2604 Farragut Road
Brooklyn, NY 11210BBL 3-05249-0035Map
Owner of record: New Brooklyn Development LLC
2604 Farragut Road is a hotel built in 2007 in Brooklyn, 11210. The owner of record is New Brooklyn Development LLC. HPD has recorded 40 housing violations here, most recently on June 21, 2026. 11 of the 40 most recent violations are still open.
- HPD violations
- 40
- DOB violations
- 46
- ECB violations
- 56
- HPD complaints
- 95
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 40
- BHazardous
Remove all obstructions and repair all defects in at waste line at wash basin in the bathroom located at apt 409, 4th story, 1st apartment from east at south
Jun 21, 2026 · Apt 409
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 409, 4th story, 1st apartment from east at south
Mar 25, 2026 · Apt 409
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked to boiler room at boiler room
Mar 25, 2026
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 18, 2025
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective light fixtures at ceiling at public hall, 3rd story, section ''south''
Mar 15, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective light fixtures at ceiling at public hall, 3rd story, section ''south''
Feb 25, 2025
Closed — Violation closed - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at the ceiling at public hall, 3rd story
Feb 5, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling at public hall, 3rd story, section ''south''
Jan 30, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the 1st room from north located at b-room 815, 8th story, 5th b-room from east at south
Jan 29, 2025 · Apt 815
Closed — Violation closed
Show 30 more ↓
- CImmediately hazardous
Provide adequate supply of hot water for the fixtures kitchen and bathroom in the entire apartment located at apt 825, 8th story, 1st apartment from north at east
Jan 28, 2025 · Apt 825
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 26, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 213, 2nd story, 3rd apartment from west at north
Jul 18, 2024 · Apt 213
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked at boiler room
Jul 18, 2024
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 315a, 3rd story, 5th apartment from south at west
Jul 16, 2024 · Apt 315A
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 321, 3rd story, 2nd apartment from west at north
Jul 16, 2024 · Apt 321
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 17, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 7, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 10, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 10, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 20, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 21, 2020
Open — Violation will be reinspected - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jan 21, 2020
Open — Violation will be reinspected - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Jan 21, 2020
Open — Violation will be reinspected - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 21, 2020
Open — Violation will be reinspected - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Jan 21, 2020
Open — Violation will be reinspected - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jan 21, 2020
Open — Violation will be reinspected - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jan 21, 2020
Open — Violation will be reinspected - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Jan 21, 2020
Open — Violation will be reinspected - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration consisting of drop ceiling install at public hall, 1st story
Jan 21, 2020
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 6, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 26, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 11, 2017
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 101, 1st story, 1st apartment from west at north
May 15, 2017 · Apt 101
Open — Violation will be reinspected - CImmediately hazardous
Provide ready access to buildings heating system .. at boiler room
May 15, 2017
Open — Violation will be reinspected - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 30, 2016
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Mar 25, 2016
Open — Violation will be reinspected
DOB building violations · 46
- Construction other optional
Borough commissioner has ordered all work stopped underpermit# b00911674-i1 on 3/26/26.
Mar 27, 2026
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2024
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)
Jun 23, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 22, 2024
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed
Show 36 more ↓
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)
Oct 10, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 23, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 23, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2019
Jun 29, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 12, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 12, 2019
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 12, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 12, 2016
Dob violation - resolved - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 5, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 5, 2015
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 12, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 12, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 17, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 17, 2010
Dob violation - resolved - Construction other optional
Failure to comply with swo noted: under permit #302384159 swo issued 03/03/08 for inadequate shoring work contrary to order all form work from poured foundation has been stripped additional lagging has been installed with no approved soil removal remedy: comply with swo forthwith
Mar 14, 2008
