roofy

146 East 40 Street

Brooklyn, NY 11203BBL 3-04876-0023Map

Owner of record: Ismail, Mohammed

146 East 40 Street is an one-family home built in 1920 in Brooklyn, 11203. It has 1 residential unit across 2 floors. The owner of record is Ismail, Mohammed. HPD has recorded 76 housing violations here, most recently on October 5, 2024. 35 of the 50 most recent violations are still open.

HPD violations
76
DOB violations
1
ECB violations
2
HPD complaints
65

What to know

Concern
2 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Oct 5, 2024

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 76

  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 12th room from east, the private hallway located at apt pvt, 1st story, 1st apartment from south at west

    Oct 5, 2024 · Apt PVT

    Open — Nov sent out
  • A

    Repair leaky water closet flush pipe connection in the bathroom located at apt pvt, 1st story, 1st apartment from south at west

    Oct 5, 2024 · Apt PVT

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electrical outlet at east wall in the kitchen located at apt pvt, 1st story, 1st apartment from south at west

    Oct 5, 2024 · Apt PVT

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective ceiling light fixture in the 22nd room from east located at apt pvt upper level, 1st story, 1st apartment from south at west

    Oct 5, 2024 · Apt PVT

    Open — Nov sent out
  • B

    Provide adequate supply of cold water for the fixtures at sink in the bathroom located at apt pvt, 1st story, 1st apartment from south at west

    Oct 5, 2024 · Apt PVT

    Open — Nov sent out
  • B

    Provide adequate supply of hot water for the fixtures at sink in the bathroom located at apt pvt, 1st story, 1st apartment from south at west

    Oct 5, 2024 · Apt PVT

    Open — Nov sent out
  • B

    Provide a safe and adequate supply of electric service to the fixtures ceiling light fixture and electrical outlets in the 24th room from east located at apt pvt upper level, 1st story, 1st apartment from south at west

    Oct 5, 2024 · Apt PVT

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective ceiling light fixture in the private hallway located at apt pvt upper level, 1st story, 1st apartment from south at west

    Oct 5, 2024 · Apt PVT

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 11th room from east located at apt pvt, 1st story, 1st apartment from south at west

    Oct 5, 2024 · Apt PVT

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Jan 11, 2024

    Open — Info nov sent out
Show 40 more ↓
  • C

    Provide hot water at all hot water fixtures in the 2nd bathroom from east located at apt 1stfl, 1st story, 1st apartment from south at west

    Jan 10, 2024 · Apt 1STFL

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt pvt, 1st story, 1st apartment from south at west

    Dec 10, 2023 · Apt PVT

    Closed — Violation closed
  • B

    Provide a safe and adequate supply of electric service to the fixtures at ceiling in the private hallway located at apt privat upper level, 1st story, 1st apartment from south at west

    Aug 24, 2023 · Apt PRIVAT

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective exposed wires light fixture at ceiling in the kitchen located at apt privat lower level, 1st story, 1st apartment from south at west

    Aug 24, 2023 · Apt PRIVAT

    Open — Nov sent out
  • B

    Replace with new the missing light fixture at ceiling in the kitchen located at apt privat lower level, 1st story, 1st apartment from south at west

    Aug 24, 2023 · Apt PRIVAT

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt privat lower level, 1st story, 1st apartment from south at west

    Aug 24, 2023 · Apt PRIVAT

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt privat, 1st story, 1st apartment from south at west

    Aug 24, 2023 · Apt PRIVAT

    Open — Nov sent out
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt privat, 1st story, 1st apartment from south at west

    Aug 24, 2023 · Apt PRIVAT

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt privat upper level, 1st story, 1st apartment from south at west

    Aug 24, 2023 · Apt PRIVAT

    Open — Nov sent out
  • C

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt privat upper level, 1st story, 1st apartment from south at west

    Aug 24, 2023 · Apt PRIVAT

    Closed — Violation closed
  • B

    Provide a safe and adequate supply of electric service to the fixtures at ceiling in the bathroom located at apt privat upper level, 1st story, 1st apartment from south at west

    Aug 24, 2023 · Apt PRIVAT

    Open — Nov sent out
  • B

    Provide a safe and adequate supply of electric service to the fixtures at ceiling in the 4th room from east located at apt privat upper level, 1st story, 1st apartment from south at west

    Aug 24, 2023 · Apt PRIVAT

    Open — Nov sent out
  • B

    Provide a safe and adequate supply of electric service to the fixtures at ceiling in the 2nd room from east located at apt privat upper level, 1st story, 1st apartment from south at west

    Aug 24, 2023 · Apt PRIVAT

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt privat, 1st story, 1st apartment from south at west

