126 East 35 Street
Brooklyn, NY 11203BBL 3-04871-0015Map
Owner of record: 126 E 35 St LLC
126 East 35 Street is an one-family home built in 1920 in Brooklyn, 11203. It has 1 residential unit across 2 floors. The owner of record is 126 E 35 St LLC. HPD has recorded 79 housing violations here, most recently on December 4, 2022. 44 of the 50 most recent violations are still open.
- HPD violations
- 79
- DOB violations
- 1
- ECB violations
- 1
- HPD complaints
- 133
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 79
- CImmediately hazardous
Abate the nuisance consisting of hotwater exceeding the maximum allowable temperature of 130 degrees in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Dec 4, 2022 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Dec 4, 2022 · Apt 1
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling apprx 5 square feet at vestibule at public hall, 1st story original violation 15392279 issued 27-sep-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Sep 27, 2022
Open — First no access to re- inspect violation - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling apprx 5 square feet at vestibule at public hall, 1st story
Sep 27, 2022
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling at vestibule at public hall, 1st story
Sep 27, 2022
Open — Certification postponment denied - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling. at lower level in the 2nd room from east located at apt 1fl, 1st story, 1st apartment from south at west
Sep 27, 2022 · Apt 1FL
Open — Certification postponment denied - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and west wall at upper level in the 2nd room from east located at apt 1fl, 1st story, 1st apartment from south at west
Sep 27, 2022 · Apt 1FL
Open — Certification postponment denied - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1fl, 1st story, 1st apartment from south at west
Sep 27, 2022 · Apt 1FL
Open — Certification postponment denied - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1fl, 1st story, 1st apartment from south at west
Sep 27, 2022 · Apt 1FL
Open — Certification postponment denied - ANon-hazardous
Properly repair with similar material the broken or defective two wood doors at base cabinet at south wall in the kitchen located at apt 1fl, 1st story, 1st apartment from south at west
Sep 27, 2022 · Apt 1FL
Open — Certification postponment granted
Show 40 more ↓
- ANon-hazardous
Properly repair with similar material the broken or defective three wood doors at sink base cabinet in the kitchen located at apt 1fl, 1st story, 1st apartment from south at west
Sep 27, 2022 · Apt 1FL
Open — Certification postponment granted - BHazardous
Repair the roof so that it will not leak over ceiling at upper level in the 1st bathroom located at apt 1fl, 1st story, 1st apartment from south at west
Sep 27, 2022 · Apt 1FL
Open — Certification postponment denied - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling apprx 10 square feet at upper level in the 1st bathroom located at apt 1fl, 1st story, 1st apartment from south at west
Sep 27, 2022 · Apt 1FL
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling at upper level in the 1st bathroom located at apt 1fl, 1st story, 1st apartment from south at west
Sep 27, 2022 · Apt 1FL
Open — Certification postponment granted - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the 1st bathroom located at apt 1fl, 1st story, 1st apartment from south at west
Sep 27, 2022 · Apt 1FL
Open — Certification postponment denied - CImmediately hazardous
Properly repair with similar material the broken or defective wood tread, 3rd from bottom at intermediat landing of stairs leading to upper level in the 1st private hallway located at apt 1fl, 1st story, 1st apartment from south at west
Sep 27, 2022 · Apt 1FL
Open — Certification postponment denied - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the kitchen located at apt 1fl, 1st story, 1st apartment from south at west
Sep 27, 2022 · Apt 1FL
Open — Certification postponment denied - CImmediately hazardous
Replace with new the broken or defective glass pane at lower sash, 1st window from east at south wall at lower level in the 2nd room from east located at apt 1fl, 1st story, 1st apartment from south at west
Sep 27, 2022 · Apt 1FL
Open — Certification postponment denied - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor at lower level in the 2nd room from east located at apt 1fl, 1st story, 1st apartment from south at west
Sep 27, 2022 · Apt 1FL
Open — Certification postponment denied - BHazardous
Replace with new the broken or defective base cabinet at sink in the kitchen located at apt floor2, 2nd story, 1st apartment from east at south
Jun 27, 2022 · Apt FLOOR2
Open — Certification postponment denied - BHazardous
Replace with new the broken or defective wsah basin cabinet in the bathroom located at apt floor2, 2nd story, 1st apartment from east at south
Jun 27, 2022 · Apt FLOOR2
Open — Certification postponment denied - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and all walls in the 1st room from east located at apt floor2, 2nd story, 1st apartment from east at south
Jun 27, 2022 · Apt FLOOR2
Open — Certification postponment denied - BHazardous
Properly repair with similar material the broken or defective wood tread 5 up from bottom at interior stairs from 1s story to 2nd story located at apt floor2, 2nd story, 1st apartment from east at south
Jun 27, 2022 · Apt FLOOR2
Open — Certification postponment denied - BHazardous
