1502 Cortelyou Road
Brooklyn, NY 11226BBL 3-05158-0001Map
Owner of record: Jhangir, Asif
1502 Cortelyou Road is a mixed residential and retail building built in 1930 in Brooklyn, 11226. It has 4 residential units across 3 floors. The owner of record is Jhangir, Asif. HPD has recorded 169 housing violations here, most recently on May 4, 2026. 39 of the 50 most recent violations are still open.
- HPD violations
- 169
- DOB violations
- 47
- ECB violations
- 1
- HPD complaints
- 125
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 169
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 20, 2025
Open — Info nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north at west, the 1st room from north at west, the 4th room from north, the bathroom , the kitchen , the foyer located at apt 2fl, 2nd story, 1st apartment from west at north
Oct 7, 2025 · Apt 2FL
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustic tiles dropped ceiling in the entire apartment located at apt 2fl, 2nd story, 1st apartment from west at north
Oct 7, 2025 · Apt 2FL
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2fl, 2nd story, 1st apartment from west at north
Oct 7, 2025 · Apt 2FL
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2fl, 2nd story, 1st apartment from west at north
Oct 7, 2025 · Apt 2FL
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2fl, 2nd story, 1st apartment from west at north
Oct 7, 2025 · Apt 2FL
Open — Notice of issuance sent to tenant - BHazardous
M/d law abate the nuisance consisting of air conditioner install at the fire escape window in the 2nd room from north at west located at apt 2fl, 2nd story, 1st apartment from west at north
Oct 7, 2025 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 2fl, 2nd story, 1st apartment from west at north
Oct 7, 2025 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 2fl, 2nd story, 1st apartment from west at north
Oct 7, 2025 · Apt 2FL
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 29, 2024
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2024
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2023
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 22, 2023
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Nov 15, 2022
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Nov 15, 2022
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Nov 15, 2022
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Nov 15, 2022
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Nov 15, 2022
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Nov 15, 2022
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at building entrance , 1st story
Mar 31, 2022
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Mar 31, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 31, 2022
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Mar 31, 2022
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Mar 31, 2022
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in wasteline at wash basin in the bathroom located at apt 2, 2nd story, 1st apartment from west at north
Mar 31, 2022 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Mar 9, 2022 · Apt 2
Open — Nov certified late - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and south wall at public hall, 2nd story
Mar 9, 2022
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and south wall at public hall, 2nd story
Mar 9, 2022
Open — Nov certified late - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling at public hall, 2nd story
Mar 9, 2022
Open — Nov certified late - BHazardous
Remove all obstructions and repair all defects in wasteline at sink in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Mar 9, 2022 · Apt 2
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective marble saddle in the bathroom located at apt 2, 2nd story, 1st apartment from west at north
Mar 9, 2022 · Apt 2
Open — Nov certified late - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acustic ceiling tiles installed in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Mar 9, 2022 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Mar 3, 2022 · Apt 2
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at building entrace to the building , 1st story
Mar 3, 2022
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 2, 2nd story, 1st apartment from west at north
Mar 3, 2022 · Apt 2
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustic tiles at suspending ceiling in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Mar 3, 2022 · Apt 2
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Mar 3, 2022 · Apt 2
Open — Nov certified late - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Mar 3, 2022 · Apt 2
Open — Nov certified late - BHazardous
Provide adequate supply of cold water for the fixtures at sink in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Mar 3, 2022 · Apt 2
Open — Nov certified late - BHazardous
Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Mar 3, 2022 · Apt 2
Open — Nov certified late - BHazardous
Provide adequate supply of cold water for the fixtures at wash basin and bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from west at north
Mar 3, 2022 · Apt 2
Open — Nov certified late - BHazardous
Provide adequate supply of hot water for the fixtures at wash basin and bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from west at north
Mar 3, 2022 · Apt 2
