885 Flatbush Avenue
Brooklyn, NY 11226BBL 3-05103-0028Map
Owner of record: 885 Flatbush Associates LLC
885 Flatbush Avenue is an office building built in 1925 in Brooklyn, 11226. The owner of record is 885 Flatbush Associates LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 50
- ECB violations
- 29
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 50
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 3, 2024
Dob violation - dismissed - Construction other optional
Ftm.obsrvd facade in state of disrepair w/cracks.missing mortar,spalld brick throughout@exposures 1-4,w/severe crck&bulging @exposures 3/4 corner.comply with commissioner's order:dob violation#012624feu31401ak (control #393345)immediately
Feb 20, 2024
Dob violation - dismissed - Immediate emergency anythingoptional
Install approximately 180 linear feet of sidewalk shed at exposure 1 and 2
Jan 26, 2024
Dob violation - dismissed - Construction other optional
Ftm.obsrvd facade in state of disrepair w/cracks,missng mortar,spalld brick throughout@exposures 1-4,w/severe crck&bulgng @exposures 3/4 corner.comply with commissioner's order:dob violation#012624feu31401ak (control #393345)immediately
Jan 26, 2024
Dob violation - dismissed - Construction other optional
At time of inspection observed 5 story office building exposure # 2 wall on the side of the interior yard in a state of disrepair and bulging with severe vertical structural cracks, extending approx. 35' from grade level to the 4th floor, creating an unsafe condition.
Jan 25, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 17, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 3, 2018
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 13, 2018
Dob violation - dismissed
Show 40 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 13, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 4, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 4, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 3, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 24, 2015
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 30, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 7, 2012
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 7, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 29, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 9, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 10, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 27, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 25, 2007
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 5, 2006
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 23, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 1, 2003
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Elevator elevatorrequired
3p957
Feb 15, 2000
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Elevator elevatorrequired
3p957
Dec 3, 1998
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 1996
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 17, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 13, 1992
Vp*-violation unserved ecb- dismissed
ECB violations · 29
- Class - 1
At time of inspection observed 5 story office building exposure # 2 wall on the side of the interior yard in a state of disrepair and bulging with severe vertical structural cracks, extending approx. 30' from g
Jan 25, 2024 · Penalty $2,500
Resolve - Class - 1
Miscellaneous violations.gas appliance installed in a prohibited location.observed a unit tester installed on the 1st flr rear & renting through the 3rd flr which isnt allowed.rem:obtain a permit relocate to an
Feb 17, 2018
Resolve - Class - 1
Work w/o a permit.i observed the removal of the gas fired store that was illegally installed & violated under violation #35268525h.also piping was removed that was associated with the stove.no permits on file f
Feb 17, 2018
Resolve - Non-hazardous
Emergency highly inoperable at time of inspection mezzanine at east 3 ( )pack inoperable & twin pack 2 lito at mezzanine west adjacent to restrooms-inoperable at time of inspection total 2 highly packages-
Mar 31, 2007
Resolve - Non-hazardous
Operation of a public assembly w/o a current permit expires 12/06 #3942.remedy:obtain a current p/a permit.
Mar 31, 2007
Resolve - Hazardous
Failure to install an acceptable two-way voice communication system with centralstation connection.remedy:provide either tr-1 form with bldg dept sign-off or 23c and 23d forms with bldg dept sign-off as per ll1
Jan 23, 2004 · Penalty $5,000
Resolve - Hazardous
Failure to install an acceptable two-way voice communication system with central station connection. remedy: provide either tr-1 form with buildings department sign-off or 23c and 23d forms with buildings depar
Apr 28, 2003 · Penalty $1,000
Resolve - Non-hazardous
80h12, 80-h-12-replace car saddle
Apr 2, 2003
Resolve - Non-hazardous
Failure to install an acceptable two - way voice communication system with center station connection remedy: - provide either tr-1 form with building department sign - off or 23c & 23d forms with buildings dept
Nov 20, 2002 · Penalty $1,000
Resolve - Hazardous
Failure to install an acceptable two way voice mail communication remedy provide either tr-1 form with buildings department sign off or 23c and 23d forms with building department sign off as per ll5/73
Aug 29, 2002 · Penalty $400
Resolve
Show 19 more ↓
- Non-hazardous
Failure to install an acceptable two way voice communication system with central station connection remedy provide either tr-1 form with buildings department sign off or 23c & 23d forms with buildings dept sign
May 2, 2002 · Penalty $1,000
Resolve - Non-hazardous
2x11-46h12-39h8-74o2-57o2-58o2-59o2-60o2-15b1-9m7-9#11. 74-o-top of car, 15-b-make all shaft doors seif closing, 9-m-7 rear slow speed door 9-#-front slow speed loose.
