roofy

552 East 34 Street

Brooklyn, NY 11203BBL 3-04950-0013Map

Owner of record: 905 Troy Ave Br 2022 INC.

552 East 34 Street is a two-family home built in 1920 in Brooklyn, 11203. It has 2 residential units across 2 floors. The owner of record is 905 Troy Ave Br 2022 INC.. HPD has recorded 220 housing violations here, most recently on August 9, 2026. 49 of the 50 most recent violations are still open.

HPD violations
220
DOB violations
1
ECB violations
2
HPD complaints
551

What to know

Concern
15 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Aug 9, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 220

  • B

    Properly repair or replace the broken or defective electrical ceiling light fixture in the kitchen located at apt 2, 2nd story, 1st apartment from south at west

    Aug 9, 2026 · Apt 2

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Aug 9, 2026 · Apt 2

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Aug 1, 2026 · Apt 2

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Aug 1, 2026 · Apt 2

    Open — Nov sent out
  • A

    Repair the leaky and/or defective water supply pipe at water closet in the bathroom located at apt 2, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is defective in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2

    Open — Nov sent out
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2

    Open — Nov sent out
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2

    Open — Nov sent out
Show 40 more ↓
  • C

    Abate the nuisance consisting of scalding hotwater above 130 degrees in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2

    Closed — Violation closed
  • B

    Replace with new the missing light fixture at ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from south at west

    Jul 29, 2026 · Apt 2

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective hinges at gate at lot line front yard

    Jul 28, 2026

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective pane glass at lower sash window , 2nd from south at west wall building front yard

    Jul 22, 2026

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective dislodged stucco, at east wall and ceiling, below entrance porch , building front yard

    Jul 22, 2026

    Open — Nov sent out
  • C

    Remove the illegal fastening double cylinder key operated lock installed on gate at building entrance yard

    Jul 22, 2026

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective iron guard rail at stair below grade , at building front yard

    Jul 22, 2026

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective unhinged iron gate at entrance to building, front yard

    Jul 22, 2026

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from east at south wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south

    Jul 8, 2026 · Apt 2

    Open — Nov sent out
  • C

    Provide adequate supply of hot water for the fixtures ,,, in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Jul 8, 2026 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the north wall, 1st window frame from south at west wall, south wall in the kitchen located at apt 2, 2nd story, 1st apartment from east at south

    Jul 8, 2026 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the bathroom located at apt 2, 2nd story, 1st apartment from south at west

    Jul 8, 2026 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 2nd window frame from south at west wall in the kitchen located at apt 2, 2nd story, 1st apartment from east at south

    Jul 8, 2026 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 3rd private hallway from east located at apt 2, 2nd story, 1st apartment from east at south

    Jul 8, 2026 · Apt 2

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperable in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Jul 8, 2026 · Apt 2

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective upper window sash glass pane at 2nd window from south at west in the 4th room from east at south located at apt 2, 2nd story, 1st apartment from east at south

    Jul 8, 2026 · Apt 2

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at the ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from east at south

    Jul 8, 2026 · Apt 2

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective base cabinet at sink in the kitchen located at apt 2, 2nd story, 1st apartment from east at south

    Jul 8, 2026 · Apt 2

    Open — Nov sent out
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Jul 8, 2026 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective connection at bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from south at west

    Jul 1, 2026 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east at south, the foyer located at apt 2, 2nd story, 1st apartment from south at west

    Jul 1, 2026 · Apt 2

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective glass window at upper and lower sash, 2nd window from south in the 4th room from east located at apt 2, 2nd story, 1st apartment from south at west

    Jul 1, 2026 · Apt 2

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 2nd private hallway located at apt 2, 2nd story, 1st apartment from south at west

    Jul 1, 2026 · Apt 2

    Open — Nov sent out
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl . in the bathroom located at apt 2, 2nd story, 1st apartment from south at west

    Jul 1, 2026 · Apt 2

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2, 2nd story, 1st apartment from south at west