Trace and repair the source and abate the visible mold condition... approx 10 square at ceiling bathroom in the bathroom located at apt floor2, 2nd story, 1st apartment from east at south
Jun 27, 2022 · Apt FLOOR2
Open — First no access to re- inspect violation - BHazardous
Trace and repair the source and abate the visible mold condition... approx 10 sq ft at ceiling in the entrance located at apt pvt, 1st story, 1st apartment from south at west
Jun 27, 2022 · Apt PVT
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and all walls in the entrance located at apt pvt, 1st story, 1st apartment from south at west
Jun 27, 2022 · Apt PVT
Open — Certification postponment denied - BHazardous
Properly repair with similar material the broken or defective ceramil wall tiles around bathtub in the bathroom located at apt floor2, 2nd story, 1st apartment from east at south
Jun 27, 2022 · Apt FLOOR2
Open — Certification postponment denied - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles throughout in the bathroom located at apt floor2, 2nd story, 1st apartment from east at south
Jun 27, 2022 · Apt FLOOR2
Open — Certification postponment denied - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceili g and all walls in the bathroom located at apt floor2, 2nd story, 1st apartment from east at south
Jun 27, 2022 · Apt FLOOR2
Open — Certification postponment denied - BHazardous
Repair the roof so that it will not leak at ceiling in the bathroom located at apt floor2, 2nd story, 1st apartment from east at south
Jun 27, 2022 · Apt FLOOR2
Open — Certification postponment denied - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and all walls in the 1st room from north at west located at apt floor2, 2nd story, 1st apartment from east at south
Jun 27, 2022 · Apt FLOOR2
Open — Certification postponment denied - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak conseal water leak at ceiling in the 1st room from north at west located at apt floor2, 2nd story, 1st apartment from east at south
Jun 27, 2022 · Apt FLOOR2
Open — Certification postponment denied - BHazardous
Properly repair with similar material the broken or defective wood floor thriughout in the 1st room from north at west located at apt floor2, 2nd story, 1st apartment from east at south
Jun 27, 2022 · Apt FLOOR2
Open — Certification postponment denied - BHazardous
Replace with new the broken or defective wall cabinet at east in the kitchen located at apt floor2, 2nd story, 1st apartment from east at south
Jun 27, 2022 · Apt FLOOR2
Open — Certification postponment denied - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles throughout in the kitchen located at apt floor2, 2nd story, 1st apartment from east at south
Jun 27, 2022 · Apt FLOOR2
Open — Certification postponment denied - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and all walls in the kitchen located at apt floor2, 2nd story, 1st apartment from east at south
Jun 27, 2022 · Apt FLOOR2
Open — Certification postponment denied - BHazardous
Properly repair the broken or defective electricsl light fixture at ceiling in the kitchen located at apt floor2, 2nd story, 1st apartment from east at south
Jun 27, 2022 · Apt FLOOR2
Open — Certification postponment denied - CImmediately hazardous
Abate the nuisance consisting of hot water exceeding the mamium temperatue of 130 at all hot water bathroom and kitchen sink in the entire apartment located at apt floor2, 2nd story, 1st apartment from east at south
Jun 27, 2022 · Apt FLOOR2
Open — Certification postponment denied - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 3sq.ft at ceiling in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west original violation 14970306 issued 06-mar-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Mar 6, 2022 · Apt 2
Open — First no access to re- inspect violation - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 3sq.ft at ceiling in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west
Mar 6, 2022 · Apt 2
Closed — Violation closed - BHazardous
Abate the infestation consisting of roaches in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Mar 6, 2022 · Apt 2
Open — Certification postponment denied - CImmediately hazardous
Abate the nuisance consisting of hot water temperature exceeding the maximum temperature of 130 degrees fahrenheit at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Mar 6, 2022 · Apt 2
Open — Certification postponment denied - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Mar 6, 2022 · Apt 2
Open — Certification postponment denied - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Mar 6, 2022 · Apt 2
Open — Certification postponment denied - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the front yard
Jan 2, 2021
Open — Certification postponment denied - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 30, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jan 8, 2018
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from east located at apt 1, 1st story
Jan 22, 2010 · Apt 1
Open — Certification postponment denied - BHazardous
Properly repair the broken or defective wall cabinets in the kitchen located at apt 1, 1st story
Jan 22, 2010 · Apt 1
Open — Certification postponment denied - BHazardous
Properly repair the broken or defective bell-buzzer in the entire apartment located at apt 1, 1st story
Jan 22, 2010 · Apt 1
Open — Certification postponment denied
DOB building violations · 1
- Plumbing none
Vacate order issued due to unsafe condition observed in cellar boiler and gas meter area , i observed boiler installed with flex and no vent pipe installed on tankless water.
