east at south
Oct 5, 2022 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from east at south
Oct 5, 2022 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling inside closet at north in the private hallway located at apt 2ndflo, 2nd story, 1st apartment from east at south
Oct 5, 2022 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak ceiling inside closet at north in the private hallway located at apt 2ndflo, 2nd story, 1st apartment from east at south
Oct 5, 2022 · Apt 2NDFLO
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls inside closet at north in the private hallway located at apt 2ndflo, 2nd story, 1st apartment from east at south
Oct 5, 2022 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of boxes, and household items at public hall, 2nd story
Oct 5, 2022
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2nd fl, 2nd story, 1st apartment from east at south
Aug 20, 2022 · Apt 2ND FL
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2nd fl, 2nd story, 1st apartment from east at south
Aug 20, 2022 · Apt 2ND FL
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2nd fl, 2nd story, 1st apartment from east at south
Aug 20, 2022 · Apt 2ND FL
Open — Nov sent out
Show 40 more ↓
- BHazardous
Remove all encumbrances consisting of household items, boxes at public hall, 2nd story
Aug 20, 2022
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 16, 2021
Open — Info nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from east at south
Dec 15, 2021 · Apt 2
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Sep 18, 2018
Open — Info nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at the north wall in the 1st private hallway from north located at apt 1, 1st story
Sep 13, 2018 · Apt 1
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at the ceiling and north wall in the 2nd private hallway from north located at apt 1, 1st story
Sep 13, 2018 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of excessive electrical extention cords throughout in the entire apartment located at apt 1, 1st story
Sep 13, 2018 · Apt 1
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). : missing in the entire apartment located at apt 1, 1st story
Sep 13, 2018 · Apt 1
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective intercom system in the entire apartment located at apt 1, 1st story
Sep 13, 2018 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures throughout in the entire apartment located at apt 1, 1st story
Sep 13, 2018 · Apt 1
Closed — Violation closed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling in the bathroom located at apt 1, 1st story
Sep 4, 2018 · Apt 1
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures the ceiling in the 3rd room from east at south located at apt 1, 1st story
Sep 4, 2018 · Apt 1
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures electric outlet at the south wall in the 3rd room from east at south located at apt 1, 1st story
Sep 4, 2018 · Apt 1
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures ..electric outlets at the east and south walls in the 1st room from east located at apt 1, 1st story
Sep 4, 2018 · Apt 1
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures ..electric outlet at the north wall in the 4th room from east at south located at apt 1, 1st story
Sep 4, 2018 · Apt 1
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures .. the light fixture at ceiling in the 4th room from east at south located at apt 1, 1st story
Sep 4, 2018 · Apt 1
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling in the 6th room from east located at apt 1, 1st story
Sep 4, 2018 · Apt 1
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures .. the light fixture at the east wall in the private hallway located at apt 1, 1st story
Sep 4, 2018 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of extension electric wires running from the outlet at the east wall in the 2nd room from east at north to the ceiling fixtures in the bathroom and the 4th room from east at south located at apt 1, 1st story
Sep 4, 2018 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling over the doorway in the 2nd room from east at north located at apt 1, 1st story
Sep 4, 2018 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling over the doorway in the 2nd room from east at north located at apt 1, 1st story
Sep 4, 2018 · Apt 1
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 1, 1st story
Sep 4, 2018 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective inoperative bell buzzer system from bldg. entrance to apartment #1 , 1st story
Sep 4, 2018
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at .. at public hall, 1st story
Nov 16, 2017
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Nov 16, 2017
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 1fl, 1st story
May 15, 2015 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the bathroom located at apt 1fl, 1st story
May 15, 2015 · Apt 1FL
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1fl, 1st story
May 15, 2015 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color all walls in the private hallway located at apt 1fl, 1st story
May 15, 2015 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the private hallway located at apt 1fl, 1st story
