1715 Nostrand Avenue
Brooklyn, NY 11226BBL 3-04930-0052Map
Owner of record: Jg Reo LLC
1715 Nostrand Avenue is a mixed residential and retail building built in 1930 in Brooklyn, 11226. It has 2 residential units across 3 floors. The owner of record is Jg Reo LLC. HPD has recorded 250 housing violations here, most recently on June 16, 2026. 44 of the 50 most recent violations are still open.
- HPD violations
- 250
- DOB violations
- 24
- ECB violations
- 9
- HPD complaints
- 178
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 250
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and south wall, in the vestibule , 1st story
Jun 16, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at the ceiling and south wall, in the vestibule, , 1st story
Jun 16, 2026
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures range in the kitchenette located at apt 3, 3rd story, 1st apartment from west at north
Jun 16, 2026 · Apt 3
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling and all electrical outlets in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Jun 16, 2026 · Apt 3
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Jun 16, 2026 · Apt 3
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Jun 16, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3, 3rd story, 1st apartment from west at north
Jun 16, 2026 · Apt 3
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 3, 3rd story, 1st apartment from west at north
May 23, 2026 · Apt 3
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective mail receptacles at public hall, 1st story
May 23, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Open — Nov sent out
Show 40 more ↓
- BHazardous
Provide adequate supply of hot water for the fixtures inadequate volume in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
May 1, 2026 · Apt 3
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of cold water for the fixtures at washbasin, watercloset, bathtub and kitchen sink in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Apr 30, 2026 · Apt 3
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 3, 3rd story, 1st apartment from west at north
Apr 30, 2026 · Apt 3
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at bathtub, washbasin, watercloset and kitchen sink in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Apr 30, 2026 · Apt 3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material ceiling, south wall in vestibule at public hall, 1st story
Apr 30, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, south wall in vestibule at public hall, 1st story
Apr 30, 2026
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the water sewage buildup on floor, building rear at boiler room
Apr 30, 2026
Open — Nov sent out - CImmediately hazardous
Remove all obstructions and repair all defects in clogged pipe wasteline, building rear at boiler room
Apr 30, 2026
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of cold water for the fixtures no volume in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Apr 27, 2026 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures no volume in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Apr 27, 2026 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south walls and ceiling at public hall, 1st story
Jan 5, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling at public hall, 1st story
Jan 5, 2026
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the 1st bathroom from east at north located at apt 2, 2nd story, 1st apartment from west at north
Jan 5, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the 3rd bathroom from east at north located at apt 2, 2nd story, 1st apartment from west at north
Jan 5, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the 2nd bathroom from east located at apt 2, 2nd story, 1st apartment from west at north
Jan 5, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 3, 3rd story, 1st apartment from west at north
Jan 5, 2026 · Apt 3
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective unkeyed fire retardant material at the south wall at public hall, 1st story
Jan 5, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective unkeyed plaster at the ceiling at public hall, 1st story
Jan 5, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Jan 5, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Jan 5, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from west at north
Jan 5, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from west at north