Apr 16, 2002 · Penalty $180
Resolve - Hazardous
Failure to install an acceptable two-way voice communication system with central station connection.remedy:provide either tr-1 form with bldg dept.sign-off or 23c&23d forms with bldgs.dept.sign-off as perll5/73
Dec 4, 2001 · Penalty $1,000
Resolve - Hazardous
Failure to isntall an acceptaable two-way voice communication system with central station connection. remedy: provide either tr-1 fdrm with buildings department sign-off as per local law 5/73 or 23c and 23d for
Sep 19, 2001 · Penalty $500
Resolve - Hazardous
Failure to install an acceptable two-way voice communication system with central station connection.remedy:provide either tr-1 form with building department sign-off or 23c & 23 d forms with building department
May 11, 2001 · Penalty $500
Resolve - Hazardous
Failure to install an acceptable two-way voice communication system with central station connection.remedy:provide either tr-1 form with buildings dept.sign-off or 23c & 23d forms with buildings dept.sign-off a
Mar 20, 2000 · Penalty $500
Resolve - Hazardous
Failure to install an acceptable 2-way voice communication system w/ central station connection. remedy: provide either tr-1 form w/ bldgsdept sign-off or 23c & 23d forms w/ bldgs dept sign-off as per ll 5/73
Jan 8, 1999 · Penalty $1,000
Resolve - Hazardous
Failure to install an acceptable two-way voice communication system with central station connection. remedy: provide either tr-1 form with buildings department sign-off or 23c and 23d forms with buildings depar
Sep 14, 1998 · Penalty $400
Resolve - Non-hazardous
31r9,57o2,55m7,57ad6,2l11,37g7,75u5. 31-under car wiring. 55-providepit light. 57a-lock & secure pit door. 2-not working. 37-proper fuses. 75-5 yr test.
May 7, 1998
Resolve - Hazardous
Failure to install an acceptable two-way voice communication system with central station connection. remedy: provide either tr-1 form with buildings department sign-off as per local law 5/73.
Nov 5, 1997
Resolve - Non-hazardous
37l,73m, 73. 5year test and 5yr test tag. file elev 3 form.
Dec 29, 1992 · Penalty $200
Resolve - Non-hazardous
09h,16h,28h,13m,35p.
Dec 4, 1991 · Penalty $1,000
Resolve - Non-hazardous
40,45
Aug 27, 1991 · Penalty $40
Resolve - Non-hazardous
32,45,boiler flooded
Aug 27, 1991 · Penalty $40
Resolve - Non-hazardous
14i, 35#. (35) unable to gain access to motor room to complete inspection.
Jan 24, 1991 · Penalty $1,000
Resolve - Non-hazardous
Emergency lighiting is inoperative or defective . remedy: reapir emergency lighting or replace forthwith.
Jul 20, 1989
Resolve - Non-hazardous
If boiler is not in use disconnnect steam header pipe oil burner breeching electrical controls water feed line and seal hole at stack properly
Aug 29, 1988 · Penalty $150
Resolve - Unknown
Boiler flooded small stack cleanout door doesnt close properly inadequate light in obiler room clean breedching of soot clean out overhaul oil burner bottom blowndown valve corroded
Aug 29, 1988 · Penalty $150
Resolve - Unknown
Boiler flooded small stack cleanout door doesnt close properly inadequate light in boiler room exposed wiring at elctrical junction boxes clean breeching of soot clean and over haul oil burner bottom blowdown b
Aug 29, 1988 · Penalty $150
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O5)
- Year built
- 1925
- Floors
- 5
- Residential units
- —
- Building area
- 37,596 ft²
- Lot area
- 8,690 ft²
- Zoning
- C4-4A
- Community board
- 314
- Council district
- 40
- Block / lot
- 5103 / 28
- Assessed value
- $2,476,350
- Landmark / historic district
- No
Questions about 885 Flatbush Avenue
Who owns 885 Flatbush Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 885 Flatbush Associates LLC.
Does 885 Flatbush Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 885 Flatbush Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 885 Flatbush Avenue built?
City records list 1925 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.