1210 Flatbush Avenue
Brooklyn, NY 11226BBL 3-05186-0030Map
Owner of record: East Flatbush Realty, LLC
1210 Flatbush Avenue is a mixed residential and retail building built in 1933 in Brooklyn, 11226. It has 2 residential units across 3 floors. The owner of record is East Flatbush Realty, LLC. HPD has recorded 56 housing violations here, most recently on August 6, 2026. 42 of the 50 most recent violations are still open.
- HPD violations
- 56
- DOB violations
- 17
- ECB violations
- 2
- HPD complaints
- 98
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 56
- ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 6, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings ,misding sign,
Aug 6, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings ,missing sign,
Aug 6, 2026
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the visible mold at grouts joints of the ceramic tiles at south, east and north walls around shower stall, in the bathroom located at apt 1, 2nd story, 1st apartment from south at west
Aug 6, 2026 · Apt 1
Open — Civ14 mailed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet obseved at west and north walls, in the private hallway located at apt 1, 2nd story, 1st apartment from south at west
Aug 6, 2026 · Apt 1
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the nuisance consisting of hot water exceeded allowed temperature of the 130.f degrees at hotwater fixtures, in the entire apartment located at apt 1, 2nd story, 1st apartment from south at west
Aug 6, 2026 · Apt 1
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 6, 2026
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Jul 21, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Jul 21, 2026 · Apt 1
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of scalding hot water above 130 degrees at all hot water fixtures in the entire apartment located at apt 1, 2nd story, 1st apartment from south at west
Apr 10, 2026 · Apt 1
Open — Invalid certification
Show 40 more ↓
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at west wall and ceiling in the bathroom located at apt 1, 2nd story, 1st apartment from south at west
Apr 10, 2026 · Apt 1
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 1, 2nd story, 1st apartment from south at west
Apr 10, 2026 · Apt 1
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at west wall and ceiling in the bathroom located at apt 1, 2nd story, 1st apartment from south at west original violation 18779969 issued 10-apr-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Apr 10, 2026 · Apt 1
Open — Notice of issuance sent to tenant - ANon-hazardous
Refit glass sliding shower door in the bathroom located at apt 1, 2nd story, 1st apartment from south at west
Sep 16, 2025 · Apt 1
Open — Invalid certification - ANon-hazardous
Cleanse to the satisfaction of this department the walls and floors at public hall, 1st story
Sep 16, 2025
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the treads and walls at public hall stairs, 1st story
Sep 16, 2025
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the walls and floors at public hall, 2nd story
Sep 16, 2025
Closed — Violation dismissed - ANon-hazardous
Provide and maintain approved mail receptacles and directories for the persons residing in the dwelling as provided in the u.s. postal regulations.
Sep 16, 2025
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective heavy duty mortise lock and assembly at building entrance door
Sep 16, 2025
Open — Invalid certification - ANon-hazardous
Post and maintain a street number on the front of the dwelling plainly visible from the sidewalk.
Sep 16, 2025
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of hook and eye hold open device at vestibule door at public hall, 1st story
Sep 16, 2025
Open — Invalid certification - BHazardous
Properly repair or replace the broken or defective door knob at vestibule door at public hall, 1st story
Sep 16, 2025
Open — Invalid certification - ANon-hazardous
Properly repair or replace the broken or defective bell buzzer/intercom system from building entrance to the north wall in the private hallway located at apt 1, 2nd story, 1st apartment from south at west
Sep 16, 2025 · Apt 1
Open — Invalid certification - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2, 2nd story
Jan 20, 2010 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin bedbugs in the entire apartment located at apt 3, 3rd story, 1st apartment from south at west
Jan 17, 2010 · Apt 3
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... walls appx. 20 sq. feet. in the bathroom located at apt 2, 2nd story
Dec 3, 2009 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel glaze wash basin in the bathroom located at apt 2, 2nd story
Dec 3, 2009 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceilings in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Nov 11, 2009 · Apt 2
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Nov 11, 2009 · Apt 2
Open — Nov sent out - ANon-hazardous
Refit door in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from south at west
Nov 11, 2009 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Nov 11, 2009 · Apt 2
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in at sink in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Nov 11, 2009 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and walls in the entire apartment located at apt 2, 2nd story
May 20, 2009 · Apt 2
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in washbasin in the bathroom located at apt 2, 2nd story
May 20, 2009 · Apt 2
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2, 2nd story, apartment at west
Aug 1, 2007 · Apt 2
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3fl, 3rd story, apartment at west
Aug 1, 2007 · Apt 3FL
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from east at north located at apt 3fl, 3rd story, apartment at west
Aug 1, 2007 · Apt 3FL
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 3fl, 3rd story, apartment at west
Aug 1, 2007 · Apt 3FL
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electrical wires at ceiling in the 2nd room from east located at apt 3fl, 3rd story, apartment at west
Aug 1, 2007 · Apt 3FL
Open — Nov sent out - ANon-hazardous
Replace with new the missing - 60 watt bulbs electric fixtures 1st and 2nd sty. public halls.
Aug 13, 2005
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures - kitchen 2nd sty. apt.
Aug 13, 2005
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of house hold items chair, flower pots, bags etc. at public hall, 3rd story
Aug 4, 2005
Open — Nov sent out - BHazardous
Abate the nuisance consisting of loose scuttle ladder at public hall, 3rd story
Aug 4, 2005
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 3fl, 3rd story
Aug 4, 2005 · Apt 3FL
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 3fl, 3rd story
Aug 4, 2005 · Apt 3FL
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak .. in the 1st room from east located at apt 3fl, 3rd story
Aug 4, 2005 · Apt 3FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color all wall in the bathroom located at apt 3fl, 3rd story
Aug 4, 2005 · Apt 3FL
Open — Nov sent out - ANon-hazardous
Repair the leaky and/or defective faucets kitchen sink, wash basin & bathtub bathroom 2nd sty. apt.