    Jul 1, 2026 · Apt 2

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective wood base cabinet doors at east wall in the kitchen located at apt 2, 2nd story, 1st apartment from south at west

    Jul 1, 2026 · Apt 2

    Open — Nov sent out
  • C

    Provide adequate supply of hot water for the fixtures no hot water volume at kitchen and bathroom plumbing fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Jul 1, 2026 · Apt 2

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective saddle in the bathroom located at apt 2, 2nd story, 1st apartment from south at west

    Jul 1, 2026 · Apt 2

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective spring balance for upper and lower sash window in the kitchen located at apt 2, 2nd story, 1st apartment from south at west

    Jul 1, 2026 · Apt 2

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Jun 26, 2026 · Apt 2

    Open — Nov sent out
  • C

    Provide adequate supply of hot water for the fixtures no volume in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Jun 26, 2026 · Apt 2

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective lower window sash spring balance at the 1st window from south at west in the kitchen located at apt 2, 2nd story, 1st apartment from east at south

    Jun 20, 2026 · Apt 2

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Jun 20, 2026 · Apt 2

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electrical outlet at the north wall in the kitchen located at apt 2, 2nd story, 1st apartment from east at south

    Jun 20, 2026 · Apt 2

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of electrical wire at the ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from east at south

    Jun 20, 2026 · Apt 2

    Open — Nov sent out
  • C

    Provide adequate supply of hot water for the fixtures ... in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Jun 20, 2026 · Apt 2

    Open — Nov sent out
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Jun 20, 2026 · Apt 2

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective base cabinet at sink in the kitchen located at apt 2, 2nd story, 1st apartment from east at south

    Jun 20, 2026 · Apt 2

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Jun 20, 2026 · Apt 2

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective sink base cabinet doors in the kitchen located at apt 2, 2nd story, 1st apartment from south at west

    Jun 20, 2026 · Apt 2

    Open — Nov sent out

DOB building violations · 1

  • Construction other optional

    Work without permit; remedy; stop all work immediately obvtain permit, call 718 802-3685 be fore wiork continue

    Mar 15, 2011

    Vw*-violation - work w/o permit dismissed

ECB violations · 2

  • Class - 2

    Owner has blocked and baracaded all entrance to the basement. possible illegal apt in basement. no hot water or heat is being supplied to the complianted apt on second floor., maintain boiler; open basement and

    Jun 17, 2026 · Penalty $1,280

    Active
  • Class - 2

    At time of inspection i observed that there is no hot water in 2nd floor apartments which is prohibited per pc 607.1 requires hot water be supplied to all plumbing fixtures., repair and/or replace

    Apr 16, 2026 · Penalty $6,250

    Active

Complaints

  • Plumbing

    Water supply

    Aug 31, 2026 · Apt 2

    Close
  • Electric

    Power outage

    Aug 31, 2026 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Aug 31, 2026 · Apt 2

    Close
  • Electric

    Power outage

    Aug 8, 2026 · Apt 2NDFLO

    Close
  • Electric

    Power outage

    Aug 8, 2026 · Apt 2FL

    Close
  • Electric

    Power outage

    Aug 8, 2026 · Apt 2

    Close
  • Unsanitary condition

    Mold

    Aug 8, 2026 · Apt 2

    Close
  • Electric

    No lighting

    Aug 8, 2026 · Apt 2

    Close
  • Electric

    No lighting

    Aug 8, 2026 · Apt 2

    Close
  • Electric

    Power outage

    Aug 7, 2026 · Apt 2

    Close
Show 40 more ↓
  • Plumbing

    Toilet

    Aug 6, 2026 · Apt 2

    Close
  • Water leak

    Slow leak

    Aug 6, 2026 · Apt 2

    Close
  • Door/window

    Window pane

    Aug 6, 2026 · Apt 2

    Close
  • Unsanitary condition

    Mold

    Aug 6, 2026 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Aug 6, 2026 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Aug 6, 2026 · Apt 11HFLO

