642 East 31 Street
Brooklyn, NY 11210BBL 3-05005-0060Map
Owner of record: Simon, Carol
642 East 31 Street is a two-family home built in 1925 in Brooklyn, 11210. It has 2 residential units across 2.5 floors. The owner of record is Simon, Carol. HPD has recorded 16 housing violations here, most recently on January 22, 2024. 11 of the 16 most recent violations are still open.
- HPD violations
- 16
- DOB violations
- 0
- ECB violations
- 2
- HPD complaints
- 31
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 16
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jan 22, 2024
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from east at south wall in the bathroom located at apt firstf, 1st story, 1st apartment from east at south
Jan 21, 2024 · Apt FIRSTF
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east at south located at apt firstf, 1st story, 1st apartment from east at south
Jan 21, 2024 · Apt FIRSTF
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of scalding hot water exceeds the maximum operating allowance of 130 degrees fahrenheit found at the kitchen sink 138 degrees fahrenheit in the entire apartment located at apt firstf, 1st story, 1st apartment from east at south
Jan 21, 2024 · Apt FIRSTF
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, 1st closet from north at east wall door frame, 1st door frame from east at south wall, 1st window frame from west at north wall, 1st window frame from north at east wall in the 2nd room from east at north located at apt firstf, 1st story, 1st apartment from east at south
Jan 21, 2024 · Apt FIRSTF
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from east at south wall, 2nd window frame from east at south wall, 3rd window frame from east at south wall in the 2nd room from east at south located at apt firstf, 1st story, 1st apartment from east at south
Jan 21, 2024 · Apt FIRSTF
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st window frame from west at north wall in the bathroom located at apt firstf, 1st story, 1st apartment from east at south
Jan 21, 2024 · Apt FIRSTF
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall in the foyer located at apt firstf, 1st story, 1st apartment from east at south
Jan 21, 2024 · Apt FIRSTF
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt firstf, 1st story, 1st apartment from east at south
Jan 21, 2024 · Apt FIRSTF
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt fl1, 1st story, 1st apartment from east at south
Oct 28, 2022 · Apt FL1
Open — Invalid certification
Show 6 more ↓
- BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt fl1, 1st story, 1st apartment from east at south
Oct 28, 2022 · Apt FL1
Open — Invalid certification - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt fl1, 1st story, 1st apartment from east at south
Oct 28, 2022 · Apt FL1
Open — Invalid certification - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at north wall in the 1st room from east located at apt fl1, 1st story, 1st apartment from east at south
Oct 28, 2022 · Apt FL1
Open — Invalid certification - BHazardous
Remove all obstructions and repair all defects in bathtub in the bathroom located at apt fl1, 1st story, 1st apartment from east at south
Oct 28, 2022 · Apt FL1
Open — Invalid certification - BHazardous
Replace with new the missing ceramic tiles at south wall in the bathroom located at apt fl1, 1st story, 1st apartment from east at south
Oct 28, 2022 · Apt FL1
Open — Invalid certification - BHazardous
Remove all obstructions and repair all defects in waste pipe at sink in the kitchen located at apt fl1, 1st story, 1st apartment from east at south
Oct 28, 2022 · Apt FL1
Open — Invalid certification
DOB building violations · 0
No DOB violations on record
ECB violations · 2
- Class - 2
Residence converted maintained or occupied as a dwelling for more than legally approved number of families authorized by the c of of or offical department records. dept of building records official records
Mar 27, 2020 · Penalty $10,000
Active - Class - 2
Work w/o a permit; note: @cellar lvl erected full height partition creating (bedroom a) installed water and waste lines for 3pcs bathroom(shower, sink & tiolet) residential sink in kitchen area electrical
Mar 27, 2020 · Penalty $6,250
Active
Complaints
- Heat/hot water
Apartment only
Jan 19, 2024 · Apt FIRSTF
Close - Door/window
Window frame
Jan 19, 2024 · Apt FIRSTF
Close - Unsanitary condition
Mold
Jan 19, 2024 · Apt FIRSTF
Close - Flooring/stairs
Floor
Jan 19, 2024 · Apt FIRSTF
Close - Heat/hot water
Apartment only
Oct 30, 2022 · Apt 1FLOOR
Close - Flooring/stairs
Floor
Oct 29, 2022 · Apt FIRSTF
Close - Paint/plaster
Ceiling
Oct 29, 2022 · Apt FIRSTF
Close - Heat/hot water
Apartment only
Oct 29, 2022 · Apt FIRSTF
Close - Paint/plaster
Ceiling
Oct 27, 2022 · Apt FL1
Close - Door/window
Window frame
Oct 27, 2022 · Apt FL1
Close
Show 21 more ↓
- Flooring/stairs
Floor
Oct 27, 2022 · Apt FL1
Close - Heat/hot water
Apartment only
Jun 19, 2021 · Apt 1
Close - Heat/hot water
Apartment only
Apr 5, 2021 · Apt 1FLOOR
Close - Heat/hot water
Apartment only
Apr 2, 2021 · Apt 1FL
Close - Heat/hot water
Apartment only
Mar 10, 2021 · Apt 1FLOOR
Close - Heat/hot water
Apartment only
Mar 9, 2021 · Apt FLOOR1
Close - Paint/plaster
Ceiling
Mar 23, 2005 · Apt 1STFL
Close - Nonconst
Vermin
Mar 23, 2005 · Apt 1STFL
Close - Heating
Heat related
Mar 23, 2005 · Apt 1STFL
Close - General
Doors
Mar 23, 2005 · Apt 1STFL
Close - General
Doors
Mar 23, 2005 · Apt 1STFL
Close - Paint/plaster
Wall
Mar 23, 2005 · Apt 1STFL
Close - Paint/plaster
Ceiling
Mar 23, 2005 · Apt 1STFL
Close - Nonconst
Illegal
Mar 23, 2005 · Apt 1STFL
Close - Plumbing
Radiator
Mar 23, 2005 · Apt 1STFL
Close - General
Windows
Mar 23, 2005 · Apt 1STFL
Close - Appliance
Refrigerator
Mar 23, 2005 · Apt 1STFL
Close - Plumbing
Toilet
Mar 23, 2005 · Apt 1STFL
Close - Plumbing
Water supply
Mar 23, 2005 · Apt 1STFL
Close - Plumbing
Bathtub/shower
Mar 23, 2005 · Apt 1STFL
Close - Heating
Heat related
Mar 23, 2005 · Apt 1STFL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B2)
- Year built
- 1925
- Floors
- 2.5
- Residential units
- 2
- Building area
- 2,564 ft²
- Lot area
- 4,000 ft²
- Zoning
- R6
- Community board
- 317
- Council district
- 45
- Block / lot
- 5005 / 60
- Assessed value
- $74,460
- Landmark / historic district
- No
Questions about 642 East 31 Street
Who owns 642 East 31 Street?
The owner of record in NYC Department of City Planning PLUTO data is Simon, Carol.
Does 642 East 31 Street have violations?
Yes. NYC HPD has recorded 16 housing violations at this property.
Is 642 East 31 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 642 East 31 Street built?
City records list 1925 as the year it was built.
How many apartments are in 642 East 31 Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.