552 East 34 Street
Brooklyn, NY 11203BBL 3-04950-0013Map
Owner of record: 905 Troy Ave Br 2022 INC.
552 East 34 Street is a two-family home built in 1920 in Brooklyn, 11203. It has 2 residential units across 2 floors. The owner of record is 905 Troy Ave Br 2022 INC.. HPD has recorded 220 housing violations here, most recently on August 9, 2026. 48 of the 50 most recent violations are still open.
- HPD violations
- 220
- DOB violations
- 1
- ECB violations
- 2
- HPD complaints
- 551
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 220
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Aug 9, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical ceiling light fixture in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Aug 9, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Aug 1, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Aug 1, 2026 · Apt 2
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Jul 29, 2026 · Apt 2
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Jul 29, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is defective in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Jul 29, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Jul 29, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Jul 29, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Repair the leaky and/or defective water supply pipe at water closet in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Jul 29, 2026 · Apt 2
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Abate the nuisance consisting of scalding hotwater above 130 degrees in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Jul 29, 2026 · Apt 2
Closed — Violation closed - BHazardous
Replace with new the missing light fixture at ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Jul 29, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective hinges at gate at lot line front yard
Jul 28, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective pane glass at lower sash window , 2nd from south at west wall building front yard
Jul 22, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective dislodged stucco, at east wall and ceiling, below entrance porch , building front yard
Jul 22, 2026
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock installed on gate at building entrance yard
Jul 22, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective iron guard rail at stair below grade , at building front yard
Jul 22, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective unhinged iron gate at entrance to building, front yard
Jul 22, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, 1st window frame from south at west wall, south wall in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Jul 8, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from east at south wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Jul 8, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Jul 8, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 2nd window frame from south at west wall in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Jul 8, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 3rd private hallway from east located at apt 2, 2nd story, 1st apartment from east at south
Jul 8, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperable in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Jul 8, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective upper window sash glass pane at 2nd window from south at west in the 4th room from east at south located at apt 2, 2nd story, 1st apartment from east at south
Jul 8, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at the ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Jul 8, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective base cabinet at sink in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Jul 8, 2026 · Apt 2
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Jul 8, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures ,,, in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Jul 8, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 2nd private hallway located at apt 2, 2nd story, 1st apartment from south at west
Jul 1, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east at south, the foyer located at apt 2, 2nd story, 1st apartment from south at west
Jul 1, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective glass window at upper and lower sash, 2nd window from south in the 4th room from east located at apt 2, 2nd story, 1st apartment from south at west
Jul 1, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Jul 1, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood base cabinet doors at east wall in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Jul 1, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures no hot water volume at kitchen and bathroom plumbing fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Jul 1, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl . in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Jul 1, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective connection at bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Jul 1, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective saddle in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Jul 1, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance for upper and lower sash window in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Jul 1, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Jun 26, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures no volume in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Jun 26, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Jun 20, 2026 · Apt 2