Dec 7, 2022
Dob violation - active
ECB violations · 1
- Class - 2
. respondent issued rca on 12/07/22 . found inoperable pennco boiler model unknown due to missing rating plate. falling to provide access to determine if the condition was corrected., maintain boiler; comply wi
Mar 14, 2024
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Dec 7, 2022 · Apt BLDG
Close - Electric
No lighting
Dec 6, 2022 · Apt 2NDFLO
Close - Paint/plaster
Ceiling
Dec 6, 2022 · Apt 2NDFLO
Close - General
Cabinet
Dec 6, 2022 · Apt 2NDFLO
Close - Flooring/stairs
Floor
Dec 6, 2022 · Apt 2NDFLO
Close - Flooring/stairs
Floor
Dec 6, 2022 · Apt 2NDFLO
Close - Water leak
Heavy flow
Dec 6, 2022 · Apt 2NDFLO
Close - Heat/hot water
Entire building
Dec 1, 2022 · Apt 2NDFLO
Close - Heat/hot water
Entire building
Nov 19, 2022 · Apt 2NDFLO
Close - Heat/hot water
Entire building
Oct 28, 2022 · Apt 2
Close
Show 40 more ↓
- Electric
No lighting
Sep 24, 2022 · Apt 2FLOOR
Close - Unsanitary condition
Mold
Sep 24, 2022 · Apt 2FLOOR
Close - Water leak
Slow leak
Sep 24, 2022 · Apt 2FLOOR
Close - Flooring/stairs
Floor
Sep 24, 2022 · Apt 2FLOOR
Close - Door/window
Window frame
Sep 24, 2022 · Apt 2FLOOR
Close - Safety
Smoke detector
Aug 31, 2022 · Apt 2FLOOR
Close - Safety
Carbon monoxide detector
Aug 31, 2022 · Apt 2FLOOR
Close - Water leak
Heavy flow
Aug 31, 2022 · Apt 2FLOOR
Close - Unsanitary condition
Pests
Aug 31, 2022 · Apt 2FLOOR
Close - Door/window
Window frame
Aug 31, 2022 · Apt 2FLOOR
Close - Unsanitary condition
Mold
Aug 31, 2022 · Apt 2FLOOR
Close - Flooring/stairs
Floor
Aug 22, 2022 · Apt 2
Close - Electric
Lighting
Aug 22, 2022 · Apt 2
Close - Flooring/stairs
Floor
Aug 22, 2022 · Apt 2
Close - Unsanitary condition
Mold
Aug 22, 2022 · Apt 2
Close - Flooring/stairs
Floor
Jun 27, 2022 · Apt PVT
Close - Water leak
Slow leak
Jun 27, 2022 · Apt PVT
Close - Unsanitary condition
Mold
Jun 27, 2022 · Apt PVT
Close - Door/window
Window pane
Jun 27, 2022 · Apt PVT
Close - Water leak
Heavy flow
Jun 14, 2022 · Apt FLOOR2
Close - Flooring/stairs
Floor
Jun 14, 2022 · Apt FLOOR2
Close - Flooring/stairs
Floor
Jun 13, 2022 · Apt 2
Close - Unsanitary condition
Mold
Jun 13, 2022 · Apt 2
Close - Water leak
Slow leak
Jun 13, 2022 · Apt 2
Close - Water leak
Heavy flow
May 1, 2022 · Apt 2FL
Close - Flooring/stairs
Floor
May 1, 2022 · Apt 2FL
Close - Flooring/stairs
Floor
May 1, 2022 · Apt 2FL
Close - Heat/hot water
Entire building
Apr 12, 2022 · Apt 2NDFLO
Close - Heat/hot water
Entire building
Mar 13, 2022 · Apt 2FLOOR
Close - Water leak
Heavy flow
Mar 12, 2022 · Apt 2NDFLO
Close - Flooring/stairs
Floor
Mar 12, 2022 · Apt 2NDFLO
Close - Water leak
Heavy flow
Mar 8, 2022 · Apt 2FL
Close - Flooring/stairs
Floor
Mar 8, 2022 · Apt 2FL
Close - Unsanitary condition
Mold
Mar 8, 2022 · Apt 2FL
Close - Flooring/stairs
Floor
Mar 5, 2022 · Apt 2
Close - Water leak
Heavy flow
Mar 5, 2022 · Apt 2
Close - General
Cabinet
Mar 5, 2022 · Apt 2
Close - Heat/hot water
Entire building
Mar 5, 2022 · Apt 2NDFLO
Close - Water leak
Slow leak
Dec 22, 2020 · Apt PRIVAT
Close - Flooring/stairs
Floor
Dec 22, 2020 · Apt PRIVAT
Close
Sales history
No recorded sales in our data
Building details
- Building type
- One-family home (A1)
- Year built
- 1920
- Floors
- 2
- Residential units
- 1
- Building area
- 1,530 ft²
- Lot area
- 2,002 ft²
- Zoning
- R5
- Community board
- 317
- Council district
- 40
- Block / lot
- 4871 / 15
- Assessed value
- $44,640
- Landmark / historic district
- No
HPD registration #810623, last renewed Jul 29, 2025.
Questions about 126 East 35 Street
Who owns 126 East 35 Street?
The owner of record in NYC Department of City Planning PLUTO data is 126 E 35 St LLC.
Does 126 East 35 Street have violations?
Yes. NYC HPD has recorded 79 housing violations at this property.
Is 126 East 35 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 126 East 35 Street built?
City records list 1920 as the year it was built.
How many apartments are in 126 East 35 Street?
It has 1 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.