roofy

58 East 43 Street

Brooklyn, NY 11203BBL 3-04863-0010Map

Owner of record: Hercules, Martin

58 East 43 Street is a walk-up apartment building built in 1931 in Brooklyn, 11203. It has 4 residential units across 2 floors. The owner of record is Hercules, Martin. HPD has recorded 60 housing violations here, most recently on May 4, 2026. 47 of the 50 most recent violations are still open.

HPD violations
60
DOB violations
0
ECB violations
0
HPD complaints
21

What to know

Concern
16 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 4, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 60

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 4, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective building entrance door is binding with floor , 1st story

    Feb 9, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at vestibule door , 1st story

    Feb 9, 2026

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic tiles at floor in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west

    Feb 9, 2026 · Apt 2R

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 2r, 2nd story, 1st apartment from south at west

    Feb 9, 2026 · Apt 2R

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 18, 2025

    Open — Info nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 1st room from east located at apt 2r, 2nd story, 1st apartment from south at west

    Nov 17, 2025 · Apt 2R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall, 1st door frame from north at east wall in the 4th room from east at north located at apt 2r, 2nd story, 1st apartment from south at west

    Nov 17, 2025 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 2nd story

    Nov 17, 2025

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective light fixture at ceiling at public hall, 1st story

    Nov 17, 2025

    Open — Nov sent out
Show 40 more ↓
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Nov 17, 2025

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Nov 17, 2025

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox at public hall, 1st story

    Nov 17, 2025

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings

    Nov 17, 2025

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door locked at cellar at boiler room

    Nov 17, 2025

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west

    Nov 17, 2025 · Apt 2R

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west

    Nov 17, 2025 · Apt 2R

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from east at south wall in the 4th room from east at north located at apt 2r, 2nd story, 1st apartment from south at west

    Nov 17, 2025 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 2nd window frame from south at west wall, 1st window frame from south at west wall in the 4th room from east at north located at apt 2r, 2nd story, 1st apartment from south at west

    Nov 17, 2025 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from west at north wall door, 1st closet from west at north wall door frame, 2nd closet from west at north wall door, 2nd closet from west at north wall door frame in the foyer located at apt 2r, 2nd story, 1st apartment from south at west

    Nov 17, 2025 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from south at west wall, 1st door frame from south at west wall in the 1st room from east located at apt 2r, 2nd story, 1st apartment from south at west

    Nov 17, 2025 · Apt 2R

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective fire retardant material ceiling at public hall, 2nd story

    Nov 17, 2025

    Closed — Violation closed
  • C

    Repair the roof so that it will not leak over ceiling at public hall, 2nd story

    Nov 17, 2025

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the foyer located at apt 2r, 2nd story, 1st apartment from south at west

    Nov 17, 2025 · Apt 2R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door, 1st window frame from east at south wall in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west

    Nov 17, 2025 · Apt 2R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west

    Nov 17, 2025 · Apt 2R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 4th room from east at south located at apt 2r, 2nd story, 1st apartment from south at west

    Nov 17, 2025 · Apt 2R

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall in the 4th room from east at south located at apt 2r, 2nd story, 1st apartment from south at west

    Nov 17, 2025 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west

    Nov 17, 2025 · Apt 2R

    Open — Nov sent out
  • C

    Provide a safe and adequate supply of electric service to the fixtures at ceiling light fixtures and all wall outlets in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west

    Nov 17, 2025 · Apt 2R

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of hot water exceeding maximum allowable 130 degrees at all fixtures 136 found at kitchen sink in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west

    Nov 17, 2025 · Apt 2R

    Open — Nov sent out
  • C

    Provide an adequate supply of heat for the apartment in the 4th room from east at north located at apt 2r, 2nd story, 1st apartment from south at west

    Nov 17, 2025 · Apt 2R

    Closed — Violation closed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2r, 2nd story, 1st apartment from south at west

    Nov 17, 2025 · Apt 2R

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 9, 2025

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 25, 2024

    Open — Info nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 9, 2024

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 17, 2023

    Open — Info nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 22, 2023

    Open — Nov sent out
  • B

    Replace with new the missing guardrail at stairs below grade at building front , 1st story

    Nov 30, 2022

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story

    Nov 30, 2022

    Open — Nov sent out
  • B

    Replace with new the broken or defective ceramic floor tiles at public hall, 1st story

    Nov 30, 2022

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at vestibule door west wall at public hall, 1st story

    Nov 30, 2022

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at entrance door to building at public hall, 1st story

    Nov 30, 2022

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant materails plaster at ceiling and north wall at public hall, 1st story

    Nov 30, 2022

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 4, 2022

    Open — Info nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 24, 2022

    Open — Info nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 24, 2022

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 8, 2021

    Open — Info nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 8, 2021

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 30, 2019

    Open — Info nov sent out

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Heat/hot water

    Entire building

    Feb 23, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 23, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 16, 2026 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Feb 9, 2026 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Feb 8, 2026 · Apt 2R

    Close
  • General

    Bell/buzzer/intercom

    Feb 8, 2026 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Dec 11, 2025 · Apt 2R

    Close
  • General

    Bell/buzzer/intercom

    Dec 11, 2025 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Dec 10, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Nov 16, 2025 · Apt 2R

    Close
Show 11 more ↓
  • Electric

    Power outage

    Nov 16, 2025 · Apt 2R

    Close
  • Electric

    Power outage

    Nov 16, 2025 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Nov 15, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 14, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Nov 14, 2025 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Nov 12, 2025 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Nov 11, 2025 · Apt 2R

    Close
  • General

    Bell/buzzer/intercom

    Nov 5, 2025 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Nov 4, 2025 · Apt 2R

    Close
  • Electric

    Power outage

    Oct 25, 2025 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Nov 19, 2022 · Apt 1A

    Close

Sales history

DatePriceTypeUnits
Jun 17, 2026$1,100,750Rentals - walkup apartments4

Building details

Building type
Walk-up apartment building (C3)
Year built
1931
Floors
2
Residential units
4
Building area
3,321 ft²
Lot area
3,124 ft²
Zoning
R5
Community board
317
Council district
40
Block / lot
4863 / 10
Assessed value
$261,900
Landmark / historic district
No

HPD registration #350124, last renewed Jan 6, 1998.

Questions about 58 East 43 Street

Who owns 58 East 43 Street?

The owner of record in NYC Department of City Planning PLUTO data is Hercules, Martin.

Does 58 East 43 Street have violations?

Yes. NYC HPD has recorded 60 housing violations at this property.

Is 58 East 43 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 58 East 43 Street built?

City records list 1931 as the year it was built.

How many apartments are in 58 East 43 Street?

It has 4 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.