3401 Clarendon Road
Brooklyn, NY 11203BBL 3-04934-0042Map
Owner of record: Adams, Kerwin C
3401 Clarendon Road is a two-family home built in 1930 in Brooklyn, 11203. It has 2 residential units across 2 floors. The owner of record is Adams, Kerwin C. HPD has recorded 35 housing violations here, most recently on June 22, 2011. 35 of the 35 most recent violations are still open.
- HPD violations
- 35
- DOB violations
- 3
- ECB violations
- 1
- HPD complaints
- 28
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 35
- IInformation / order
The premises or apts. have been vacated by the department and cannot be reoccupied until so ordered after proof of compliance for entire bldg
Jun 22, 2011
Open — Info nov sent out - BHazardous
Abate the nuisance consisting of no electric supply in the entire apartment located at apt 2fl, 2nd story
Jun 2, 2011 · Apt 2FL
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of fire damages in the entire apartment located at apt 2fl, 2nd story
Jun 2, 2011 · Apt 2FL
Open — Nov sent out - BHazardous
Replace with new the missing lower and upper window sashes at 1st public hall from north, 1st story
Jun 2, 2011
Open — Nov sent out - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible , , 1st story
Jun 2, 2011
Open — Nov sent out - BHazardous
Replace with new the missing lower and upper window sashes (total 15 windows) , 1st story
Jun 2, 2011
Open — Nov sent out - BHazardous
Section 9, 56, 193, 300, 302 m.d. law- above frame building has been converted from a private dwelling to a multiple dwelling and is now occupied and maintained as such contrary to law.restore premises to lawful occupancy, 1st story
Jun 2, 2011
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures , in the entire apartment located at apt 2fl, 2nd story
Jun 2, 2011 · Apt 2FL
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures , in the entire apartment located at apt 2fl, 2nd story
Jun 2, 2011 · Apt 2FL
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures , in the entire apartment located at apt 2fl, 2nd story
Jun 2, 2011 · Apt 2FL
Open — Nov sent out
Show 25 more ↓
- BHazardous
Replace with new the missing lower and upper window sahes (total 13 windows) in the entire apartment located at apt 2fl, 2nd story
Jun 2, 2011 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the entire apartment located at apt 2fl, 2nd story
Jun 2, 2011 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceilings and walls in the entire apartment located at apt 2fl, 2nd story
Jun 2, 2011 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceilings and walls , 1st story
Jun 2, 2011
Open — Nov sent out - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections , at cellar
Jun 2, 2011
Open — Nov sent out - BHazardous
Section 9, 56, 193, 300, 302 m.d. law- above frame building has been converted from a private dwelling to a multiple dwelling and is now occupied and maintained as such contrary to law.restore premises to lawful occupancy at cellar
Jun 2, 2011
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ashphalt roof (fire damaged)
Jun 2, 2011
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl and wood facades at north and west of building
Jun 2, 2011
Open — Nov sent out - BHazardous
Abate the nuisance consisting of no electric supply to the entire building
Jun 2, 2011
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures , water heater and boiler at cellar
Jun 2, 2011
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures in the entire building
Jun 2, 2011
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin bedbugs in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jul 22, 2009 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jul 22, 2009 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jul 22, 2009 · Apt 1
Open — Nov sent out - BHazardous
Properly secure the loose gutter at roof front
Jul 15, 2009
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock installed on the building front entrance security door , 1st story
Jun 29, 2005