Jan 5, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Jan 5, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixtures at the ceiling in the 1st bathroom from east at north located at apt 2, 2nd story, 1st apartment from west at north
Jan 5, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1fl, 1st story, 1st apartment from north at east
Dec 4, 2025 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1fl, 1st story, 1st apartment from north at east
Dec 4, 2025 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 1fl, 1st story, 1st apartment from north at east
Dec 4, 2025 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1fl, 1st story, 1st apartment from north at east
Dec 4, 2025 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1fl, 1st story, 1st apartment from north at east
Dec 4, 2025 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door at celler
Dec 4, 2025
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 20, 2025
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Sep 4, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Sep 4, 2025 · Apt 2
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at electrical fixtures at ceiling and all walls in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from west at north
Sep 4, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Sep 4, 2025 · Apt 2
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at electrical fixtures at ceiling and all walls in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from west at north
Sep 4, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective plaster with fire retardant material southwest walls and ceiling at the vestibule at public hall, 1st story
Aug 15, 2025
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt 3, 3rd story, 1st apartment from west at north
Aug 15, 2025 · Apt 3
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Aug 15, 2025 · Apt 3
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at cooking range in the kitchen located at apt 3, 3rd story, 1st apartment from west at north
Aug 15, 2025 · Apt 3
Open — Nov sent out
DOB building violations · 24
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 16, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 18, 2018
Dob violation - dismissed
Show 14 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - active
ECB violations · 9
- Class - 1
Work w/o a permit.noted:at rear yard(exp#3)erected,a combustible structure approx;15'x19'x10'high complete with a roof with 4 split a/c uniton top with new electric.no details provided for anchors & no structur
Jul 26, 2019 · Penalty $2,500
Active - Class - 1
Occupancy contrary to that allowed by c of o and dob records. flooringbreeched w/ stairs installed at 1st story apt 1 leading down to cellar. illegal rooming unit created at cellar for sleeping. vacate warrante
Dec 12, 2018 · Penalty $2,500
Active - Class - 2
Failure to maintain adequate housekeeping per section requirements. noted: at the time of inspection, observed excessive construction debris throughout 1st floor. debris scattered throughout is a tripping hazar
May 2, 2018 · Penalty $625
Resolve - Class - 1
Filed a certificate,form,application etc,containing a material false statements. noted: at the time of inspection,observed under job app#321793742 which was issued on 2-22-18. the owner/representative made plac
May 2, 2018 · Penalty $2,500
Resolve - Class - 2
Failure to provide approved/accepted construction documents at jobsite at the time of inspection. noted: at the time of inspection observed job app#304793742 5-2-18 in progress on 1st & 2nd floors. no approved
May 2, 2018 · Penalty $250
Resolve - Class - 1
Wokr w/o a permit. noted: at the time of inspection,observed newly installed copper water tubing & pvc waste & vent;cast iron waste piping throughout 1st fl & cellar level. no permits approved for plumbing work
May 2, 2018 · Penalty $625
Active - Class - 2
Unapproved unsafe unsuitable electrical equipment. devices apparatus appliances materials or wiring in use. defective electrical wiring andfixture in 1st floor hallway ceiling. rmdy: comply with ec code.obtain
Mar 12, 2018
Resolve - Class - 1
Unapproved unsafe unsuitable electrical equipment devices apparatus appliances materials or wiring in use. defective electrical wiring on 3rd fl hallway bare wire from 3rd fl apt to hallway electrical fixture.
Jan 19, 2018 · Penalty $1,600
Resolve - Class - 2
Electrical work w/o permit. removed of electrical wiring in 1st fl apt & in basement. no application on file for electrical wiring removed. remedy: obtain permit.
