roofy

546 East 29 Street

Brooklyn, NY 11210BBL 3-05230-0048Map

Owner of record: Wyatt, Pedro

546 East 29 Street is a two-family home built in 1920 in Brooklyn, 11210. It has 2 residential units across 2 floors. The owner of record is Wyatt, Pedro. HPD has recorded 26 housing violations here, most recently on September 21, 2023. 25 of the 26 most recent violations are still open.

HPD violations
26
DOB violations
0
ECB violations
0
HPD complaints
14

What to know

Concern
9 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Sep 21, 2023

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 26

  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Sep 21, 2023

    Closed — Violation closed
  • B

    Properly repair and abate unsafe electric wiring condition consisting of at ceiling in the bathroom located at apt floor1, 1st story, 1st apartment from west at north

    Aug 13, 2023 · Apt FLOOR1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 2nd door frame from north at east wall in the 6th room from east at north located at apt floor1, 1st story, 1st apartment from west at north

    Aug 13, 2023 · Apt FLOOR1

    Open — Nov sent out
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt floor1, 1st story, 1st apartment from west at north

    Aug 13, 2023 · Apt FLOOR1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 1st room from east located at apt floor1, 1st story, 1st apartment from west at north

    Aug 13, 2023 · Apt FLOOR1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 3rd room from east located at apt floor1, 1st story, 1st apartment from west at north

    Aug 13, 2023 · Apt FLOOR1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame, 1st door frame from south at west wall, west wall in the 3rd room from east located at apt floor1, 1st story, 1st apartment from west at north

    Aug 13, 2023 · Apt FLOOR1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st door frame from south at west wall in the bathroom located at apt floor1, 1st story, 1st apartment from west at north

    Aug 13, 2023 · Apt FLOOR1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 2nd room from east, the private hallway located at apt floor1, 1st story, 1st apartment from west at north

    Aug 13, 2023 · Apt FLOOR1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department .. 1st closet from east at south wall door in the 3rd room from east located at apt floor1, 1st story, 1st apartment from west at north

    Aug 13, 2023 · Apt FLOOR1

    Open — Nov sent out
Show 16 more ↓
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt floor1, 1st story, 1st apartment from west at north

    Aug 13, 2023 · Apt FLOOR1

    Open — Nov sent out
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt floor1, 1st story, 1st apartment from west at north

    Aug 13, 2023 · Apt FLOOR1

    Open — Nov sent out
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt floor1, 1st story, 1st apartment from west at north

    Aug 13, 2023 · Apt FLOOR1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 6th room from east at north located at apt floor1, 1st story, 1st apartment from west at north

    Aug 13, 2023 · Apt FLOOR1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood sub- flooor in the bathroom located at apt floor1, 1st story, 1st apartment from west at north

    Aug 13, 2023 · Apt FLOOR1

    Open — Nov sent out
  • C

    Remove the illegal fastening double cylinder lock installed at building entrance door at public hall, 1st story

    Aug 13, 2023

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 6th room from east at south located at apt floor1, 1st story, 1st apartment from west at north

    Aug 13, 2023 · Apt FLOOR1

    Open — Nov sent out
  • A

    Properly repair the broken or defective electric wall outlet south rear west room 2nd sty. apt. #2.

    Sep 1, 2005

    Open — Nov sent out
  • A

    Repair the broken or defective connection handle water closet tank batheroom 2nd sty. apt.

    Sep 1, 2005

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department ceiling south east room 2nd sty. apt. # 2.

    Sep 1, 2005

    Open — Nov sent out
  • A

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet bathroom 2nd sty. apt. #2.

    Sep 1, 2005

    Open — Nov sent out
  • B

    Replace with new the missing electric light fixture ceiling front south room 2nd sty. apt.2.

    Sep 1, 2005

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in bathtub bathroom 2nd sty. apt. 2.

    Apr 23, 2004

    Open — Nov sent out
  • B

    Provide adequate lighting for public hall 2nd sty.

    Apr 23, 2004

    Open — Nov sent out
  • A

    Properly repair the broken or defective window make operable top sash front south room 2nd sty. apt. 2.

    Apr 23, 2004

    Open — Nov sent out
  • A

    Repair the leaky and/or defective faucets bathtub bathroom 2nd sty. apt. 2.

    Apr 23, 2004

    Open — Nov sent out

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Plumbing

    Bathtub/shower

    Aug 10, 2023 · Apt 1STFLO

    Close
  • Safety

    Smoke detector

    Aug 10, 2023 · Apt 1STFLO

    Close
  • Electric

    Lighting

    Aug 10, 2023 · Apt 1STFLO

    Close
  • Unsanitary condition

    Pests

    Aug 10, 2023 · Apt 1STFLO

    Close
  • Safety

    Smoke detector

    Jun 1, 2023 · Apt FLOOR1

    Close
  • Paint/plaster

    Ceiling

    Jun 8, 2009 · Apt 1FL

    Close
  • Paint/plaster

    Wall

    Jun 8, 2009 · Apt 1FL

    Close
  • Plumbing

    Water-leaks

    Jun 8, 2009 · Apt 1FL

    Close
  • Plumbing

    Water-leaks

    Jun 8, 2009 · Apt 1FL

    Close
  • General

    Ceramic-tile

    Jun 8, 2009 · Apt 1FL

    Close
Show 4 more ↓
  • Nonconst

    Vermin

    Jun 8, 2009 · Apt 1FL

    Close
  • General

    Cooking gas

    Jul 23, 2004 · Apt 1FL

    Close
  • General

    Cooking gas

    Jul 21, 2004 · Apt 1FL

    Close
  • General

    Cooking gas

    Jul 20, 2004 · Apt 1FL

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Two-family home (B2)
Year built
1920
Floors
2
Residential units
2
Building area
2,232 ft²
Lot area
2,500 ft²
Zoning
R5B
Community board
314
Council district
45
Block / lot
5230 / 48
Assessed value
$47,640
Landmark / historic district
No

Questions about 546 East 29 Street

Who owns 546 East 29 Street?

The owner of record in NYC Department of City Planning PLUTO data is Wyatt, Pedro.

Does 546 East 29 Street have violations?

Yes. NYC HPD has recorded 26 housing violations at this property.

Is 546 East 29 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 546 East 29 Street built?

City records list 1920 as the year it was built.

How many apartments are in 546 East 29 Street?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.