    Aug 24, 2023 · Apt PRIVAT

    Closed — Violation closed
  • C

    Abate the nuisance consisting of uncapped gas supply line for range at north wall in the kitchen located at apt privat, 1st story, 1st apartment from south at west

    Aug 24, 2023 · Apt PRIVAT

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in boiler room at cellar

    Aug 24, 2023

    Open — Nov sent out
  • B

    Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections at washbasin, watercloset, shower stall at cellar

    Aug 24, 2023

    Open — Nov sent out
  • B

    Abate the nuisance consisting of exposed electrical cords running across floor at lower level up private stairs to upper level rooms from outlet at north wall in the 2nd room from east located at apt privat lower level, 1st story, 1st apartment from south at west

    Aug 24, 2023 · Apt PRIVAT

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 2nd room from east located at apt privat lower level, 1st story, 1st apartment from south at west

    Aug 24, 2023 · Apt PRIVAT

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt privat lower level, 1st story, 1st apartment from south at west

    Aug 24, 2023 · Apt PRIVAT

    Closed — Violation closed
  • B

    Abate the nuisance consisting of exposed electrical wires at ceiling in boiler room at cellar

    Aug 24, 2023

    Open — Nov sent out
  • C

    § 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1, 1st story, 1st apartment from south at west

    Mar 14, 2023 · Apt 1

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from south at west

    Mar 14, 2023 · Apt 1

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 21st private hallway located at apt 1, 1st story, 1st apartment from south at west

    Feb 12, 2023 · Apt 1

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the bathroom located at apt 1, 1st story, 1st apartment from south at west

    Feb 12, 2023 · Apt 1

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, west wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 22nd room from east located at apt 1, 1st story, 1st apartment from south at west

    Feb 12, 2023 · Apt 1

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from south at west wall in the 21st room from east located at apt 1, 1st story, 1st apartment from south at west

    Feb 12, 2023 · Apt 1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from west at north wall in the 22nd room from east located at apt 1, 1st story, 1st apartment from south at west

    Feb 12, 2023 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, west wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 2nd room from east located at apt 1, 1st story, 1st apartment from south at west

    Feb 12, 2023 · Apt 1

    Closed — Violation closed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1, 1st story, 1st apartment from south at west

    Feb 12, 2023 · Apt 1

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) baseboard at west wall in the 24th room from east located at apt 1, 1st story, 1st apartment from south at west

    Feb 12, 2023 · Apt 1

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, north wall, south wall, east wall, west wall, 1st window frame from north at east wall, 2nd window frame from north at east wall, 3rd window frame from north at east wall in the 21st room from east located at apt 1, 1st story, 1st apartment from south at west

    Feb 12, 2023 · Apt 1

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 3rd room from east located at apt 1, 1st story, 1st apartment from south at west

    Feb 12, 2023 · Apt 1

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the north wall, south wall, west wall in the kitchen located at apt 1, 1st story, 1st apartment from south at west

    Feb 12, 2023 · Apt 1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st window frame from south at west wall in the kitchen located at apt 1, 1st story, 1st apartment from south at west

    Feb 12, 2023 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the north wall, ceiling in the foyer located at apt 1, 1st story, 1st apartment from south at west

    Feb 12, 2023 · Apt 1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from west at north wall door frame in the foyer located at apt 1, 1st story, 1st apartment from south at west

    Feb 12, 2023 · Apt 1

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the bathroom located at apt 1, 1st story, 1st apartment from south at west

    Feb 12, 2023 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the south wall, west wall, ceiling in the 21st private hallway located at apt 1, 1st story, 1st apartment from south at west

    Feb 12, 2023 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling, west wall, east wall in the 3rd room from east located at apt 1, 1st story, 1st apartment from south at west

    Feb 12, 2023 · Apt 1

    Open — Nov sent out

DOB building violations · 1

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 26, 2014

    Dob violation - dismissed

ECB violations · 2

  • Class - 2

    Occupancy contrary to that allowed by c of o and/or the department of buildings records. partition erected at cellar creating a bathroom at boiler room. bathroom complete with wash besin, water closet and showe

    Aug 23, 2023 · Penalty $6,250

    Active
  • Class - 1

    Failure to maintain bldg walls or appurtenances. note: at front of bldg brick stairs are cracked, missing bricks and mortar joints, sagging,leaning and creating an unsafe condition and masonry facade under 1st

    Dec 8, 2013

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Feb 19, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 13, 2025 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Jan 27, 2025 · Apt BLDG