    Close
  • Plumbing

    Bathtub/shower

    Aug 5, 2026 · Apt 1FOOR2

    Close
  • Unsanitary condition

    Pests

    Aug 5, 2026 · Apt 1FAND2

    Close
  • Water leak

    Damp spot

    Aug 5, 2026 · Apt 1FAND2

    Close
  • Paint/plaster

    Cabinet

    Aug 5, 2026 · Apt 11HFLO

    Close
  • Electric

    No lighting

    Aug 2, 2026 · Apt BLDG

    Close
  • Electric

    No lighting

    Aug 1, 2026 · Apt 2

    Close
  • Plumbing

    Water supply

    Jul 31, 2026 · Apt 1FLOOR

    Close
  • Plumbing

    Water supply

    Jul 31, 2026 · Apt 1FLOOR

    Close
  • Heat/hot water

    Entire building

    Jul 31, 2026 · Apt BLDG

    Close
  • Water leak

    Slow leak

    Jul 30, 2026 · Apt 2

    Close
  • Electric

    No lighting

    Jul 30, 2026 · Apt 2NDFL

    Close
  • Heat/hot water

    Entire building

    Jul 30, 2026 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Jul 30, 2026 · Apt 2

    Close
  • Plumbing

    Toilet

    Jul 30, 2026 · Apt 2

    Close
  • Door/window

    Door

    Jul 30, 2026 · Apt 2NDFL

    Close
  • Unsanitary condition

    Mold

    Jul 30, 2026 · Apt 2

    Close
  • Plumbing

    Water supply

    Jul 30, 2026 · Apt 2NDFL

    Close
  • Heat/hot water

    Entire building

    Jul 30, 2026 · Apt 2NDFL

    Close
  • Heat/hot water

    Entire building

    Jul 30, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jul 30, 2026 · Apt BLDG

    Close
  • Electric

    No lighting

    Jul 30, 2026 · Apt 2

    Close
  • Electric

    No lighting

    Jul 30, 2026 · Apt 2

    Close
  • Plumbing

    Water supply

    Jul 29, 2026 · Apt 1FLOOR

    Close
  • Plumbing

    Water supply

    Jul 29, 2026 · Apt 1FLOOR

    Close
  • Heat/hot water

    Entire building

    Jul 29, 2026 · Apt BLDG

    Close
  • Plumbing

    Bathtub/shower

    Jul 29, 2026 · Apt FLOOR2

    Close
  • Plumbing

    Water supply

    Jul 29, 2026 · Apt 2A

    Close
  • Safety

    Smoke detector

    Jul 28, 2026 · Apt 2

    Close
  • Plumbing

    Water supply

    Jul 28, 2026 · Apt 2

    Open
  • Heat/hot water

    Entire building

    Jul 28, 2026 · Apt 2

    Open
  • Paint/plaster

    Wall

    Jul 28, 2026 · Apt 2

    Close
  • Unsanitary condition

    Mold

    Jul 28, 2026 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Jul 28, 2026 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Jul 28, 2026 · Apt 2

    Close

Sales history

DatePriceTypeUnits
Jun 30, 2026$500,000Two family dwellings2

Building details

Building type
Two-family home (B2)
Year built
1920
Floors
2
Residential units
2
Building area
2,064 ft²
Lot area
2,000 ft²
Zoning
R4
Community board
317
Council district
45
Block / lot
4950 / 13
Assessed value
$61,800
Landmark / historic district
No

HPD registration #825119, last renewed Jul 31, 2024.

Questions about 552 East 34 Street

Who owns 552 East 34 Street?

The owner of record in NYC Department of City Planning PLUTO data is 905 Troy Ave Br 2022 INC..

Does 552 East 34 Street have violations?

Yes. NYC HPD has recorded 220 housing violations at this property.

Is 552 East 34 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 552 East 34 Street built?

City records list 1920 as the year it was built.

How many apartments are in 552 East 34 Street?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.