roofy

3007 Farragut Road

Brooklyn, NY 11210BBL 3-04994-0006Map

Owner of record: Don & Mills Properties, LLC

3007 Farragut Road is an office building built in 2012 in Brooklyn, 11210. The owner of record is Don & Mills Properties, LLC. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
9
ECB violations
18
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 9

  • Residential elevator periodic inspection/test elevatorrequired

    Failure to perform category 5 inspection

    Dec 17, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 3, 2021

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 28, 2015

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 2, 2013

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 2, 2013

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 2, 2013

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 2, 2013

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Dec 12, 2012

    Dob violation - dismissed

ECB violations · 18

  • Class - 1

    Cease use item: inoperative zone lock restrictor class 2 items: unlabeled gov access door. misaligned gov access door; cannot be opened

    Dec 8, 2020 · Penalty $3,125

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and/or approved amendments. noted: a 7 sty steel frame bldg under construction steel staircase being fabricated on site w/welds when plan calls for

    Sep 18, 2012 · Penalty $250

    Resolve
  • Class - 1

    Sec. 3301.7. design drawing required by the provision of chapter 33 ofnyc bldg code. noted: 7 sty steel frame bldg under construction has ladder platform constructed of 2'x4' wood & plywood, from flrs 4-7 w/no

    Sep 18, 2012 · Penalty $8,000

    Resolve
  • Class - 1

    Bc3314.1.scaffold has not been maintained in a safe manner.noted:excessive debris brick,mortar scattered on planks,on fine proof mesh netting,missing guardrails,toeboards,planks not tied together.also cross con

    Sep 12, 2012 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction. no handrails. noted:at stairwell b at exposure #2 between2nd & 3rd flr levels hand rails installed is inadequate in that it loo

    Aug 21, 2012 · Penalty $1,000

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping per section requirements. noted:at all flrs storage of combustible material & debris throughout. rem:maintain adequate housekeeping.

    Aug 21, 2012 · Penalty $800

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction. no guard rails or inadequate:noted at 4th flr level exposure #4 guard rail system installed is inadequate. it is constructed wi

    Aug 21, 2012 · Penalty $2,400

    Resolve
  • Class - 1

    Inadequate safety measures:operation of hoisting in unsafe manner.noted:@ 2 flr level of new bldg @ exposure#2 have a manual chain hoisting machine installed inadequatlu contrary to manufactures design & set-up

    Apr 24, 2012

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected by constructionoperations. noted: at active job site, 3 sty steel bldg under construction at 3rd flr pouring concrete at exp 4 has no overhead protection

    Apr 11, 2012

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction - no guard rails. noted: at active steel job site. at 2ndflr and 3rd flr, rebar has been welded in place for guard rail. system

    Apr 11, 2012 · Penalty $800

    Resolve
Show 8 more ↓
  • Class - 2

    Failure to maintain adequate housekeeping per section requirements: noted: at front of premises debris scattered throughout e.g. pieces of wood,blocks,cans,steel & plastic bags of thrash stored. contrary to

    Mar 21, 2012

    Resolve
  • Class - 2

    Sec. 3304.4;27-1032b failure to provide 3ft 6in guard rail or solid enclosure around open & accessible sides of excavation noted: upon inspection no guard rails in place at exposure 3 & 4 or inadequate.

    Aug 31, 2011

    Resolve
  • Class - 2

    Work does not conform to approved plans. noted: upon inspection footings installed w/o revised/approved plans. full s.w.o. issued pursuant to 28-207.2 & posted at premises. stop all work. remedy: conform to

    Aug 31, 2011

    Resolve
  • Class - 2

    Sec. 27-1029 failure to monitor adjoining structures for movement in all directions during excavation. related activity that may adversely affect adjoining structures. noted: upon inspection no monitoring of

    Aug 31, 2011

    Resolve
  • Non-hazardous

    9a,9b,49. boiler stamp missing manufacturer data not available to very pressure of this boiler bq9 operated boiler without equipment use.

    Jul 8, 1999 · Penalty $180

    Resolve
  • Hazardous

    Boiler design pressure os poopsi safety value is sel-far 125 psi to be replaced by new one se-al-loopsi also ssfetu value seal is stuck & inoperative.

    May 16, 1996 · Penalty $250

    Resolve
  • Non-hazardous

    Boilers

    May 17, 1994

    Resolve
  • Non-hazardous

    32. valve inoperative manually to replace by new one safely.

    Dec 9, 1992 · Penalty $100

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Office building (O7)
Year built
2012
Floors
6
Residential units
—
Building area
22,958 ft²
Lot area
4,000 ft²
Zoning
R6
Community board
317
Council district
45
Block / lot
4994 / 6
Assessed value
$2,018,700
Landmark / historic district
No

Questions about 3007 Farragut Road

Who owns 3007 Farragut Road?

The owner of record in NYC Department of City Planning PLUTO data is Don & Mills Properties, LLC.

Does 3007 Farragut Road have violations?

NYC HPD has no housing violations on record for this property.

Is 3007 Farragut Road rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 3007 Farragut Road built?

City records list 2012 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.