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Jun 20, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective base cabinet at sink in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Jun 20, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Jun 20, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective sink base cabinet doors in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Jun 20, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective broken glass at upper window sash at second window from south at west in the 4th room from east at south located at apt 2, 2nd story, 1st apartment from east at south
Jun 20, 2026 · Apt 2
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Jun 20, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective electrical outlet cover at north in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Jun 20, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Jun 20, 2026 · Apt 2
Open — Nov sent out
DOB building violations · 1
- Construction other optional
Work without permit; remedy; stop all work immediately obvtain permit, call 718 802-3685 be fore wiork continue
Mar 15, 2011
Vw*-violation - work w/o permit dismissed
ECB violations · 2
- Class - 2
Owner has blocked and baracaded all entrance to the basement. possible illegal apt in basement. no hot water or heat is being supplied to the complianted apt on second floor., maintain boiler; open basement and
Jun 17, 2026 · Penalty $1,280
Active - Class - 2
At time of inspection i observed that there is no hot water in 2nd floor apartments which is prohibited per pc 607.1 requires hot water be supplied to all plumbing fixtures., repair and/or replace
Apr 16, 2026 · Penalty $6,250
Active
Complaints
- Plumbing
Water supply
Aug 31, 2026 · Apt 2
Close - Electric
Power outage
Aug 31, 2026 · Apt 2
Close - Heat/hot water
Entire building
Aug 31, 2026 · Apt 2
Close - Electric
Power outage
Aug 8, 2026 · Apt 2NDFLO
Close - Electric
Power outage
Aug 8, 2026 · Apt 2FL
Close - Electric
Power outage
Aug 8, 2026 · Apt 2
Close - Unsanitary condition
Mold
Aug 8, 2026 · Apt 2
Close - Electric
No lighting
Aug 8, 2026 · Apt 2
Close - Electric
No lighting
Aug 8, 2026 · Apt 2
Close - Electric
Power outage
Aug 7, 2026 · Apt 2
Close
Show 40 more ↓
- Plumbing
Toilet
Aug 6, 2026 · Apt 2
Close - Water leak
Slow leak
Aug 6, 2026 · Apt 2
Close - Door/window
Window pane
Aug 6, 2026 · Apt 2
Close - Unsanitary condition
Mold
Aug 6, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Aug 6, 2026 · Apt 2
Close - Paint/plaster
Ceiling
Aug 6, 2026 · Apt 11HFLO
Close - Plumbing
Bathtub/shower
Aug 5, 2026 · Apt 1FOOR2
Close - Unsanitary condition
Pests
Aug 5, 2026 · Apt 1FAND2
Close - Water leak
Damp spot
Aug 5, 2026 · Apt 1FAND2
Close - Paint/plaster
Cabinet
Aug 5, 2026 · Apt 11HFLO
Close - Electric
No lighting
Aug 2, 2026 · Apt BLDG
Close - Electric
No lighting
Aug 1, 2026 · Apt 2
Close - Plumbing
Water supply
Jul 31, 2026 · Apt 1FLOOR
Close - Plumbing
Water supply
Jul 31, 2026 · Apt 1FLOOR
Close - Heat/hot water
Entire building
Jul 31, 2026 · Apt BLDG
Close - Water leak
Slow leak
Jul 30, 2026 · Apt 2
Close - Electric
No lighting
Jul 30, 2026 · Apt 2NDFL
Close - Heat/hot water
Entire building
Jul 30, 2026 · Apt 2
Close - Flooring/stairs
Floor
Jul 30, 2026 · Apt 2
Close - Plumbing
Toilet
Jul 30, 2026 · Apt 2
Close - Door/window
Door
Jul 30, 2026 · Apt 2NDFL
Close - Unsanitary condition
Mold
Jul 30, 2026 · Apt 2
Close - Plumbing
Water supply
Jul 30, 2026 · Apt 2NDFL
Close - Heat/hot water
Entire building
Jul 30, 2026 · Apt 2NDFL
Close - Heat/hot water
Entire building
Jul 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 30, 2026 · Apt BLDG
Close - Electric
No lighting
Jul 30, 2026 · Apt 2
Close - Electric
No lighting
Jul 30, 2026 · Apt 2
Close - Plumbing
Water supply
Jul 29, 2026 · Apt 1FLOOR
Close - Plumbing
Water supply
Jul 29, 2026 · Apt 1FLOOR
Close - Heat/hot water
Entire building
Jul 29, 2026 · Apt BLDG
Close - Plumbing
Bathtub/shower
Jul 29, 2026 · Apt FLOOR2
Close - Plumbing
Water supply
Jul 29, 2026 · Apt 2A
Close - Safety
Smoke detector
Jul 28, 2026 · Apt 2
Close - Plumbing
Water supply
Jul 28, 2026 · Apt 2
Open - Heat/hot water
Entire building
Jul 28, 2026 · Apt 2
Open - Paint/plaster
Wall
Jul 28, 2026 · Apt 2
Close - Unsanitary condition
Mold
Jul 28, 2026 · Apt 2
Close - Unsanitary condition
Pests
Jul 28, 2026 · Apt 2
Close - Heat/hot water
Entire building
Jul 28, 2026 · Apt 2
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Jun 30, 2026 | $500,000 | Two family dwellings | 2 |
Building details
- Building type
- Two-family home (B2)
- Year built
- 1920
- Floors
- 2
- Residential units
- 2
- Building area
- 2,064 ft²
- Lot area
- 2,000 ft²
- Zoning
- R4
- Community board
- 317
- Council district
- 45
- Block / lot
- 4950 / 13
- Assessed value
- $61,800
- Landmark / historic district
- No
HPD registration #825119, last renewed Jul 31, 2024.
Questions about 552 East 34 Street
Who owns 552 East 34 Street?
The owner of record in NYC Department of City Planning PLUTO data is 905 Troy Ave Br 2022 INC..
Does 552 East 34 Street have violations?
Yes. NYC HPD has recorded 220 housing violations at this property.
Is 552 East 34 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 552 East 34 Street built?
City records list 1920 as the year it was built.
How many apartments are in 552 East 34 Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.