602 East 91 Street
Brooklyn, NY 11236BBL 3-04711-0068Map
Owner of record: Delvois, Marco
602 East 91 Street is a walk-up apartment building built in 1920 in Brooklyn, 11236. It has 3 residential units across 2 floors. The owner of record is Delvois, Marco. HPD has recorded 26 housing violations here, most recently on January 20, 2024. 22 of the 26 most recent violations are still open.
- HPD violations
- 26
- DOB violations
- 0
- ECB violations
- 1
- HPD complaints
- 23
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 26
- CImmediately hazardous
Provide adequate supply of cold water for the fixtures ( no volume ) in the entire apartment located at apt 1floor, 1st story, 1st apartment from south at west
Jan 20, 2024 · Apt 1FLOOR
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures ( no volume) in the entire apartment located at apt 1floor, 1st story, 1st apartment from south at west
Jan 20, 2024 · Apt 1FLOOR
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 1floor, 1st story, 1st apartment from south at west
Jan 20, 2024 · Apt 1FLOOR
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1stflo, 1st story, 1st apartment from east at south
Jan 17, 2024 · Apt 1STFLO
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1stflo, 1st story, 1st apartment from east at south
Jan 17, 2024 · Apt 1STFLO
Closed — Violation dismissed - BHazardous
Provide adequate supply of hot water for the fixtures . in the bathroom located at apt 1stflo, 1st story, 1st apartment from east at south
Jan 17, 2024 · Apt 1STFLO
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures . in the bathroom located at apt 1stflo, 1st story, 1st apartment from east at south
Jan 17, 2024 · Apt 1STFLO
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 1stflo, 1st story, 1st apartment from east at south
Jan 17, 2024 · Apt 1STFLO
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures at range in the entire apartment located at apt 1stflo, 1st story, 1st apartment from east at south
Jan 17, 2024 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, north wall, 1st door frame from west at north wall, west wall, south wall in the 4th room from north at west located at apt 1stflo, 1st story, 1st apartment from east at south
Jan 17, 2024 · Apt 1STFLO
Open — Nov sent out
Show 16 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, west wall in the 4th room from north at east located at apt 1stflo, 1st story, 1st apartment from east at south
Jan 17, 2024 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the 1st room from north located at apt 1stflo, 1st story, 1st apartment from east at south
Jan 17, 2024 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall, 1st window frame from north at east wall in the foyer located at apt 1stflo, 1st story, 1st apartment from east at south
Jan 17, 2024 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the kitchen located at apt 1stflo, 1st story, 1st apartment from east at south
Jan 17, 2024 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st window frame from east at south wall in the 4th room from north at west located at apt 1stflo, 1st story, 1st apartment from east at south
Jan 17, 2024 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door in the 4th room from north at west located at apt 1stflo, 1st story, 1st apartment from east at south
Jan 17, 2024 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 4th room from north at east located at apt 1stflo, 1st story, 1st apartment from east at south
Jan 17, 2024 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 2nd window frame from north at east wall in the 1st room from north located at apt 1stflo, 1st story, 1st apartment from east at south
Jan 17, 2024 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1stflo, 1st story, 1st apartment from east at south
Jan 17, 2024 · Apt 1STFLO
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, apartment at south
Jun 12, 2019 · Apt 1
Open — Nov sent out - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections kitchen and bathroom at basement
Oct 10, 2009
Open — Nov sent out - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible .. at basement
Oct 10, 2009
Open — Nov sent out - BHazardous
Properly repair the broken or defective entrance door lock to building
Apr 15, 2005
Open — Nov sent out - BHazardous
Replace with new the missing glass pane at entrance door to building
Apr 15, 2005
Open — Nov sent out - BHazardous
Remove the illegal fastening double cylinder key lock at entrance door to bldg
Apr 15, 2005
Open — Nov sent out - ANon-hazardous
Refit door to apt 1
Apr 15, 2005
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 1
- Class - 1
Occupancy contrary to that allowed by c of o & dept of bldgs records-4"b" rooms created at basement.partitions erected creating rooms,kitch en & bathroom fixtures present.remedy:discontinue illegal use of amend
Oct 10, 2009
Resolve
Complaints
- Heat/hot water
Apartment only
Jan 17, 2024 · Apt 1STFLO
Close - Plumbing
Water supply
Jan 17, 2024 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Jan 17, 2024 · Apt 1FLOOR
Close - Heat/hot water
Apartment only
Jan 17, 2024 · Apt 1FLOOR
Close - Heat/hot water
Apartment only
Jan 16, 2024 · Apt 1STFLO
Close - Plumbing
Water supply
Jan 16, 2024 · Apt 1STFLO
Close - Flooring/stairs
Floor
Jan 16, 2024 · Apt 1STFLO
Close - Flooring/stairs
Floor
Jan 16, 2024 · Apt 1STFLO
Close - General
Cooking gas
Jan 16, 2024 · Apt 1STFLO
Close - Heat/hot water
Entire building
Dec 10, 2020 · Apt 2
Close
Show 13 more ↓
- Paint/plaster
Ceiling
Jun 10, 2019 · Apt 2NDFL
Close - Paint/plaster
Wall
Jun 10, 2019 · Apt 2NDFL
Close - Water leak
Slow leak
Jun 10, 2019 · Apt 2NDFL
Close - Unsanitary condition
Pests
Jun 10, 2019 · Apt 2NDFL
Close - General
Cabinet
Jun 10, 2019 · Apt 2NDFL
Close - Paint/plaster
Ceiling
Jun 10, 2019 · Apt 2NDFL
Close - Plumbing
Sewer
Oct 8, 2009 · Apt BSMT
Close - Appliance
Electric/gas range
Oct 8, 2009 · Apt BSMT
Close - Electric
Lighting
Oct 8, 2009 · Apt BSMT
Close - Heating
Heat related
Oct 8, 2009 · Apt BSMT
Close - Heating
Heat related
Jan 21, 2007 · Apt BLDG
Close - General
Locks
Mar 14, 2005 · Apt BSMT
Close - General
Windows
Mar 14, 2005 · Apt BSMT
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1920
- Floors
- 2
- Residential units
- 3
- Building area
- 3,840 ft²
- Lot area
- 3,008 ft²
- Zoning
- R5
- Community board
- 317
- Council district
- 42
- Block / lot
- 4711 / 68
- Assessed value
- $73,980
- Landmark / historic district
- No
Questions about 602 East 91 Street
Who owns 602 East 91 Street?
The owner of record in NYC Department of City Planning PLUTO data is Delvois, Marco.
Does 602 East 91 Street have violations?
Yes. NYC HPD has recorded 26 housing violations at this property.
Is 602 East 91 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 602 East 91 Street built?
City records list 1920 as the year it was built.
How many apartments are in 602 East 91 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.