roofy

467 East 94 Street

Brooklyn, NY 11212BBL 3-04691-0066Map

Owner of record: Garfield Lamb, As Trustee

467 East 94 Street is a walk-up apartment building built in 1930 in Brooklyn, 11212. It has 4 residential units across 2 floors. The owner of record is Garfield Lamb, As Trustee. HPD has recorded 78 housing violations here, most recently on May 4, 2026. 33 of the 50 most recent violations are still open.

HPD violations
78
DOB violations
0
ECB violations
1
HPD complaints
58

What to know

Concern
8 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 4, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 78

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 4, 2026

    Open — Nov sent out
  • C

    Make safe by properly repairing the structural defect verticalcrack with missing mortar joints at west section of north wall from 1st story up to parpet wall at roof , 2nd story

    Jul 1, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 9, 2025

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Aug 26, 2024

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Aug 26, 2024

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Aug 26, 2024

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Aug 26, 2024

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 9, 2024

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... approx 5 sq ft at ceiling in the kitchen located at apt 2f, 2nd story, 1st apartment from east at south

    Feb 5, 2024 · Apt 2F

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south

    Feb 5, 2024 · Apt 2F

    Open — Nov sent out
Show 40 more ↓
  • B

    Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south

    Feb 5, 2024 · Apt 2F

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... approx 10 sq ft at ceiling and wall in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south

    Feb 5, 2024 · Apt 2F

    Open — First no access to re- inspect violation
  • B

    Trace and repair the source and abate the visible mold condition... approx 5 sq ft at ceiling in the kitchen located at apt 2f, 2nd story, 1st apartment from east at south original violation 16649669 issued 05-feb-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Feb 5, 2024 · Apt 2F

    Open — First no access to re- inspect violation
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south

    Nov 1, 2023 · Apt 2F

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south

    Nov 1, 2023 · Apt 2F

    Open — Notice of issuance sent to tenant
  • B

    Properly repair or replace the broken or defective west closet door in the foyer located at apt 2f, 2nd story, 1st apartment from east at south

    Nov 1, 2023 · Apt 2F

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st window frame from east at south wall, 1st door from west at north wall, 1st door frame from west at north wall in the 4th room from north at east located at apt 2f, 2nd story, 1st apartment from east at south

    Nov 1, 2023 · Apt 2F

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door frame from west at north wall in the 3rd room from north located at apt 2f, 2nd story, 1st apartment from east at south

    Nov 1, 2023 · Apt 2F

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... approximately 10 sq ft at north wall and 8 sq ft at east wall in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south

    Nov 1, 2023 · Apt 2F

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 2f, 2nd story, 1st apartment from east at south

    Nov 1, 2023 · Apt 2F

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the foyer located at apt 2f, 2nd story, 1st apartment from east at south

    Nov 1, 2023 · Apt 2F

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2f, 2nd story, 1st apartment from east at south

    Nov 1, 2023 · Apt 2F

    Open — Nov sent out
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2f, 2nd story, 1st apartment from east at south

    Nov 1, 2023 · Apt 2F

    Open — Nov sent out
  • C

    Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south

    Nov 1, 2023 · Apt 2F

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the kitchen located at apt 2f, 2nd story, 1st apartment from east at south

    Nov 1, 2023 · Apt 2F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the kitchen located at apt 2f, 2nd story, 1st apartment from east at south

    Nov 1, 2023 · Apt 2F

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer located at apt 2f, 2nd story, 1st apartment from east at south

    Nov 1, 2023 · Apt 2F

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south

    Nov 1, 2023 · Apt 2F

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall, 2nd window frame from north at east wall in the 3rd room from north located at apt 2f, 2nd story, 1st apartment from east at south

    Nov 1, 2023 · Apt 2F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 2nd window frame from east at south wall in the 4th room from north at east located at apt 2f, 2nd story, 1st apartment from east at south

    Nov 1, 2023 · Apt 2F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 4th room from north at west located at apt 2f, 2nd story, 1st apartment from east at south

    Nov 1, 2023 · Apt 2F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall in the 4th room from north at west located at apt 2f, 2nd story, 1st apartment from east at south

    Nov 1, 2023 · Apt 2F

    Closed — Violation closed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2f, 2nd story, 1st apartment from east at south

    Nov 1, 2023 · Apt 2F

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 22, 2023

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective eroded facade brick at exterior west wall 2nd story of building front

    Apr 13, 2022

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 24, 2022

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the bathroom , the kitchen located at apt 2f, 2nd story, 1st apartment from south at west

    Jan 13, 2022 · Apt 2F

    Open — Nov sent out
  • C

    Repair the roof so that it will not leak at ceiling in the kitchen located at apt 2f, 2nd story, 1st apartment from south at west

    Jan 13, 2022 · Apt 2F

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west

    Jan 13, 2022 · Apt 2F

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west

    Jan 13, 2022 · Apt 2F

    Open — Notice of issuance sent to tenant
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 8, 2021

    Closed — Violation dismissed
  • C

    Replace with new the broken or defective fire proof self closing door in the entrance located at apt 2f, 2nd story, 1st apartment from south at west

    Jan 19, 2021 · Apt 2F

    Closed — Violation closed
  • B

    Properly repair the broken or defective door bell in the entrance located at apt 2f, 2nd story, 1st apartment from east at south

    Nov 27, 2020 · Apt 2F

    Closed — Violation dismissed
  • C

    Replace with new the broken or defective glass pane at lower window sash in the 1st room from north at east located at apt 2f, 2nd story, 1st apartment from east at south

    Nov 27, 2020 · Apt 2F

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective electric bell buzzer intercom system in the entrance located at apt 2f, 2nd story, 1st apartment from south at west

