roofy

603 East 94 Street

Brooklyn, NY 11236BBL 3-04754-0036Map

Owner of record: K & K Equities LLC

603 East 94 Street is a walk-up apartment building built in 1929 in Brooklyn, 11236. It has 30 residential units across 4 floors. The owner of record is K & K Equities LLC. HPD has recorded 300 housing violations here, most recently on August 23, 2026. 23 of the 50 most recent violations are still open.

HPD violations
300
DOB violations
1
ECB violations
1
HPD complaints
538

What to know

Concern
13 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Aug 23, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 300

  • B

    Provide provide security in the event of a power outage by means of an acceptable heavy duty lock and latchset at vestibule door at public hall, 1st story

    Aug 23, 2026

    Open — Nov sent out
  • C

    Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at vestibule door at public hall, 1st story

    Aug 23, 2026

    Open — Nov sent out
  • B

    Provide provide security in the event of a power outage by means of an acceptable heavy duty lock and latchset at building entrance door at public hall, 1st story

    Aug 23, 2026

    Open — Nov sent out
  • C

    Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at building entrance door at public hall, 1st story

    Aug 23, 2026

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 1st apartment from west at north

    Aug 16, 2026 · Apt 4B

    Open — Nov certified late
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 1, 2026

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electrical outlet at south wall in the bathroom located at apt d5, 4th story, 1st apartment from north at east

    Apr 29, 2026 · Apt D5

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt d5, 4th story, 1st apartment from north at east

    Apr 29, 2026 · Apt D5

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wall cabinet doors in the kitchen located at apt d5, 4th story, 1st apartment from north at east

    Apr 29, 2026 · Apt D5

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective vinyl tiles at floor in the kitchen located at apt d5, 4th story, 1st apartment from north at east

    Apr 29, 2026 · Apt D5

    Closed — Violation closed
Show 40 more ↓
  • B

    Properly repair with similar material the broken or defective base cabinet walls, floor and door in the kitchen located at apt d5, 4th story, 1st apartment from north at east

    Apr 29, 2026 · Apt D5

    Open — Not complied with
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt d5, 4th story, 1st apartment from north at east

    Apr 29, 2026 · Apt D5

    Open — Not complied with
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt d5, 4th story, 1st apartment from north at east

    Apr 29, 2026 · Apt D5

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt d5, 4th story, 1st apartment from north at east

    Apr 29, 2026 · Apt D5

    Closed — Violation closed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt b5, 2nd story, 1st apartment from north at east , section at south

    Apr 24, 2026 · Apt B5

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from east at south wall door in the 1st room from east at north located at apt b5, 2nd story, 1st apartment from north at east , section at south

    Apr 24, 2026 · Apt B5

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door from west at north wall, ceiling, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 1st room from east at south located at apt b5, 2nd story, 1st apartment from north at east , section at south

    Apr 24, 2026 · Apt B5

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation at 1st radiator from south at west wall in the 1st room from east at south located at apt b5, 2nd story, 1st apartment from north at east , section at south

    Apr 24, 2026 · Apt B5

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation the 1st riser from west at north wall, 1st radiator from south at west wall in the 1st room from east at north located at apt b5, 2nd story, 1st apartment from north at east , section at south

    Apr 24, 2026 · Apt B5

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules - defective in the entire apartment located at apt b5, 2nd story, 1st apartment from north at east , section at south

    Apr 24, 2026 · Apt B5

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt b5, 2nd story, 1st apartment from north at east , section at south

    Apr 24, 2026 · Apt B5

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective bell/buzzer/intercom system from building street entrance to intercom box at north wall in the foyer located at apt b5, 2nd story, 1st apartment from north at east , section at south

    Apr 24, 2026 · Apt B5

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt b5, 2nd story, 1st apartment from north at east , section at south

    Apr 24, 2026 · Apt B5

    Open — Not complied with
  • A

    Paint with light colored paint to the satisfaction of this department at east wall, 1st closet from north at east wall door frame, east wall, 1st closet from north at east wall door, 1st closet from north at east wall door frame in the private hallway located at apt b5, 2nd story, 1st apartment from north at east , section at south

    Apr 24, 2026 · Apt B5

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at baseboard at north wall, 1st door frame from east at south wall, 1st door frame from east at south wall, baseboard at north wall in the kitchen located at apt b5, 2nd story, 1st apartment from north at east , section at south

    Apr 24, 2026 · Apt B5

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from west at north wall in the 1st room from east at south located at apt b5, 2nd story, 1st apartment from north at east , section at south