Jan 19, 2018 · Penalty $400
Resolve
Complaints
- Electric
Power outage
Jun 15, 2026 · Apt 3
Close - General
Cooking gas
Jun 15, 2026 · Apt 3
Close - Appliance
Electric/gas range
May 21, 2026 · Apt 3
Close - Plumbing
Water supply
May 21, 2026 · Apt 3
Close - Plumbing
Water supply
May 1, 2026 · Apt WHOLEB
Close - Plumbing
Water supply
Apr 29, 2026 · Apt 1FLOOR
Close - Plumbing
Water supply
Apr 27, 2026 · Apt 1STFLO
Close - Plumbing
Water supply
Apr 27, 2026 · Apt 3
Close - Plumbing
Water supply
Apr 26, 2026 · Apt 2
Close - Plumbing
Water supply
Apr 26, 2026 · Apt BLDG
Close
Show 40 more ↓
- General
Bell/buzzer/intercom
Mar 25, 2026 · Apt APT2
Close - Plumbing
Toilet
Jan 5, 2026 · Apt 2
Close - Heat/hot water
Entire building
Jan 2, 2026 · Apt BLDG
Close - General
Janitor/super
Jan 2, 2026 · Apt 12
Close - General
Cooking gas
Jan 2, 2026 · Apt 2
Close - General
Cooking gas
Jan 2, 2026 · Apt 2
Close - Electric
No lighting
Jan 2, 2026 · Apt 2
Close - General
Bell/buzzer/intercom
Dec 30, 2025 · Apt 2
Close - Flooring/stairs
Floor
Dec 30, 2025 · Apt FIRSTF
Close - Water leak
Slow leak
Dec 30, 2025 · Apt FIRSTF
Close - Heat/hot water
Apartment only
Dec 30, 2025 · Apt FIRSTF
Close - Heat/hot water
Apartment only
Dec 15, 2025 · Apt 1STFLO
Close - Flooring/stairs
Floor
Dec 15, 2025 · Apt 1STFLO
Close - Electric
Power outage
Dec 15, 2025 · Apt 1STFLO
Close - Water leak
Slow leak
Dec 15, 2025 · Apt 1STFLO
Close - Unsanitary condition
Mold
Dec 15, 2025 · Apt 1STFLO
Close - Heat/hot water
Entire building
Dec 10, 2025 · Apt BLDG
Close - Electric
Power outage
Dec 8, 2025 · Apt 1STFL
Close - Heat/hot water
Apartment only
Dec 8, 2025 · Apt 1STFL
Close - Electric
Outlet/switch
Dec 1, 2025 · Apt 1FL
Close - Appliance
Electric/gas range
Dec 1, 2025 · Apt 1FL
Close - Plumbing
Toilet
Dec 1, 2025 · Apt 1FL
Close - Electric
Power outage
Nov 24, 2025 · Apt 1A
Close - General
Janitor/super
Aug 13, 2025 · Apt 2
Close - Plumbing
Toilet
Aug 13, 2025 · Apt 2
Close - Electric
Power outage
Aug 13, 2025 · Apt 2
Close - General
Cooking gas
Aug 13, 2025 · Apt 2
Close - Paint/plaster
Ceiling
Jul 31, 2025 · Apt 3
Close - Water leak
Heavy flow
Jul 31, 2025 · Apt 3
Close - Water leak
Slow leak
Jun 24, 2025 · Apt 2
Close - Paint/plaster
Ceiling
Dec 24, 2024 · Apt 1A
Close - Flooring/stairs
Floor
Dec 24, 2024 · Apt 1A
Close - Unsanitary condition
Mold
Dec 24, 2024 · Apt 1A
Close - Water leak
Heavy flow
Dec 24, 2024 · Apt 1A
Close - General
Cooking gas
Dec 24, 2024 · Apt 1A
Close - Heat/hot water
Apartment only
Dec 24, 2024 · Apt 1A
Close - Water leak
Slow leak
Jul 18, 2024 · Apt 1A
Close - Water leak
Heavy flow
Jul 18, 2024 · Apt 1A
Close - Paint/plaster
Ceiling
Jul 18, 2024 · Apt 1A
Close - Water leak
Heavy flow
Apr 2, 2024 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1930
- Floors
- 3
- Residential units
- 2
- Building area
- 3,249 ft²
- Lot area
- 1,520 ft²
- Zoning
- R6
- Community board
- 317
- Council district
- 45
- Block / lot
- 4930 / 52
- Assessed value
- $63,780
- Landmark / historic district
- No
HPD registration #357252, last renewed Dec 3, 2025.
Questions about 1715 Nostrand Avenue
Who owns 1715 Nostrand Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Jg Reo LLC.
Does 1715 Nostrand Avenue have violations?
Yes. NYC HPD has recorded 250 housing violations at this property.
Is 1715 Nostrand Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1715 Nostrand Avenue built?
City records list 1930 as the year it was built.
How many apartments are in 1715 Nostrand Avenue?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.