Dob violation - dismissed - Construction other optional
Failure to protect the sides of excavation carried to a depth greater than 5 feet noted: under app# 302384159 issued on 12/27/07 on exposure #4 an approx 10' deep sheer cut with no shoring was excavated undermi ning adj property rear yard remedy: stop all work backfill & make safe call engrs for amended plans approval
Mar 3, 2008
Dob violation - dismissed - Construction other optional
Underpinning sheeting shoring does not conform to plan noted: under app# 302384159 approved plan for shoring states soldier piles are to be 10x58x32 feet long contractor is using 8x35 25 foot long underpinni ng approved plan states box pits to be used with approach pits plank remedy: stop all work only to make safe conform to plan if feasible
Nov 24, 2007
Dob violation - dismissed - Construction other optional
Failure to comply with stop work order. noted: under app# 302384159 swo issued on 10/24/07 in morning at 9:45 specifically states that only work to be performed was to make safe not to install framework for footings. (stop all work) remedy: comply with stop work order forthwith
Oct 24, 2007
Dob violation - dismissed - Construction other optional
Failure to protect sides of excavation carried to a depth greater than 5 feet noted: excavation under app # 302384159 carried to a depth approx 10' deep with no sheeting shoring protection remedy; provide shoring, stable 45 degree angle of repose
Oct 2, 2007
Dob violation - dismissed - Plumbing none
P-plumbing none
Aug 23, 1988
Dob violation - dismissed
ECB violations · 56
- Class - 1
Electrical closet not dedicated to electrical distribution equipment only. observed on the 6th fl that the electrical closet is not dedicated the installation of internet/ camera equipment in the same closet as
May 19, 2026 · Penalty $1,200
Active - Class - 1
Electrical work without a permit. observed in the basement laundry rm the new installation of emt pipes and 30 amp receptacles, breakers in panel for new electric dryers. 27-3018(b) checked bis / dob now no per
May 19, 2026 · Penalty $2,500
Active - Class - 2
Laars boiler#3 has a outside combustion air inlet louver with a striped backdraft damper locking screw+ao smith hwh has incorrect safety discharge pipe;correct violation+submit certificate of correction
May 19, 2026 · Penalty $1,250
Active - Class - 2
Laars boiler#1 has threaded end on safety discharge pipe+broken tri gauge on hw storage tank#2+bypass around backflow preventer;correct violation+submit certificate of correction
May 19, 2026 · Penalty $1,250
Active - Class - 1
Class 1 - cease use violation: failure to maintain elevator device in a safe condition. door zone restrictor found defective/inoperative, failing to restrict hoistway door opening outside the door zone. in addi
Apr 22, 2026 · Penalty $6,250
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. no certificate of correction on file for vio#39148741l as of 3/24/26., file a certificate of
Mar 24, 2026 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. no certificate of correction on file for vio#391148744r as of 3/24/26., file a certificate o
Mar 24, 2026 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. no certificate of correction on file for vio#39148743p as of 3/24/2026., file a certificate
Mar 24, 2026 · Penalty $1,250
Resolve - Class - 2
Failure to maintain building in code-compliant manner. observed unpermitted flex hose on exhausted of commercial dryer smooth interior. (mechanical code 504.8.1), repair and/or replace
May 21, 2025 · Penalty $625
Active - Class - 1
Failure to provide unobstructed exit passageway. observed excessive storage in passageway. about 4 tiers high of ptech units, tv monitors and boxes obstructing passageway. potential hazard., remove obstruction
May 21, 2025 · Penalty $1,250
Resolve
Show 40 more ↓
- Class - 1
Unsafe storage of combustible material and equipment. observed excessive storage underneath the stairs at cellar level. (prohibited ebike, boxes, bags, clothing ) potential fire hazard., maintain storage in com
May 21, 2025 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building in code-compliant manner: no fire stopping per bc 712.3 (2014 code); 27-345; bc 711.2.4 (2022 code. observed hole penetrations and plastic access panels. throughout the building. po
May 21, 2025 · Penalty $2,500
Resolve - Class - 2
Exit door not self-closing. observed non self closing doors at exits and mechanical/utility rooms throughout building. potential hazard., repair/replace door
May 21, 2025 · Penalty $625
Active - Class - 1
Filed a certificate, form, application etc., containing a material false statement(s). on 3/18/25 a certificate of correction was submitted for violation 39098045p upon annual inspection violation conditions si
May 21, 2025 · Penalty $10,000
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons #39098040x issued on 10/25/2023, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable cert
Feb 11, 2025 · Penalty $625
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons #39098041h issued on 10/25/2023, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable cert
Feb 11, 2025 · Penalty $625
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons #39098044n issued on 10/25/2023, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable cert
Feb 11, 2025 · Penalty $625
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons #39078655y issued on 01/30/2023, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable cert
Jan 29, 2025 · Penalty $1,250
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons #39078656x issued on 01/30/2023, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable cert
Jan 29, 2025 · Penalty $1,250
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons #39097465r issued on 10/19/2023, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable cert
Jan 29, 2025 · Penalty $1,250
Active - Class - 2
Elevator out of service. remedy: restore to service.
