45 Woodruff Avenue
Brooklyn, NY 11226BBL 3-05052-0045Map
Owner of record: 123 On The Park LLC
45 Woodruff Avenue is an elevator apartment building built in 2015 in Brooklyn, 11226. It has 131 residential units across 8 floors. The owner of record is 123 On The Park LLC. HPD has recorded 9 housing violations here, most recently on June 5, 2024. 1 of the 9 most recent violations are still open.
- HPD violations
- 9
- DOB violations
- 6
- ECB violations
- 2
- HPD complaints
- 90
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 9
- BHazardous
M/d law abate the nuisance consisting of potential fire, upper kitchen cabinet located approximetly 18th inches above gas stove. in the kitchen located at apt 1b, 1st story, 2nd apartment from north at east
Jun 5, 2024 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at apartment entrance door. in the entrance located at apt 6n, 6th story, 2nd apartment from east at south
Jun 5, 2024 · Apt 6N
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt 6n, 6th story, 1st apartment from east at south
Apr 7, 2024 · Apt 6N
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 6n, 6th story, 1st apartment from east at south
Apr 7, 2024 · Apt 6N
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at sink, washbasin and bathtub in the entire apartment located at apt 8a, 8th story, 1st apartment from west at north
Jan 30, 2024 · Apt 8A
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures at sink, washbasin, bathtub and water-closet in the entire apartment located at apt 8a, 8th story, 1st apartment from west at north
Jan 30, 2024 · Apt 8A
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at compactor closet , 6th story
Jan 30, 2024
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at kitchen and bathroom in the entire apartment located at apt 6a, 6th story, 1st apartment from west at north
Jan 29, 2024 · Apt 6A
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures at kitchen and bathroom in the entire apartment located at apt 6a, 6th story, 1st apartment from west at north
Jan 29, 2024 · Apt 6A
Closed — Violation closed
DOB building violations · 6
- Construction other optional
At time of inspection observed at apartment 6n leaving room, and two bedrooms have cracks on the ceiling at multiple locations. also crack at cellar level wall.
Apr 11, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 6, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 11, 2014
Dob violation - resolved
ECB violations · 2
- Class - 2
Failure to submit an acceptable required cycle 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #916832. remedy: submit acceptable requ
Apr 8, 2025 · Penalty $2,500
Active - Class - 1
At time of inspection observed apt#6n at bedroom and leaving room sprinkler head cover painted and plastered., repair and/replace
Apr 11, 2024 · Penalty $1,250
Resolve
Complaints
- Paint/plaster
Ceiling
May 4, 2024 · Apt 6N
Close - General
Ventilation system
Apr 19, 2024 · Apt 1B
Close - General
Cabinet
Apr 19, 2024 · Apt 1B
Close - Paint/plaster
Ceiling
Apr 7, 2024 · Apt 6N
Close - Paint/plaster
Ceiling
Apr 5, 2024 · Apt 6N
Close - Heat/hot water
Entire building
Jan 30, 2024 · Apt 3L
Close - Plumbing
Water supply
Jan 30, 2024 · Apt BLDG
Close - Plumbing
Water supply
Jan 30, 2024 · Apt BLDG
Close - Plumbing
Water supply
Jan 30, 2024 · Apt 6M
Close - Plumbing
Water supply
Jan 30, 2024 · Apt 8J
Close
Show 40 more ↓
- Plumbing
Water supply
Jan 30, 2024 · Apt 6F
Close - Plumbing
Water supply
Jan 30, 2024 · Apt 7C
Close - Plumbing
Water supply
Jan 30, 2024 · Apt BLDG
Close - Plumbing
Water supply
Jan 30, 2024 · Apt 3R
Close - Plumbing
Water supply
Jan 29, 2024 · Apt 3H
Close - Plumbing
Water supply
Jan 29, 2024 · Apt 2M
Close - Plumbing
Water supply
Jan 29, 2024 · Apt 3K
Close - Plumbing
Water supply
Jan 29, 2024 · Apt 6A
Close - Plumbing
Water supply
Jan 29, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 29, 2024 · Apt BLDG
Close - Plumbing
Water supply
Jan 29, 2024 · Apt 5E
Close - Plumbing
Water supply
Jan 29, 2024 · Apt 4L
Close - Plumbing
Water supply
Jan 29, 2024 · Apt 7G
Close - Plumbing
Water supply
Jan 29, 2024 · Apt BLDG
Close - Plumbing
Water supply
Jan 29, 2024 · Apt 5B
Close - Heat/hot water
Entire building
Jan 29, 2024 · Apt BLDG
Close - Plumbing
Water supply
Jan 29, 2024 · Apt BLDG
Close - Plumbing
Water supply
Jan 29, 2024 · Apt 3T
Close - Plumbing
Water supply
Jan 29, 2024 · Apt 3R
Close - Plumbing
Water supply
Jan 29, 2024 · Apt BLDG
Close - Plumbing
Water supply
Jan 29, 2024 · Apt 6F
Close - Plumbing
Water supply
Jan 29, 2024 · Apt BLDG
Close - Plumbing
Water supply
Jan 29, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 29, 2024 · Apt BLDG
Close - Plumbing
Water supply
Jan 29, 2024 · Apt 3B
Close - Plumbing
Water supply
Jan 29, 2024 · Apt 4F
Close - Plumbing
Water supply
Jan 29, 2024 · Apt 3L
Close - Plumbing
Water supply
Jan 29, 2024 · Apt BLDG
Close - Plumbing
Water supply
Jan 29, 2024 · Apt BLDG
Close - Plumbing
Water supply
Jan 29, 2024 · Apt BLDG
Close - Plumbing
Water supply
Jan 29, 2024 · Apt BLDG
Close - Plumbing
Water supply
Jan 29, 2024 · Apt BLDG
Close - Plumbing
Water supply
Jan 29, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 29, 2024 · Apt 4H
Close - Plumbing
Water supply
Jan 29, 2024 · Apt 3C
Close - Plumbing
Water supply
Jan 29, 2024 · Apt BLDG
Close - Plumbing
Water supply
Jan 29, 2024 · Apt BLDG
Close - Plumbing
Water supply
Jan 29, 2024 · Apt 5L
Close - Plumbing
Water supply
Jan 29, 2024 · Apt 6H
Close - Plumbing
Water supply
Jan 29, 2024 · Apt 6N
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 2015
- Floors
- 8
- Residential units
- 131
- Building area
- 169,423 ft²
- Lot area
- 31,927 ft²
- Zoning
- R7A
- Community board
- 314
- Council district
- 40
- Block / lot
- 5052 / 45
- Assessed value
- $15,135,300
- Landmark / historic district
- No
HPD registration #387290, last renewed Jul 1, 2025.
Questions about 45 Woodruff Avenue
Who owns 45 Woodruff Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 123 On The Park LLC.
Does 45 Woodruff Avenue have violations?
Yes. NYC HPD has recorded 9 housing violations at this property.
Is 45 Woodruff Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 45 Woodruff Avenue built?
City records list 2015 as the year it was built.
How many apartments are in 45 Woodruff Avenue?
It has 131 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.