473 East 52 Street
Brooklyn, NY 11203BBL 3-04724-0052Map
Owner of record: 473 East 52 LLC
473 East 52 Street is a walk-up apartment building built in 1925 in Brooklyn, 11203. It has 3 residential units across 2 floors. The owner of record is 473 East 52 LLC. HPD has recorded 41 housing violations here, most recently on September 6, 2026. 39 of the 41 most recent violations are still open.
- HPD violations
- 41
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 40
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 41
- BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at yard buidling front
Sep 6, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 31, 2026 · Apt 2FL
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 31, 2026 · Apt 2FL
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective wood floor at radiator in the 1st room from east located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 31, 2026 · Apt 2FL
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door at cellar at boiler room
Mar 31, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective entrance door in the 1st room from east located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 31, 2026 · Apt 2FL
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 30 aquare at ceiling in the bathroom located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 31, 2026 · Apt 2FL
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 31, 2026 · Apt 2FL
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the ceramic tile grout joints at peremeter at bath tub in the bathroom located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 31, 2026 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective door in the kitchen located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 31, 2026 · Apt 2FL
Open — Nov sent out
Show 31 more ↓
- BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 31, 2026 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 31, 2026 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the foyer located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 31, 2026 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the foyer located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 31, 2026 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective connection waste line at sink in the kitchen located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 31, 2026 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of at ceiling in the private hallway located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 31, 2026 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in closets in the private hallway located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 31, 2026 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the private hallway located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 31, 2026 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter balance at upper and lower sash windows in the 1st room from north located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 31, 2026 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from north located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 31, 2026 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 2nd room from north located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 31, 2026 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 2nd room from north located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 31, 2026 · Apt 2FL
Open — Nov sent out - BHazardous
Refit doors at east wall in the kitchen located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 31, 2026 · Apt 2FL
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at all electrical light fixture and outlet in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 31, 2026 · Apt 2FL
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is missing in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Nov 5, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is missing in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Nov 5, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Nov 5, 2025 · Apt 2
Open — Notice of issuance sent to tenant - BHazardous
Repair the roof so that it will not leak above the ceiling in the 3rd room from east located at apt 2, 2nd story, 1st apartment from north at east
Nov 5, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt 2, 2nd story, 1st apartment from north at east
Nov 5, 2025 · Apt 2
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling light fixtures in the private hallway located at apt 2, 2nd story, 1st apartment from north at east
Nov 5, 2025 · Apt 2
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... closet ceiling greater than 10 square feet in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Nov 5, 2025 · Apt 2
Open — First no access to re- inspect violation - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling less than 10 square feet in the 3rd room from east located at apt 2, 2nd story, 1st apartment from north at east
Nov 5, 2025 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective connection at wasteline sink in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Nov 5, 2025 · Apt 2
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less that 10 sqft around bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Nov 5, 2025 · Apt 2
Closed — Violation closed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling at public hall stairs
Nov 5, 2025
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling less than 10 square feet in the 3rd room from east located at apt 2, 2nd story, 1st apartment from north at east original violation 18349353 issued 05-nov-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Nov 5, 2025 · Apt 2
Open — First no access to re- inspect violation - BHazardous
Trace and repair the source and abate the visible mold condition... less that 10 sqft around bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from north at east original violation 18349357 issued 05-nov-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Nov 5, 2025 · Apt 2
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Nov 5, 2025 · Apt 2
Open — Notice of issuance sent to tenant - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 square feet at ceiling in the bathroom located at apt 2nd fl, 2nd story, 1st apartment from north at east
Aug 28, 2025 · Apt 2ND FL
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt 2nd fl, 2nd story, 1st apartment from north at east
Aug 28, 2025 · Apt 2ND FL
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2nd fl, 2nd story, 1st apartment from north at east
Aug 28, 2025 · Apt 2ND FL
Open — Notice of issuance sent to tenant
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Door/window
Window frame
Oct 17, 2026 · Apt 2
Close - Paint/plaster
Ceiling
Oct 17, 2026 · Apt 2
Close - Paint/plaster
Ceiling
Oct 17, 2026 · Apt 2
Close - Flooring/stairs
Floor
Oct 17, 2026 · Apt 2
Close - General
Bell/buzzer/intercom
Oct 17, 2026 · Apt 2
Close - General
Cabinet
Oct 17, 2026 · Apt 2
Close - Plumbing
Water supply
Oct 17, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Oct 9, 2026 · Apt 2FL
Open - Unsanitary condition
Pests
Oct 9, 2026 · Apt 2FL
Open - Paint/plaster
Wall
Oct 9, 2026 · Apt 2FL
Open
Show 30 more ↓
- Water leak
Slow leak
Oct 9, 2026 · Apt 2FL
Open - Unsanitary condition
Mold
Oct 9, 2026 · Apt 2FL
Open - Plumbing
Bathtub/shower
Oct 9, 2026 · Apt 2FL
Open - Flooring/stairs
Floor
Oct 9, 2026 · Apt 2FL
Open - Electric
Wiring
Oct 9, 2026 · Apt 2FL
Open - Unsanitary condition
Garbage/recycling storage
Aug 18, 2026 · Apt BLDG
Close - Electric
No lighting
Jul 7, 2026 · Apt 2NDFLO
Close - Heat/hot water
Entire building
May 3, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Mar 24, 2026 · Apt 2FL
Close - Paint/plaster
Wall
Mar 24, 2026 · Apt 2FL
Close - Water leak
Slow leak
Mar 24, 2026 · Apt 2FL
Close - Plumbing
Radiator
Mar 24, 2026 · Apt 2FL
Close - Unsanitary condition
Mold
Mar 24, 2026 · Apt 2FL
Close - Door/window
Door
Mar 24, 2026 · Apt 2FL
Close - Door/window
Window frame
Mar 24, 2026 · Apt 2FL
Close - Flooring/stairs
Floor
Mar 24, 2026 · Apt 2FL
Close - Plumbing
Basin/sink
Mar 24, 2026 · Apt 2FL
Close - Heat/hot water
Apartment only
Nov 19, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Nov 11, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Nov 11, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Nov 11, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Nov 11, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Nov 11, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Nov 10, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Nov 5, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Nov 2, 2025 · Apt 2
Close - Heat/hot water
Entire building
Oct 25, 2025 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Aug 27, 2025 · Apt 2ND FL
Close - Electric
Power outage
Aug 14, 2014 · Apt 2DFL
Close - Heating
Heat related
Oct 25, 2013 · Apt 2
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| May 20, 2026 | $520,000 | Three family dwellings | 3 |
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1925
- Floors
- 2
- Residential units
- 3
- Building area
- 2,400 ft²
- Lot area
- 2,525 ft²
- Zoning
- R5
- Community board
- 317
- Council district
- 45
- Block / lot
- 4724 / 52
- Assessed value
- $62,220
- Landmark / historic district
- No
Questions about 473 East 52 Street
Who owns 473 East 52 Street?
The owner of record in NYC Department of City Planning PLUTO data is 473 East 52 LLC.
Does 473 East 52 Street have violations?
Yes. NYC HPD has recorded 41 housing violations at this property.
Is 473 East 52 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 473 East 52 Street built?
City records list 1925 as the year it was built.
How many apartments are in 473 East 52 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.