    Apr 24, 2026 · Apt B5

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 1st room from east at south located at apt b5, 2nd story, 1st apartment from north at east , section at south

    Apr 24, 2026 · Apt B5

    Open — Violation will be reinspected
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from east at south wall door frame in the 1st room from east at north located at apt b5, 2nd story, 1st apartment from north at east , section at south

    Apr 24, 2026 · Apt B5

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). west wall in the private hallway located at apt b5, 2nd story, 1st apartment from north at east , section at south

    Apr 24, 2026 · Apt B5

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the kitchen located at apt b5, 2nd story, 1st apartment from north at east , section at south

    Apr 24, 2026 · Apt B5

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the foyer located at apt b5, 2nd story, 1st apartment from north at east , section at south

    Apr 24, 2026 · Apt B5

    Open — Defect letter issued
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt b5, 2nd story, 1st apartment from north at east , section at south

    Apr 24, 2026 · Apt B5

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation at 1st door frame from south at west wall, 1st door from south at west wall, 1st door from south at west wall, 1st door frame from south at west wall in the foyer located at apt b5, 2nd story, 1st apartment from north at east , section at south

    Apr 24, 2026 · Apt B5

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 20, 2025

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 7d, 4th story, 1st apartment from south at west , section ''south''

    Sep 6, 2025 · Apt 7D

    Open — Not complied with
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at east located at apt 7d, 4th story, 1st apartment from south at west , section ''south''

    Sep 6, 2025 · Apt 7D

    Open — Not complied with
  • B

    Repair the roof so that it will not leak over ceiling and west wall in the 1st room from north located at apt 7d, 4th story, 1st apartment from south at west , section ''south''

    Sep 6, 2025 · Apt 7D

    Open — Not complied with
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the kitchen located at apt 7d, 4th story, 1st apartment from south at west , section ''south''

    Sep 6, 2025 · Apt 7D

    Open — Not complied with
  • B

    Repair the roof so that it will not leak over ceiling in the kitchen located at apt 7d, 4th story, 1st apartment from south at west , section ''south''

    Sep 6, 2025 · Apt 7D

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 7d, 4th story, 1st apartment from south at west , section ''south''

    Sep 6, 2025 · Apt 7D

    Open — Defect letter issued
  • B

    Properly repair or replace the broken or defective window sill at window leading t0 fire escape in the 1st room from north at west located at apt 7d, 4th story, 1st apartment from south at west , section ''south''

    Sep 6, 2025 · Apt 7D

    Open — Not complied with
  • B

    Repair the roof so that it will not leak over ceiling in the 1st room from north at east located at apt 7d, 4th story, 1st apartment from south at west , section ''south''

    Sep 6, 2025 · Apt 7D

    Open — Not complied with
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story, section ''north''

    Sep 6, 2025

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story, section ''north''

    Sep 6, 2025

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story, section ''south''

    Sep 6, 2025

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story, section ''south''

    Sep 6, 2025

    Closed — Violation closed
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story, section ''south''

    Sep 6, 2025

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story, section ''south''

    Sep 6, 2025

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 4th story, section ''south''

    Sep 6, 2025

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak over ceiling at public hall, 4th story, section ''south''

    Sep 6, 2025

    Closed — Violation closed

DOB building violations · 1

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2019

    Dob violation - active

ECB violations · 1

  • Class - 2

    B254,32a,28b,11c,50a,50b,50c,50d,50e,50f,50g. 50a peep hole glass missing. 50b flue pipe not properly sealed to chimney 50c pipe hot water relief valve discharge down. 50d pipe back flow preventer discharge