Jul 22, 2024 · Penalty $625
Resolve - Class - 2
Unregistered boiler laars pncv0500nack2bxn ser# c-08-208037 btus 499,980, maintain boiler; register boiler
Jul 18, 2024 · Penalty $625
Resolve - Class - 2
Unregistered boiler laars pncvo5oonack2bxn ser# c-08-206331 btus 500,000, maintain boiler; register boiler
Jul 18, 2024 · Penalty $625
Resolve - Class - 2
Unregistered boiler laar model pnch0500nach2cjn ser #c-09-210854 500,000 btus, maintain boiler; register boiler
Jul 18, 2024 · Penalty $625
Resolve - Class - 2
Restore to service so a full inspection can be made by this department.
Jul 16, 2024 · Penalty $625
Resolve - Class - 2
Hole penetrations, throughout building., repair and/or replace
Oct 25, 2023 · Penalty $625
Resolve - Class - 2
Emergency exit door and hardware is defective, ground level exposure #2., provide legal hardware
Oct 25, 2023 · Penalty $625
Resolve - Class - 2
Illegal plastic excess panels throughout building., provide/maintain fire stopping
Oct 25, 2023 · Penalty $1,250
Resolve - Class - 2
Emergency lighting does not work throughout building., repair and/or replace lighting
Oct 25, 2023 · Penalty $1,250
Resolve - Class - 2
Self-closing door broken off hinge to the electrical room, roof level, repair/replace door
Oct 25, 2023 · Penalty $625
Resolve - Class - 2
Water penetrations/leaks throughout building., repair and/or replace
Oct 25, 2023 · Penalty $625
Resolve - Class - 2
Excessive foam installed throughout building., repair and/or replace
Oct 25, 2023 · Penalty $625
Resolve - Class - 2
Back flow preventer for domestic hot water boiler leaking., maintain boiler; correct violating condition and submit a certificate of correction.
Oct 19, 2023 · Penalty $625
Active - Class - 2
Observed in the boiler room located on the roof level active lwak on the bottom of the gas fired water heater. 102.3 maintenance. installations, both existing and new, and parts thereof shall be maintained in p
Oct 19, 2023 · Penalty $625
Resolve - Class - 2
Failure to maintain building & parts thereof in a code compliant manner: atoi, evidence of water leaks with water stained & missing acoustic ceiling panels observed at several locations in the cellar.,, repair
Jun 20, 2023 · Penalty $625
Resolve - Class - 2
Found laars boiler model# pnch500 on roof. unregistered boiler, maintain boiler; register boiler
Jan 30, 2023 · Penalty $1,562
Resolve - Class - 2
Found laars boiler model# pnch5oo on roof. boiler unregistered, maintain boiler; register boiler
Jan 30, 2023 · Penalty $1,562
Resolve - Class - 2
Found larrs boiler on roof.boiler un registered, maintain boiler; register boiler
Jan 30, 2023 · Penalty $1,562
Resolve - Class - 2
Misaligned cab mirror. replace worn gibs where needed. secure gibs where needed. defective car phone. unreadable controller fuses.
Jan 30, 2023 · Penalty $625
Resolve - Class - 2
Observed: at first floor, main entrance, exterior exit door and stair a&b exit doors, illegal hardware is being used blocking easy escape in case of emergency. also, exit door stair b, emergency exit door does
Jan 30, 2023 · Penalty $312
Resolve - Class - 2
Observed: - at first floor, main entrance, exterior exit door and stair a&b exit doors, illegal hardware is being used blocking easy escape in case of emergency. also, exit door stair b, emergency exit door doe
Jan 30, 2023
Resolve - Class - 2
Observed: at roof level, boiler rm, stair a&b, (from 8fl to cellar), at cellar level, electrical, gas, sprinkler rooms, pipes and cables penetration without fire stopping provided., provide/maintain fire stoppi
Jan 30, 2023 · Penalty $1,250
Resolve - Class - 2
Observed on the roof level gas piping to hvac is starting to rust and corrode, the gas in not protected from the elements. as per 404.11 of the fgc protection against corrosion. metallic pipe, fittings, and joi
Jan 30, 2023 · Penalty $625
Resolve - Class - 2
Misaligned cab mirror. replace worn gibs where needed. secure gibs where needed. defective car phone. unreadable controller fuses.
Jan 30, 2023 · Penalty $625
Resolve - Class - 1
Class one item: missing dlm as now required by code. class 2 items: misaligned cab mirror. inoperative car phone. replace worn gibs where needed. shorten gov rope. provide keys to machine room in order to perfo
Mar 23, 2021 · Penalty $3,125
Resolve - Class - 1
Cease use item: inoperative zone lock restrictor. class 1 item: missing dlm as now required by code. class 2 items: misaligned cab mirror. shorten gov rope. inoperative cab light. inoperative phone. inoperative
Mar 23, 2021 · Penalty $3,125
Resolve - Hazardous
Failure to safeguard public and property affected by construction operations. noted: at tiem of inspection to rescind stop all work order 03038cex01lp. construction fence is not complete along exposure 2 (2628
Mar 26, 2008
Resolve - Hazardous
Failure to provide contractor's sign. noted: at time of inspection forswo #030308cex01lp and no contrator sign at kenilworth st (place) fro ntage remedy: provide contractor's sign.