Jul 6, 2004
Open — Nov sent out - ANon-hazardous
Repair the leaky and/or defective water supply pipe - bathroom at wash basin 2nd sty. apt.
Jul 6, 2004
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of - household articles etc. 3rd sty. public hall to roof.
Jul 6, 2004
Open — Nov sent out
DOB building violations · 17
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active
Show 7 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed
ECB violations · 2
- Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 30000105247n0001 in accordance with the rules of the department. 1rcny 103-01(d)(1) requires that an annual inspection report fo
Jul 1, 2025 · Penalty $3,125
Active - Hazardous
Work w/o permit. work noted: 3/4 gas piping was being ran from 3rd fl apt to cellar gas meter. remedy- obtain permit if feasible or restore to prior legal condition.
Jul 30, 2007 · Penalty $1,000
Active
Complaints
- Plumbing
Water supply
Aug 3, 2026 · Apt 1
Close - Plumbing
Water supply
Aug 3, 2026 · Apt 1
Close - Unsanitary condition
Mold
Aug 3, 2026 · Apt 1
Close - Heat/hot water
Apartment only
Jul 23, 2026 · Apt 1STFLO
Open - Appliance
Electric/gas range
Jul 23, 2026 · Apt 1STFLO
Open - Heat/hot water
Entire building
Jul 22, 2026 · Apt 1
Close - Appliance
Electric/gas range
Jul 22, 2026 · Apt 1
Close - General
Cooking gas
Jul 20, 2026 · Apt 1
Close - Appliance
Electric/gas range
Jul 20, 2026 · Apt 1
Close - Appliance
Electric/gas range
Jul 20, 2026 · Apt 1
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Jul 20, 2026 · Apt 1
Close - Heat/hot water
Entire building
Jul 20, 2026 · Apt 1
Close - Appliance
Electric/gas range
Jul 20, 2026 · Apt 1
Close - Heat/hot water
Apartment only
Jul 20, 2026 · Apt 1
Close - Heat/hot water
Apartment only
Jul 20, 2026 · Apt 1
Close - Heat/hot water
Apartment only
Jul 20, 2026 · Apt 1
Close - General
Cooking gas
Jul 19, 2026 · Apt 1
Close - Appliance
Electric/gas range
Jul 18, 2026 · Apt 1
Close - Heat/hot water
Apartment only
Jul 18, 2026 · Apt 1
Close - General
Ventilation system
May 17, 2026 · Apt 1
Close - Heat/hot water
Apartment only
Apr 9, 2026 · Apt 1
Close - Heat/hot water
Apartment only
Apr 8, 2026 · Apt 1
Close - Heat/hot water
Entire building
Jan 5, 2026 · Apt 1
Close - Heat/hot water
Apartment only
Jan 2, 2026 · Apt 1
Close - Heat/hot water
Apartment only
Dec 29, 2025 · Apt 1
Close - Door/window
Door
Dec 5, 2025 · Apt 1
Close - Heat/hot water
Entire building
Oct 31, 2025 · Apt 1
Close - Plumbing
Bathtub/shower
Sep 2, 2025 · Apt 1
Close - Heating
Heat related
May 12, 2010 · Apt 2
Close - Heating
Heat related
Feb 23, 2010 · Apt 3
Close - Heating
Heat related
Jan 26, 2010 · Apt 2
Close - Heating
Heat related
Jan 16, 2010 · Apt 2
Close - Nonconst
Vermin
Dec 8, 2009 · Apt 3
Close - Paint/plaster
Wall
Nov 25, 2009 · Apt 2
Close - Paint/plaster
Wall
Nov 25, 2009 · Apt 2
Close - General
Mold
Nov 25, 2009 · Apt 2
Close - Plumbing
Basin/sink
Nov 25, 2009 · Apt 2
Close - Heating
Heat related
Nov 23, 2009 · Apt 2
Close - General
Doors
Nov 5, 2009 · Apt 2
Close - General
Mold
Nov 5, 2009 · Apt 2
Close - Plumbing
Basin/sink
Nov 5, 2009 · Apt 2
Close - Paint/plaster
Wall
Nov 5, 2009 · Apt 2
Close - Paint/plaster
Window/frame
Nov 5, 2009 · Apt 2
Close - Paint/plaster
Wall
Nov 5, 2009 · Apt 2
Close - Paint/plaster
Wall
Nov 5, 2009 · Apt 2
Close - General
Cabinet
Nov 5, 2009 · Apt 2
Close - Heating
Heat related
Nov 5, 2009 · Apt 2
Close - Paint/plaster
Ceiling
Nov 5, 2009 · Apt 2
Close - Electric
Wiring
Nov 5, 2009 · Apt 2
Close - Heating
Heat related
Nov 4, 2009 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1933
- Floors
- 3
- Residential units
- 2
- Building area
- 2,925 ft²
- Lot area
- 1,360 ft²
- Zoning
- R7A
- Community board
- 314
- Council district
- 40
- Block / lot
- 5186 / 30
- Assessed value
- $76,920
- Landmark / historic district
- No
HPD registration #826345, last renewed Nov 12, 2025.
Questions about 1210 Flatbush Avenue
Who owns 1210 Flatbush Avenue?
The owner of record in NYC Department of City Planning PLUTO data is East Flatbush Realty, LLC.
Does 1210 Flatbush Avenue have violations?
Yes. NYC HPD has recorded 56 housing violations at this property.
Is 1210 Flatbush Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1210 Flatbush Avenue built?
City records list 1933 as the year it was built.
How many apartments are in 1210 Flatbush Avenue?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.