955 East 49 Street
Brooklyn, NY 11203BBL 3-04784-0057Map
Owner of record: Carr, Randolph D
955 East 49 Street is a two-family home built in 1910 in Brooklyn, 11203. It has 2 residential units across 2 floors. The owner of record is Carr, Randolph D. HPD has recorded 63 housing violations here, most recently on May 27, 2023. 41 of the 50 most recent violations are still open.
- HPD violations
- 63
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 37
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 63
- BHazardous
Properly repair with similar material the broken or defective approximately 30 sq/ft of concrete at the front of the building yard
May 27, 2023
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective upper window sash spring balance at east wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from east at south
May 27, 2023 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective upper window sash spring balance 1st 2nd and 3rd window from south at west in the 4th room from east located at apt 2, 2nd story, 1st apartment from east at south
May 27, 2023 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective unhinged door in the 4th room from east located at apt 2, 2nd story, 1st apartment from east at south
May 27, 2023 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at south, the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Nov 7, 2022 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at north wall in the foyer located at apt 2, 2nd story, 1st apartment from north at east
Nov 7, 2022 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling, south wall in the 4th room from east located at apt 2, 2nd story, 1st apartment from north at east
Nov 7, 2022 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling, south wall, west wall in the 4th room from east located at apt 2, 2nd story, 1st apartment from north at east
Nov 7, 2022 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st radiator from south at west wall in the 4th room from east located at apt 2, 2nd story, 1st apartment from north at east
Nov 7, 2022 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 3rd window frame from south at west wall in the 4th room from east located at apt 2, 2nd story, 1st apartment from north at east
Nov 7, 2022 · Apt 2
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Nov 7, 2022 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling, west wall in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Nov 7, 2022 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) east wall in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Nov 7, 2022 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Nov 7, 2022 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 2nd window frame from south at west wall in the 4th room from east located at apt 2, 2nd story, 1st apartment from north at east
Nov 7, 2022 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 4th room from east located at apt 2, 2nd story, 1st apartment from north at east
Nov 7, 2022 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall in the foyer located at apt 2, 2nd story, 1st apartment from north at east
Nov 7, 2022 · Apt 2
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 4, 2022
Open — Info nov sent out - BHazardous
Replace with new the broken or defective ceramic floor tiles in the bathroom located at apt 2 upper level, 1st story, 1st apartment from south at west
Nov 2, 2022 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the broken or defective cracked marble saddle, at door , in the bathroom located at apt 2 upper level, 1st story, 1st apartment from south at west
Nov 2, 2022 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective unhinged closet door, at east wall, in the 4th room from east at north located at apt 2 upper level, 1st story, 1st apartment from south at west
Nov 2, 2022 · Apt 2
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 1st story, 1st apartment from south at west
Nov 2, 2022 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective unhinged wood door, at south wall, in the 2nd room from east located at apt 2 upper level, 1st story, 1st apartment from south at west
Nov 2, 2022 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective counter balance at, lower sash window to, west wall, in the 4th room from east at north located at apt 2 upper level, 1st story, 1st apartment from south at west
Nov 2, 2022 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the broken or defective ceramic floor tiles in the kitchen located at apt 2 upper level, 1st story, 1st apartment from south at west
Nov 2, 2022 · Apt 2
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2 upper level, 1st story, 1st apartment from south at west
Nov 2, 2022 · Apt 2
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 2 upper level, 1st story, 1st apartment from south at west
Nov 2, 2022 · Apt 2
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 1st story, 1st apartment from south at west
Nov 2, 2022 · Apt 2
Open — Nov sent out - ANon-hazardous
Provide a peep hole in entrance door of the dwelling unit so located as to permit a person inside the dwelling unit to view any person outside entrance door ... in the entrance located at apt 2 lower level, 1st story, 1st apartment from south at west
Nov 2, 2022 · Apt 2
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock, at entrance door to building, , 1st story
Nov 2, 2022
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires, at ceiling, in the private hallway located at apt 2 upper level, 1st story, 1st apartment from south at west
Nov 2, 2022 · Apt 2
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... at ( approximately 25 sqft ) ceiling in the bathroom located at apt 2 upper level, 1st story, 1st apartment from south at west