Mar 26, 2008
Resolve - Non-hazardous
Failure to adequately support adjoining ground or structures affected by excavation. noted: under app #302384159 issued on 12-27-08 on exposure #4 @ rear yard of adjoining property an apprx 10' sheer cut w/
Mar 3, 2008 · Penalty $1,000
Resolve - Hazardous
Work contrary to approved plans. noted: under app# 302384159 issued on12-27-07 after undermining adj property retaining wall the shoring wasnot per approved plan lacking means & methods to install shoring. also
Mar 3, 2008 · Penalty $500
Resolve
Complaints
- Plumbing
Water supply
Jun 26, 2026 · Apt 812
Close - Plumbing
Bathtub/shower
Jun 5, 2026 · Apt 409
Close - Plumbing
Basin/sink
Jun 5, 2026 · Apt 409
Close - Heat/hot water
Entire building
May 19, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 26, 2026 · Apt 409
Close - Heat/hot water
Entire building
Mar 25, 2026 · Apt 812
Close - Heat/hot water
Entire building
Mar 24, 2026 · Apt 409
Close - Electric
Lighting
Mar 19, 2026 · Apt 409
Close - Heat/hot water
Apartment only
Mar 19, 2026 · Apt 409
Close - Heat/hot water
Apartment only
Mar 17, 2026 · Apt 409
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Mar 13, 2026 · Apt 409
Close - Electric
Wiring
Mar 13, 2026 · Apt BASEME
Close - Plumbing
Toilet
Oct 21, 2025 · Apt 409
Close - Plumbing
Basin/sink
Apr 20, 2025 · Apt 321B
Close - Heat/hot water
Entire building
Mar 15, 2025 · Apt BLDG
Close - Plumbing
Toilet
Mar 2, 2025 · Apt 321
Close - Plumbing
Toilet
Mar 2, 2025 · Apt 321
Close - Electric
Lighting
Mar 2, 2025 · Apt 321
Close - Heat/hot water
Entire building
Feb 21, 2025 · Apt 315A
Close - Electric
No lighting
Feb 5, 2025 · Apt 321
Close - Heat/hot water
Entire building
Feb 4, 2025 · Apt BLDG
Close - Electric
No lighting
Feb 2, 2025 · Apt 3RDFL
Close - Heat/hot water
Entire building
Jan 30, 2025 · Apt BLDG
Close - Electric
Power outage
Jan 30, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2025 · Apt BLDG
Close - Electric
Power outage
Jan 29, 2025 · Apt BLDG
Close - Electric
Power outage
Jan 28, 2025 · Apt 321B
Close - Electric
Power outage
Jan 28, 2025 · Apt 321B
Close - Heat/hot water
Entire building
Jan 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2025 · Apt BLDG
Close - Electric
Power outage
Jan 28, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 27, 2025 · Apt 321
Close - Heat/hot water
Entire building
Jan 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 30, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 24, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 20, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 18, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 18, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 17, 2024 · Apt 623A
Close - Heat/hot water
Entire building
Jul 17, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 17, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 17, 2024 · Apt 512
Close - Heat/hot water
Entire building
Jul 17, 2024 · Apt 623A
Close - Heat/hot water
Entire building
Jul 16, 2024 · Apt 211
Close - Heat/hot water
Entire building
Jul 16, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 16, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 15, 2024 · Apt 321
Close - Heat/hot water
Apartment only
Jul 15, 2024 · Apt 321
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H8)
- Year built
- 2007
- Floors
- 8
- Residential units
- —
- Building area
- 58,027 ft²
- Lot area
- 10,165 ft²
- Zoning
- R5B
- Community board
- 314
- Council district
- 45
- Block / lot
- 5249 / 35
- Assessed value
- $5,658,750
- Landmark / historic district
- No
HPD registration #386291, last renewed Dec 22, 2025.
Questions about 2604 Farragut Road
Who owns 2604 Farragut Road?
The owner of record in NYC Department of City Planning PLUTO data is New Brooklyn Development LLC.
Does 2604 Farragut Road have violations?
Yes. NYC HPD has recorded 40 housing violations at this property.
Is 2604 Farragut Road rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2604 Farragut Road built?
City records list 2007 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.