297 East 38 Street
Brooklyn, NY 11203BBL 3-04892-0045Map
Owner of record: Diop, Papa Mamour
297 East 38 Street is a two-family home built in 1920 in Brooklyn, 11203. It has 2 residential units across 2 floors. The owner of record is Diop, Papa Mamour. HPD has recorded 29 housing violations here, most recently on August 10, 2004. 29 of the 29 most recent violations are still open.
- HPD violations
- 29
- DOB violations
- 2
- ECB violations
- 0
- HPD complaints
- 14
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 29
- CImmediately hazardous
Abate the nuisance consisting of cascading water leak ceiling bathroom 1st story apt #1 er-1
Aug 10, 2004
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling bathroom 1st story apt #1 er-1
Aug 10, 2004
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub bathroom,2nd story apt
Apr 8, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective shower head tub bathroom 1 story apt 1
Apr 8, 2004
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles bathroom, 2nd story apt 2
Apr 8, 2004
Open — Nov sent out - BHazardous
Replace with new the missing ceramic wall tiles bathroom, 2nd story apt 2
Apr 8, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls south, center and southwest room, 2nd story apt 2
Apr 8, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective radiator southwest room, 2nd story apt 2
Apr 8, 2004
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household articles, 2nd story public hall
Apr 8, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective connection water supply line water closet bathroom, 2nd story apt 2
Apr 8, 2004
Open — Nov sent out
Show 19 more ↓
- CImmediately hazardous
Provide adequate supply of hot water for the fixtures at kitchen and bathroom, 1st story
Apr 8, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling throughout, 1st story apt 1
Apr 8, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective cabinet sink kitchen, 1st story apt 1
Apr 8, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of concealed water leak ceiling kitchen, 1st story apt 1
Apr 8, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice and roaches , 1st story apt 1
Apr 8, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of concealed water leak ceiling bathroom 1 story. apt 1
Apr 8, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling bathroom 1 story apt 1
Apr 8, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of concealed water leaks ceilings kitchen rear and rear south room 1 story. apt 1
Apr 8, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceilings kitchenn rear and rear south room 1 story apt 1
Apr 8, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective light fixtures ceilings kitchen rear and bathroom 1 story. apt. 1.
Apr 8, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of rusted rotted metal cabinet kitchen sink 1 story. apt 1
Apr 8, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective connection wasteline pipe under kitchen sink 1 story apt 1
Apr 8, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective rear entrance door to apt . and door to rear yard 1 story apt 1
Apr 8, 2004
Open — Nov sent out - ANon-hazardous
Refit entrance door to 1st story apt #1
Apr 8, 2004
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceilings thru/out apt 1. story. apt. 1
Apr 8, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective wall light switch bathroom, 2nd story apt 2
Apr 8, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of plywood sealed window bathroom, 2nd story apt 2
Apr 8, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of concealed water leak ceiling kitchen and east room 1st story apt #1
Apr 8, 2004
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures 1st story apt 1, kitchen and bathroom
Apr 8, 2004
Open — Nov sent out
DOB building violations · 2
- Construction other optional
Work without a permit: atoi, full hght walls & partitions are installed in the cellar, subdividing & giving rise to a residential kitchen with gas stove & sink. a 3 pc bathrm & 2 rooms that can be used as bedrms. no work permit/s or approvals on file with the nyc dept. of buildings for this installation.
May 18, 2023
Dob violation - dismissed - Construction other optional
Residence convrtd mntained or occupied as a dwllng for more than the legally apprvd number of families athrized by the official rcrds: atoi, full hgt walls & partitions instlld in the cellar subdividing & giving rise to a class (a) aprtmnt w/ a resdntial kitchn w/ gas stove. a 3 pc bathrm, 2 rooms that can be used for bedrms & a lvng rm area.
May 18, 2023
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Heat/hot water
Apartment only
Nov 16, 2021 · Apt SECOND
Close - Water leak
Heavy flow
Nov 26, 2018 · Apt BSTM
Close - Heating
Heat related
Mar 16, 2007 · Apt 1FL
Close - Plumbing
Water-leaks
Mar 16, 2007 · Apt 1FL
Close - Electric
Lighting
Mar 16, 2007 · Apt 1FL
Close - General
Doors
Mar 16, 2007 · Apt 1FL
Close - General
Windows
Mar 16, 2007 · Apt 1FL
Close - Nonconst
Vermin
Mar 16, 2007 · Apt 1FL
Close - Plumbing
Radiator
Mar 16, 2007 · Apt 1FL
Close - Heating
Heat related
Jan 28, 2007 · Apt 1FL
Close
Show 4 more ↓
- Heating
Heat related
Jan 12, 2007 · Apt 1FL
Close - General
Windows
Jan 12, 2007 · Apt 1FL
Close - General
Doors
Jan 12, 2007 · Apt 1FL
Close - Plumbing
Water-leaks
Jan 12, 2007 · Apt 1FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B9)
- Year built
- 1920
- Floors
- 2
- Residential units
- 2
- Building area
- 1,848 ft²
- Lot area
- 2,000 ft²
- Zoning
- R5
- Community board
- 317
- Council district
- 40
- Block / lot
- 4892 / 45
- Assessed value
- $47,460
- Landmark / historic district
- No
Questions about 297 East 38 Street
Who owns 297 East 38 Street?
The owner of record in NYC Department of City Planning PLUTO data is Diop, Papa Mamour.
Does 297 East 38 Street have violations?
Yes. NYC HPD has recorded 29 housing violations at this property.
Is 297 East 38 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 297 East 38 Street built?
City records list 1920 as the year it was built.
How many apartments are in 297 East 38 Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.