Nov 2, 2022 · Apt 2
Open — First no access to re- inspect violation - BHazardous
Repair the roof so that it will not leak over the ceiling in the kitchen located at apt 2 upper level, 1st story, 1st apartment from south at west
Nov 2, 2022 · Apt 2
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over the ceiling in the 1st room from east located at apt 2 upper level, 1st story, 1st apartment from south at west
Nov 2, 2022 · Apt 2
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective glass at lower sash window to west wall in the bathroom located at apt 2 upper level, 1st story, 1st apartment from south at west
Nov 2, 2022 · Apt 2
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at south walll at vestibule at public hall, 1st story
Nov 2, 2022
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the bathroom located at apt 2 upper level, 1st story, 1st apartment from south at west
Nov 2, 2022 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tile floor. in the bathroom located at apt 2, 2nd story
Sep 13, 2013 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective connection at sink waste line in the kitchen located at apt 2, 2nd story
Sep 13, 2013 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2fl, 2nd story
Sep 13, 2013 · Apt 2FL
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective counter balance lower sash of east 1 window in the 5th room from east located at apt 1fl, 1st story
Jun 21, 2009 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color east wall in the kitchen located at apt 1fl, 1st story
Jun 21, 2009 · Apt 1FL
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electrical wires at the south wall in the private hallway located at apt 1fl, 1st story
Jun 21, 2009 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Properly repair the broken or defective counter balance, lower sash of south 1 window in the 5th room from east located at apt 1fl, 1st story
Jun 21, 2009 · Apt 1FL
Open — Nov sent out - BHazardous
Replace with new the broken or defective marble saddle at the entrance in the bathroom located at apt 1fl, 1st story
Jun 21, 2009 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Properly repair the broken or defective counter balance, lower sash of south 1 window. in the 4th room from east located at apt 1fl, 1st story
Jun 21, 2009 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Properly repair the broken or defective counter balance at the lower sash of south 2 window. in the 4th room from east located at apt 1fl, 1st story
Jun 21, 2009 · Apt 1FL
Open — First no access to re- inspect violation - CImmediately hazardous
Remove the illegal fastening key operated double cylinder lock on the wrought iron security gate at the building entrance , 1st story
Jun 21, 2009
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1fl, 1st story
Jun 21, 2009 · Apt 1FL
Open — Nov sent out - BHazardous
Replace with new the missing electrical light switch cover at east wall at stairs at south 1st story public hall
Jun 21, 2009
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Heat/hot water
Apartment only
Nov 13, 2024 · Apt 2
Close - Door/window
Window frame
May 16, 2023 · Apt 2
Close - Door/window
Door
May 16, 2023 · Apt 2
Close - Paint/plaster
Wall
Nov 4, 2022 · Apt 2
Close - Flooring/stairs
Floor
Nov 1, 2022 · Apt 2
Close - Door/window
Window frame
Nov 1, 2022 · Apt 2
Close - Unsanitary condition
Mold
Nov 1, 2022 · Apt 2
Close - Paint/plaster
Wall
Nov 1, 2022 · Apt 2
Close - Unsanitary condition
Pests
Nov 1, 2022 · Apt 2
Close - Heating
Heat related
Feb 11, 2014 · Apt 2
Close
Show 27 more ↓
- Heating
Heat related
Sep 10, 2013 · Apt 2FL
Close - Electric
Electric-supply
Sep 10, 2013 · Apt 2
Close - Electric
Electric-supply
Sep 10, 2013 · Apt 2
Close - General
Floor
Sep 10, 2013 · Apt 2
Close - Plumbing
Basin/sink
Sep 10, 2013 · Apt 2
Close - General
Cooking gas
Jun 3, 2009 · Apt 1FL
Close - General
Cooking gas
Jun 2, 2009 · Apt 1FL
Close - Plumbing
Water-leaks
May 27, 2009 · Apt 1FL
Close - Paint/plaster
Ceiling
May 27, 2009 · Apt 1FL
Close - Plumbing
Water-leaks
May 2, 2009 · Apt 1FL
Close - General
Floor
May 2, 2009 · Apt 1FL
Close - Plumbing
Water supply
Apr 30, 2009 · Apt 1FL
Close - Plumbing
Water supply
Apr 30, 2009 · Apt 1FL
Close - Heating
Heat related
Apr 5, 2007 · Apt 1FLOO
Close - Heating
Heat related
Mar 19, 2007 · Apt 1FLOO
Close - Heating
Heat related
Mar 6, 2007 · Apt 1FLOO
Close - Heating
Heat related
Jan 26, 2007 · Apt 1FLOO
Close - Electric
Electric-supply
Jul 27, 2006 · Apt 1ST
Close - Paint/plaster
Door/frame
Jul 27, 2006 · Apt 1ST
Close - General
Doors
Jul 27, 2006 · Apt 1ST
Close - Paint/plaster
Door/frame
Jul 27, 2006 · Apt 1ST
Close - Paint/plaster
Wall
Jul 27, 2006 · Apt 1ST
Close - Paint/plaster
Ceiling
Jul 27, 2006 · Apt 1ST
Close - Paint/plaster
Ceiling
Jul 27, 2006 · Apt 1ST
Close - Paint/plaster
Wall
Jul 27, 2006 · Apt 1ST
Close - Heating
Heat related
Nov 7, 2005 · Apt BASE
Close - Electric
Wiring
Nov 7, 2005 · Apt BASE
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B3)
- Year built
- 1910
- Floors
- 2
- Residential units
- 2
- Building area
- 1,408 ft²
- Lot area
- 2,000 ft²
- Zoning
- R4
- Community board
- 317
- Council district
- 45
- Block / lot
- 4784 / 57
- Assessed value
- $46,620
- Landmark / historic district
- No
Questions about 955 East 49 Street
Who owns 955 East 49 Street?
The owner of record in NYC Department of City Planning PLUTO data is Carr, Randolph D.
Does 955 East 49 Street have violations?
Yes. NYC HPD has recorded 63 housing violations at this property.
Is 955 East 49 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 955 East 49 Street built?
City records list 1910 as the year it was built.
How many apartments are in 955 East 49 Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.