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling rear section in the private hallway located at apt 1fl, 1st story
Jun 29, 2005 · Apt 1FL
Open — Nov sent out - BHazardous
Properly repair the broken or defective lock set in the entrance located at apt 1fl, 1st story
Jun 29, 2005 · Apt 1FL
Open — Nov sent out - ANon-hazardous
Refit door in the entrance located at apt 1fl, 1st story
Jun 29, 2005 · Apt 1FL
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 1fl, 1st story
Jun 29, 2005 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Abate the nuisnace consisting of rodents rats in the kitchen located at apt 1f, 1st story
May 2, 2005 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Abate the nuisnace consisting of rodents rats in the 1st room from north at east located at apt 1f, 1st story
May 2, 2005 · Apt 1F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective concrete tread 2nd up from bottom at stairs front entrance to building at front areaway
May 2, 2005
Open — Nov sent out - ANon-hazardous
Refit upper and lower sashes all windows in the entire apartment located at apt 1f, 1st story
May 2, 2005 · Apt 1F
Open — Nov sent out - BHazardous
Properly repair the broken or defective counter balances lower sashes windows in the entire apartment located at apt 1f, 1st story
May 2, 2005 · Apt 1F
Open — Nov sent out
DOB building violations · 3
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 5, 2011
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Jun 21, 2011
Dob violation - active - Unsafe buildings none
Ub-unsafe buildings none
Jun 21, 2011
V%*-dob violation - dismissed
ECB violations · 1
- Class - 1
Occupancy contrary to that allowed by c/o & dob records. 1 sty doctorsoffice converted into class 'a' apt, partitions erected creating rooms.kitchen & bathroom fixtures present,also 4 'b' rooms created @ cellar
Jun 2, 2011 · Penalty $12,000
Resolve
Complaints
- Heating
Heat related
Jan 6, 2011 · Apt 1F
Close - Heating
Heat related
Dec 13, 2010 · Apt 1F
Close - Heating
Heat related
Nov 24, 2010 · Apt 1F
Close - Heating
Heat related
Feb 4, 2010 · Apt 1F
Close - Nonconst
Vermin
Jul 8, 2009 · Apt 1
Close - Nonconst
Vermin
Jul 8, 2009 · Apt 1
Close - Nonconst
Vermin
Jul 8, 2009 · Apt 1
Close - Heating
Heat related
Jun 1, 2009 · Apt 1
Close - Heating
Heat related
May 30, 2009 · Apt 1
Close - Heating
Heat related
May 23, 2009 · Apt 1
Close
Show 18 more ↓
- Heating
Heat related
Dec 4, 2007 · Apt 1
Close - Heating
Heat related
Jan 3, 2006 · Apt 1F
Close - Heating
Heat related
Dec 19, 2005 · Apt 1FL
Close - Heating
Heat related
Dec 17, 2005 · Apt 1
Close - Heating
Heat related
Dec 14, 2005 · Apt 1
Close - Nonconst
Vermin
Aug 10, 2005 · Apt 1
Close - Nonconst
Vermin
Aug 10, 2005 · Apt 1
Close - General
Doors
Jun 24, 2005 · Apt 1FL
Close - General
Doors
Jun 13, 2005 · Apt 1
Close - Nonconst
Vermin
Jun 13, 2005 · Apt 1
Close - General
Windows
Jun 13, 2005 · Apt 1
Close - General
Windows
Jun 13, 2005 · Apt 1
Close - General
Cabinet
Apr 25, 2005 · Apt 1F
Close - General
Doors
Apr 25, 2005 · Apt 1F
Close - Nonconst
Vermin
Apr 24, 2005 · Apt 1F
Close - General
Floor
Apr 24, 2005 · Apt 1F
Close - Nonconst
Vermin
Apr 24, 2005 · Apt 1F
Close - General
Windows
Apr 24, 2005 · Apt 1F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B2)
- Year built
- 1930
- Floors
- 2
- Residential units
- 2
- Building area
- 2,800 ft²
- Lot area
- 2,200 ft²
- Zoning
- R4
- Community board
- 317
- Council district
- 45
- Block / lot
- 4934 / 42
- Assessed value
- $62,280
- Landmark / historic district
- No
Questions about 3401 Clarendon Road
Who owns 3401 Clarendon Road?
The owner of record in NYC Department of City Planning PLUTO data is Adams, Kerwin C.
Does 3401 Clarendon Road have violations?
Yes. NYC HPD has recorded 35 housing violations at this property.
Is 3401 Clarendon Road rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 3401 Clarendon Road built?
City records list 1930 as the year it was built.
How many apartments are in 3401 Clarendon Road?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.