    Close
  • Water leak

    Slow leak

    Oct 1, 2024 · Apt PVT

    Close
  • Electric

    Outlet/switch

    Oct 1, 2024 · Apt PVT

    Close
  • Paint/plaster

    Ceiling

    Oct 1, 2024 · Apt PVT

    Close
  • Plumbing

    Basin/sink

    Oct 1, 2024 · Apt PVT

    Close
  • Plumbing

    Basin/sink

    Oct 1, 2024 · Apt PVT

    Close
  • Heat/hot water

    Entire building

    Mar 25, 2024 · Apt PRIVAT

    Close
  • Heat/hot water

    Apartment only

    Jan 9, 2024 · Apt 1STFL

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Dec 11, 2023 · Apt TENANT

    Close
  • Heat/hot water

    Entire building

    Dec 8, 2023 · Apt PVT

    Close
  • Electric

    Wiring

    Aug 22, 2023 · Apt HOUSE

    Close
  • Water leak

    Heavy flow

    Aug 22, 2023 · Apt HOUSE

    Close
  • Electric

    Wiring

    Aug 14, 2023 · Apt PRIVAT

    Close
  • Water leak

    Slow leak

    Aug 10, 2023 · Apt BASEME

    Close
  • Appliance

    Refrigerator

    Jul 26, 2023 · Apt PRIVAT

    Close
  • Water leak

    Slow leak

    Jul 26, 2023 · Apt PRIVAT

    Close
  • Appliance

    Electric/gas range

    Jul 26, 2023 · Apt PRIVAT

    Close
  • Heat/hot water

    Entire building

    Mar 13, 2023 · Apt PRIVAT

    Close
  • Heat/hot water

    Entire building

    Mar 9, 2023 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Mar 2, 2023 · Apt ENTIRE

    Close
  • General

    Cooking gas

    Feb 28, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 28, 2023 · Apt BLDG

    Close
  • Flooring/stairs

    Floor

    Feb 7, 2023 · Apt 1

    Close
  • Appliance

    Electric/gas range

    Feb 7, 2023 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Feb 7, 2023 · Apt 1

    Close
  • Appliance

    Refrigerator

    Feb 7, 2023 · Apt 1

    Close
  • Electric

    Power outage

    Feb 7, 2023 · Apt 1

    Close
  • General

    Cooking gas

    Dec 28, 2022 · Apt HOUSE

    Close
  • Heat/hot water

    Entire building

    Dec 28, 2022 · Apt HOUSE

    Close
  • Outside building

    Skylight

    Dec 22, 2022 · Apt PVT

    Close
  • Door/window

    Window frame

    Dec 22, 2022 · Apt PVT

    Close
  • Flooring/stairs

    Stairs

    Dec 22, 2022 · Apt PVT

    Close
  • Flooring/stairs

    Floor

    Dec 22, 2022 · Apt PVT

    Close
  • General

    Bell/buzzer/intercom

    Dec 22, 2022 · Apt PVT

    Close
  • Plumbing

    Toilet

    Dec 22, 2022 · Apt PVT

    Close
  • Electric

    Outlet/switch

    Dec 22, 2022 · Apt PVT

    Close
  • Unsanitary condition

    Pests

    Dec 22, 2022 · Apt PVT

    Close
  • Unsanitary condition

    Pests

    Dec 22, 2022 · Apt PVT

    Close
  • Unsanitary condition

    Pests

    Dec 8, 2022 · Apt PVT

    Close
  • Unsanitary condition

    Pests

    Dec 8, 2022 · Apt PVT

    Close
  • Paint/plaster

    Wall

    Dec 8, 2022 · Apt PVT

    Close
  • Plumbing

    Toilet

    Dec 8, 2022 · Apt PVT

    Close
  • Electric

    Outlet/switch

    Dec 8, 2022 · Apt PVT

    Close
  • Door/window

    Door

    Dec 8, 2022 · Apt PVT

    Close
  • Flooring/stairs

    Stairs

    Dec 8, 2022 · Apt PVT

    Close
  • General

    Bell/buzzer/intercom

    Dec 8, 2022 · Apt PVT

    Close
  • Door/window

    Window frame

    Dec 8, 2022 · Apt PVT

    Close
  • Door/window

    Door

    Dec 2, 2022 · Apt HOUSE

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
One-family home (A1)
Year built
1920
Floors
2
Residential units
1
Building area
1,344 ft²
Lot area
2,000 ft²
Zoning
R5
Community board
317
Council district
40
Block / lot
4876 / 23
Assessed value
$46,620
Landmark / historic district
No

Questions about 146 East 40 Street

Who owns 146 East 40 Street?

The owner of record in NYC Department of City Planning PLUTO data is Ismail, Mohammed.

Does 146 East 40 Street have violations?

Yes. NYC HPD has recorded 76 housing violations at this property.

Is 146 East 40 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 146 East 40 Street built?

City records list 1920 as the year it was built.

How many apartments are in 146 East 40 Street?

It has 1 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.