    Apr 13, 2009

    Resolve

Complaints

  • Safety

    Smoke detector

    Apr 24, 2026 · Apt C3

    Close
  • Safety

    Carbon monoxide detector

    Apr 24, 2026 · Apt C3

    Close
  • Unsanitary condition

    Pests

    Apr 24, 2026 · Apt C3

    Close
  • Unsanitary condition

    Pests

    Apr 24, 2026 · Apt C3

    Close
  • Unsanitary condition

    Pests

    Apr 24, 2026 · Apt B5

    Close
  • Safety

    Window guard broken/missing

    Apr 24, 2026 · Apt B5

    Close
  • Paint/plaster

    Ceiling

    Apr 24, 2026 · Apt B5

    Close
  • General

    Bell/buzzer/intercom

    Apr 24, 2026 · Apt B5

    Close
  • Unsanitary condition

    Pests

    Apr 24, 2026 · Apt D3

    Close
  • General

    Bell/buzzer/intercom

    Apr 24, 2026 · Apt D3

    Close
Show 40 more ↓
  • Door/window

    Door

    Apr 24, 2026 · Apt D4

    Close
  • Door/window

    Door

    Apr 24, 2026 · Apt PH

    Close
  • Door/window

    Door

    Apr 24, 2026 · Apt PH

    Close
  • Door/window

    Door

    Apr 24, 2026 · Apt PH

    Close
  • Unsanitary condition

    Pests

    Apr 24, 2026 · Apt D4

    Close
  • Unsanitary condition

    Pests

    Apr 24, 2026 · Apt D5

    Close
  • Safety

    Carbon monoxide detector

    Apr 24, 2026 · Apt D5

    Close
  • Safety

    Smoke detector

    Apr 24, 2026 · Apt D5

    Close
  • Unsanitary condition

    Pests

    Apr 22, 2026 · Apt D2

    Close
  • Paint/plaster

    Ceiling

    Apr 22, 2026 · Apt D2

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 9, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Apr 9, 2026 · Apt 2C6B5B

    Close
  • Heat/hot water

    Apartment only

    Oct 17, 2025 · Apt 4B

    Close
  • Door/window

    Window frame

    Sep 3, 2025 · Apt 7D

    Close
  • Unsanitary condition

    Pests

    Sep 3, 2025 · Apt 7D

    Close
  • Water leak

    Slow leak

    Sep 3, 2025 · Apt 7D

    Close
  • Unsanitary condition

    Pests

    Sep 3, 2025 · Apt 7D

    Close
  • General

    Bell/buzzer/intercom

    Jun 5, 2025 · Apt 4B

    Close
  • Paint/plaster

    Ceiling

    Jun 5, 2025 · Apt 4B

    Close
  • Paint/plaster

    Wall

    Jun 5, 2025 · Apt 4B

    Close
  • Water leak

    Heavy flow

    Jun 5, 2025 · Apt 4B

    Close
  • Paint/plaster

    Ceiling

    Jun 5, 2025 · Apt 4B

    Close
  • Water leak

    Damp spot

    Jun 4, 2025 · Apt 4B

    Close
  • Water leak

    Slow leak

    May 8, 2025 · Apt 2C

    Close
  • Flooring/stairs

    Floor

    May 8, 2025 · Apt 2C

    Close
  • Water leak

    Damp spot

    May 8, 2025 · Apt 2C

    Close
  • Unsanitary condition

    Pests

    Jan 21, 2025 · Apt D2

    Close
  • Unsanitary condition

    Pests

    Jan 21, 2025 · Apt D2

    Close
  • Unsanitary condition

    Pests

    Jan 21, 2025 · Apt D7

    Close
  • Unsanitary condition

    Pests

    Jan 21, 2025 · Apt D7

    Close
  • Door/window

    Door

    Jan 21, 2025 · Apt D7

    Close
  • Door/window

    Door

    Jan 21, 2025 · Apt D3

    Close
  • Unsanitary condition

    Pests

    Jan 21, 2025 · Apt D3

    Close
  • Unsanitary condition

    Pests

    Jan 21, 2025 · Apt D3

    Close
  • Safety

    Carbon monoxide detector

    Jan 21, 2025 · Apt D3

    Close
  • Safety

    Smoke detector

    Jan 21, 2025 · Apt D3

    Close
  • Safety

    Carbon monoxide detector

    Jan 21, 2025 · Apt D2

    Close
  • Safety

    Smoke detector

    Jan 21, 2025 · Apt D2

    Close
  • Door/window

    Door

    Jan 21, 2025 · Apt D2

    Close
  • Door/window

    Door

    Jan 21, 2025 · Apt C2

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1929
Floors
4
Residential units
30
Building area
27,520 ft²
Lot area
8,000 ft²
Zoning
R5
Community board
317
Council district
42
Block / lot
4754 / 36
Assessed value
$1,998,000
Landmark / historic district
No

HPD registration #312760, last renewed Jun 29, 2026.

Questions about 603 East 94 Street

Who owns 603 East 94 Street?

The owner of record in NYC Department of City Planning PLUTO data is K & K Equities LLC.

Does 603 East 94 Street have violations?

Yes. NYC HPD has recorded 300 housing violations at this property.

Is 603 East 94 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 603 East 94 Street built?

City records list 1929 as the year it was built.

How many apartments are in 603 East 94 Street?

It has 30 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.