Open — Nov certified late - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 23, 2022
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 19, 2022
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jan 19, 2022
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jan 19, 2022
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing at public hall, 1st story
Jan 19, 2022
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 19, 2022
Open — Nov sent out
DOB building violations · 47
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active
Show 37 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Plumbing none
The department of buildings has issued a notice to revoke application #320126991 due to the revocation of the master plumbers license.all wo rk in connection with plumbing work on this application has been order ed stopped immediately
Dec 30, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Construction other optional
Work without a permit: remedy: stop all work immediately, contact this office 718 802-3685 p rior to return to work
Apr 14, 2009
Vw-violation work without permit - active - Construction other optional
Work without a permit: remedy: stop all work immediately contact this office at 718 802-3685 prior to return to work
Apr 14, 2009
Vw-violation work without permit - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active
ECB violations · 1
- Non-hazardous
Failure to maintian bldg.lower rear roof over 1st flr has 4" of standing water & excessive debris.water seeping into 1st flr commerical space.water damaged ceiling in living rm of apt.#2 at 2nd flr. rear.remedy
Apr 6, 2007 · Penalty $800
Active
Complaints
- Heat/hot water
Entire building
Nov 1, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 3, 2025 · Apt 2FL
Close - Water leak
Heavy flow
Oct 3, 2025 · Apt 2FL
Close - Water leak
Heavy flow
Aug 24, 2025 · Apt 2NDFLO
Close - Appliance
Electric/gas range
Aug 24, 2025 · Apt 2NDFLO
Close - Appliance
Refrigerator
Aug 24, 2025 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Nov 29, 2024 · Apt 3F
Close - Heat/hot water
Apartment only
Nov 26, 2024 · Apt 3F
Close - Heat/hot water
Apartment only
Feb 4, 2023 · Apt 3F
Close - Door/window
Door
Nov 16, 2022 · Apt PH
Close
Show 40 more ↓
- Door/window
Door
Nov 14, 2022 · Apt PH
Close - Unsanitary condition
Pests
Nov 14, 2022 · Apt 3R
Close - Unsanitary condition
Pests
Nov 14, 2022 · Apt 3R
Close - Unsanitary condition
Pests
Nov 14, 2022 · Apt 3F
Close - Door/window
Door
Nov 14, 2022 · Apt 3F
Close - Heat/hot water
Apartment only
Nov 14, 2022 · Apt 3F
Close - Plumbing
Radiator
Mar 28, 2022 · Apt 2
Close - Plumbing
Water supply
Mar 21, 2022 · Apt 2
Close - Plumbing
Water supply
Mar 4, 2022 · Apt 2
Close - Plumbing
Water supply
Mar 1, 2022 · Apt 2
Close - Plumbing
Radiator
Feb 15, 2022 · Apt 2NDFLO
Close - Heat/hot water
Entire building
Jan 23, 2022 · Apt 3F
Close - Heat/hot water
Entire building
Jan 22, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2022 · Apt 3F
Close - Heat/hot water
Entire building
Jan 21, 2022 · Apt 3F
Close - Heat/hot water
Entire building
Jan 20, 2022 · Apt 3F
Close - Heat/hot water
Entire building
Jan 18, 2022 · Apt 2
Close - Plumbing
Water supply
Jan 17, 2022 · Apt 2FLR
Close - Plumbing
Basin/sink
Jan 17, 2022 · Apt 2FLR
Close - Door/window
Door
Jan 17, 2022 · Apt 2FLR
Close - Unsanitary condition
Mold
Jan 17, 2022 · Apt 2FLR
Close - Water leak
Damp spot
Jan 17, 2022 · Apt 2FLR
Close - Appliance
Refrigerator
Jan 17, 2022 · Apt 2FLR
Close - Heat/hot water
Apartment only
Jan 17, 2022 · Apt 2FLR
Close - Heat/hot water
Apartment only
Dec 21, 2021 · Apt 2
Close - Heat/hot water
Entire building
Dec 3, 2021 · Apt 3R
Close - Heat/hot water
Entire building
Dec 3, 2021 · Apt 3F
Close - Heat/hot water
Entire building
Dec 2, 2021 · Apt BLDG
Close - Plumbing
Water supply
Dec 2, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 2, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 30, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 30, 2021 · Apt 3F
Close - Heat/hot water
Entire building
Nov 27, 2021 · Apt 3F
Close - Heat/hot water
Entire building
Nov 24, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 23, 2021 · Apt ENTIRE
Close - Heat/hot water
Entire building
Nov 3, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 21, 2019 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 16, 2018 · Apt 3F
Close - Flooring/stairs
Floor
Jul 21, 2017 · Apt 2FL
Close - Water leak
Slow leak
Jul 21, 2017 · Apt 2FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S9)
- Year built
- 1930
- Floors
- 3
- Residential units
- 4
- Building area
- 4,140 ft²
- Lot area
- 2,160 ft²
- Zoning
- R6A
- Community board
- 314
- Council district
- 40
- Block / lot
- 5158 / 1
- Assessed value
- $459,450
- Landmark / historic district
- No
HPD registration #316717, last renewed Aug 18, 2022.
Questions about 1502 Cortelyou Road
Who owns 1502 Cortelyou Road?
The owner of record in NYC Department of City Planning PLUTO data is Jhangir, Asif.
Does 1502 Cortelyou Road have violations?
Yes. NYC HPD has recorded 169 housing violations at this property.
Is 1502 Cortelyou Road rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1502 Cortelyou Road built?
City records list 1930 as the year it was built.
How many apartments are in 1502 Cortelyou Road?
It has 4 residential units and 6 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.