    Jun 24, 2020 · Apt 2F

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 2f, 2nd story, 1st apartment from south at west

    Jun 24, 2020 · Apt 2F

    Open — Nov sent out
  • C

    Replace with new the broken or defective glass in the 1st room from north at west located at apt 2f, 2nd story, 1st apartment from south at west

    Jun 24, 2020 · Apt 2F

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Dec 31, 2019

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Dec 31, 2019

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Dec 31, 2019

    Open — Nov sent out

DOB building violations · 0

No DOB violations on record

ECB violations · 1

  • Class - 2

    At time of inspection observed missing mortar above window lintels, horizontal and step cracks at exposure 1 and 4., repair and/or replace

    Jul 2, 2025

    Resolve

Complaints

  • Unsanitary condition

    Mold

    Oct 7, 2024 · Apt 2F

    Close
  • Unsanitary condition

    Mold

    Aug 21, 2024 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Aug 21, 2024 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Aug 21, 2024 · Apt 2F

    Close
  • Unsanitary condition

    Mold

    Feb 9, 2024 · Apt 2F

    Close
  • Plumbing

    Steam pipe/riser

    Feb 2, 2024 · Apt 2F

    Close
  • Flooring/stairs

    Floor

    Feb 2, 2024 · Apt 2F

    Close
  • Electric

    Wiring

    Feb 2, 2024 · Apt 2F

    Close
  • Plumbing

    Basin/sink

    Feb 2, 2024 · Apt 2F

    Close
  • Appliance

    Electric/gas range

    Oct 30, 2023 · Apt 2F

    Close
Show 40 more ↓
  • Plumbing

    Basin/sink

    Oct 30, 2023 · Apt 2F

    Close
  • Door/window

    Window frame

    Oct 30, 2023 · Apt 2F

    Close
  • Door/window

    Window frame

    Oct 30, 2023 · Apt 2F

    Close
  • Door/window

    Door

    Oct 30, 2023 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Oct 30, 2023 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Oct 30, 2023 · Apt 2F

    Close
  • Appliance

    Refrigerator

    Oct 30, 2023 · Apt 2F

    Close
  • Electric

    Wiring

    Oct 30, 2023 · Apt 2F

    Close
  • Water leak

    Heavy flow

    Dec 31, 2022 · Apt 1F

    Close
  • Paint/plaster

    Ceiling

    Jan 11, 2022 · Apt 2F

    Close
  • Plumbing

    Radiator

    Jan 11, 2022 · Apt 2F

    Close
  • Plumbing

    Steam pipe/riser

    Jan 11, 2022 · Apt 2F

    Close
  • Door/window

    Door frame

    Jan 14, 2021 · Apt 2F

    Close
  • Door/window

    Door

    Jan 14, 2021 · Apt 2F

    Close
  • Flooring/stairs

    Floor

    Dec 29, 2020 · Apt 2F

    Close
  • Paint/plaster

    Radiator

    Dec 29, 2020 · Apt 2F

    Close
  • Water leak

    Slow leak

    Nov 21, 2020 · Apt 2F

    Close
  • General

    Bell/buzzer/intercom

    Nov 21, 2020 · Apt 2F

    Close
  • Paint/plaster

    Ceiling

    Nov 21, 2020 · Apt 2F

    Close
  • Plumbing

    Radiator

    Nov 21, 2020 · Apt 2F

    Close
  • Door/window

    Window pane

    Nov 21, 2020 · Apt 2F

    Close
  • Plumbing

    Toilet

    Nov 21, 2020 · Apt 2F

    Close
  • Paint/plaster

    Ceiling

    Nov 21, 2020 · Apt 2F

    Close
  • General

    Bell/buzzer/intercom

    Jun 23, 2020 · Apt 2F

    Close
  • Paint/plaster

    Ceiling

    Jun 23, 2020 · Apt 2F

    Close
  • Door/window

    Window pane

    Jun 23, 2020 · Apt 2F

    Close
  • Door/window

    Window pane

    May 19, 2020 · Apt 2F

    Close
  • Electric

    Lighting

    Nov 18, 2019 · Apt 2F

    Close
  • Water leak

    Slow leak

    Nov 18, 2019 · Apt 2F

    Close
  • Plumbing

    Radiator

    Nov 18, 2019 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Nov 18, 2019 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Nov 18, 2019 · Apt 2F

    Close
  • Appliance

    Refrigerator

    Nov 18, 2019 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Oct 31, 2017 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Oct 27, 2017 · Apt 2F

    Close
  • Door/window

    Window frame

    Aug 16, 2017 · Apt 1F

    Close
  • Flooring/stairs

    Floor

    Aug 16, 2017 · Apt 1F

    Close
  • General

    Bell/buzzer/intercom

    Aug 16, 2017 · Apt 1F

    Close
  • Plumbing

    Basin/sink

    Aug 16, 2017 · Apt 1F

    Close
  • Unsanitary condition

    Mold

    Aug 16, 2017 · Apt 1F

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C3)
Year built
1930
Floors
2
Residential units
4
Building area
3,600 ft²
Lot area
3,000 ft²
Zoning
R6
Community board
317
Council district
41
Block / lot
4691 / 66
Assessed value
$224,550
Landmark / historic district
No

HPD registration #304228, last renewed Jul 24, 2025.

Questions about 467 East 94 Street

Who owns 467 East 94 Street?

The owner of record in NYC Department of City Planning PLUTO data is Garfield Lamb, As Trustee.

Does 467 East 94 Street have violations?

Yes. NYC HPD has recorded 78 housing violations at this property.

Is 467 East 94 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 467 East 94 Street built?

City records list 1930 as the year it was built.

How many apartments are in 467 East 94 Street?

It has 4 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.