May 15, 2015 · Apt 1FL
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from north located at apt 1fl, 1st story
May 15, 2015 · Apt 1FL
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 1fl, 1st story
May 15, 2015 · Apt 1FL
Open — Nov sent out - BHazardous
Properly repair the broken or defective locking device entrance door located at apt 2, 2nd story
Jun 20, 2008 · Apt 2
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 2, 2nd story
Jun 20, 2008 · Apt 2
Open — Nov sent out - ANon-hazardous
Refit entrance door vestibule at public hall, 1st story
Jun 20, 2008
Open — Nov sent out - BHazardous
Replace with new the missing door knobs entrance door vestibule at public hall, 1st story
Jun 20, 2008
Open — Nov sent out - BHazardous
Properly repair the broken or defective glass door at west wall in the kitchen located at apt 2, 2nd story
Oct 30, 2007 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective upper and lower sash at south window in the 3rd room from east located at apt 2, 2nd story, 1st apartment from south at west
Oct 30, 2007 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and walls in the 3rd room from east located at apt 2, 2nd story, 1st apartment from south at west
Oct 30, 2007 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective locking device at door in the entrance located at apt 2, 2nd story, 1st apartment from south at west
Oct 30, 2007 · Apt 2
Open — Nov sent out
DOB building violations · 2
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 4, 2019
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 13, 2007
Dob violation - active
ECB violations · 2
- Class - 1
At time of my inspection i observed a stoppage not addressed in the cellar causing feces and smell in the cellar., repair and/replace
Jun 13, 2019 · Penalty $3,125
Resolve - Hazardous
Occupancy contrary to that allowed by c of o and dept of bldgs records. class "a" apt created at basement fixtures present. remedy: restore premises to legal occupancy
Jul 20, 2007
Resolve
Complaints
- Heat/hot water
Apartment only
Oct 3, 2022 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Aug 23, 2022 · Apt 2FLOOR
Close - General
Cooking gas
Aug 23, 2022 · Apt 2FLOOR
Close - Heat/hot water
Apartment only
Aug 19, 2022 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Aug 19, 2022 · Apt 2NDFLO
Close - General
Cooking gas
Aug 19, 2022 · Apt ANDFLO
Close - General
Cooking gas
Aug 19, 2022 · Apt SECOND
Close - Electric
Power outage
Aug 19, 2022 · Apt SECOND
Close - Heat/hot water
Apartment only
Dec 21, 2021 · Apt 1
Close - Heat/hot water
Entire building
Dec 14, 2021 · Apt BLDG
Close
Show 37 more ↓
- Heat/hot water
Apartment only
Dec 8, 2021 · Apt 5
Close - Heat/hot water
Entire building
Dec 4, 2021 · Apt 1STFLO
Close - Heat/hot water
Entire building
Nov 27, 2021 · Apt 1
Close - Electric
Power outage
Aug 27, 2018 · Apt 1
Close - Electric
Power outage
Aug 27, 2018 · Apt 1
Close - Electric
No lighting
Dec 8, 2017 · Apt 1
Close - Electric
No lighting
Dec 8, 2017 · Apt 1
Close - Electric
No lighting
Dec 8, 2017 · Apt 1
Close - Electric
No lighting
Dec 8, 2017 · Apt 1
Close - Heat/hot water
Apartment only
Dec 8, 2017 · Apt 1
Close - Heat/hot water
Entire building
Dec 8, 2017 · Apt 1
Close - Heat/hot water
Entire building
Nov 14, 2017 · Apt 2B
Close - Water leak
Heavy flow
Sep 15, 2015 · Apt 1
Close - Water leak
Heavy flow
Sep 15, 2015 · Apt 1
Close - Water leak
Slow leak
May 5, 2015 · Apt 1FL
Close - Water leak
Slow leak
May 5, 2015 · Apt 1FL
Close - Water leak
Slow leak
May 5, 2015 · Apt 1FL
Close - Paint/plaster
Ceiling
May 5, 2015 · Apt 1FL
Close - Plumbing
Radiator
Dec 3, 2007 · Apt 2
Close - General
Doors
Dec 3, 2007 · Apt 2
Close - Paint/plaster
Ceiling
Oct 29, 2007 · Apt 2
Close - General
Doors
Oct 29, 2007 · Apt 2
Close - General
Doors
Oct 29, 2007 · Apt 2
Close - Paint/plaster
Ceiling
Oct 29, 2007 · Apt 2
Close - Construction
Roof
Oct 29, 2007 · Apt 2
Close - General
Windows
Oct 29, 2007 · Apt 2
Close - Construction
Roof
Oct 29, 2007 · Apt 2
Close - Electric
Electric-supply
Oct 29, 2007 · Apt 2
Close - Paint/plaster
Ceiling
Oct 29, 2007 · Apt 2
Close - Paint/plaster
Ceiling
Oct 29, 2007 · Apt 2
Close - Electric
Electric-supply
Oct 29, 2007 · Apt 2
Close - Electric
Electric-supply
Oct 29, 2007 · Apt 2
Close - Paint/plaster
Ceiling
Oct 29, 2007 · Apt 2
Close - General
Windows
Oct 29, 2007 · Apt 2
Close - Paint/plaster
Ceiling
Oct 29, 2007 · Apt 2
Close - General
Windows
Oct 29, 2007 · Apt 2
Close - Paint/plaster
Ceiling
Oct 29, 2007 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B1)
- Year built
- 1910
- Floors
- 2
- Residential units
- 2
- Building area
- 2,068 ft²
- Lot area
- 1,903 ft²
- Zoning
- M1-2/R6B
- Community board
- 312
- Council district
- 39
- Block / lot
- 5299 / 29
- Assessed value
- $88,380
- Landmark / historic district
- No
Questions about 1354 38 Street
Who owns 1354 38 Street?
The owner of record in NYC Department of City Planning PLUTO data is Neustein, David.
Does 1354 38 Street have violations?
Yes. NYC HPD has recorded 55 housing violations at this property.
Is 1354 38 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1354 38 Street built?
City records list 1910 as the year it was built.
How many apartments are in 1354 38 Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.