480 East 94 Street
Brooklyn, NY 11212BBL 3-04690-0061Map
Owner of record: Aree Group LLC
480 East 94 Street is a walk-up apartment building built in 1930 in Brooklyn, 11212. It has 6 residential units across 3 floors. The owner of record is Aree Group LLC. HPD has recorded 1,043 housing violations here, most recently on October 7, 2026. 38 of the 50 most recent violations are still open.
- HPD violations
- 1,043
- DOB violations
- 52
- ECB violations
- 68
- HPD complaints
- 990
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,043
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 1st room from east located at apt 1a, 1st story, 1st apartment from west at north
Oct 7, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl , in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Oct 7, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Oct 7, 2026 · Apt 1A
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective regrout ceramic floor tiles in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Oct 7, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective closet door at the north wall in the 1st room from east located at apt 1a, 1st story, 1st apartment from west at north
Oct 7, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ceramic tiles at the south wall in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Oct 7, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Oct 7, 2026 · Apt 2B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Oct 7, 2026 · Apt 2B
Open — Notice of issuance sent to tenant - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west
Oct 7, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 2b, 2nd story, 1st apartment from south at west
Oct 7, 2026 · Apt 2B
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 2nd room from east located at apt 1a, 1st story, 1st apartment from west at north
Oct 7, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective reglaze bathtub with porcelain paint in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west
Oct 7, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in at bathtub in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west
Oct 7, 2026 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Jun 15, 2026 · Apt 2B
Open — First no access to re- inspect violation - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Jun 15, 2026 · Apt 2B
Open — First no access to re- inspect violation - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Jun 15, 2026 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the kitchen located at apt 2b, 2nd story, 1st apartment from south at west
Jun 15, 2026 · Apt 2B
Open — First no access to re- inspect violation - BHazardous
Remove all obstructions and repair all defects in drain pipe at bathtub in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west
Jun 15, 2026 · Apt 2B
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Jun 15, 2026 · Apt 2B
Open — First no access to re- inspect violation - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Jun 15, 2026 · Apt 2B
Open — First no access to re- inspect violation - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeds the maximum operating temperature of 130 f in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
Jun 15, 2026 · Apt 2B
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Open — First no access to re- inspect violation - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 19, 2025
Open — First no access to re- inspect violation - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west
Aug 27, 2025 · Apt 1B
Open — First no access to re- inspect violation - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west
Aug 27, 2025 · Apt 1B
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair or replace the broken or defective base cabinet at washbasin in the bathroom located at apt 1b, 1st story, 1st apartment from south at west
Aug 27, 2025 · Apt 1B
Open — First no access to re- inspect violation - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 1b, 1st story, 1st apartment from south at west
Aug 27, 2025 · Apt 1B
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west
Aug 27, 2025 · Apt 1B
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west
Aug 27, 2025 · Apt 1B
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective connection wasteline at sink in the kitchen located at apt 1b, 1st story, 1st apartment from south at west
Aug 27, 2025 · Apt 1B
Open — First no access to re- inspect violation - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1b, 1st story, 1st apartment from south at west
Aug 27, 2025 · Apt 1B
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the kitchen located at apt 1b, 1st story, 1st apartment from south at west
Jul 27, 2025 · Apt 1B
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 1b, 1st story, 1st apartment from south at west
Jul 27, 2025 · Apt 1B
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective wood door frame in the 3rd room from east at north located at apt 1b, 1st story, 1st apartment from south at west
Jul 27, 2025 · Apt 1B
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall in shower stall in the bathroom located at apt 1b, 1st story, 1st apartment from south at west
Jul 27, 2025 · Apt 1B
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective wood door entrance in the bathroom located at apt 1b, 1st story, 1st apartment from south at west
Jul 27, 2025 · Apt 1B
Open — First no access to re- inspect violation - BHazardous
Properly repair or replace the broken or defective rubber gasket at refrigerator door in the kitchen located at apt 2b, 2nd story, 1st apartment from south at west
Jul 25, 2025 · Apt 2B
Open — First no access to re- inspect violation - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 2b, 2nd story, 1st apartment from south at west
Jul 25, 2025 · Apt 2B
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective wood closet door at west wall in the 5th room from east located at apt 1a, 1st story, 1st apartment from west at north
Jul 16, 2025 · Apt 1A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the private hallway located at apt 1a, 1st story, 1st apartment from west at north
Jul 16, 2025 · Apt 1A
Open — Not complied with - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Jul 16, 2025 · Apt 1A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood closet door at north wall in the 1st room from east located at apt 1a, 1st story, 1st apartment from west at north
Jul 16, 2025 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures electrical supply to all storys at public hall stairs
Jul 16, 2025
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt 2b, 2nd story, 1st apartment from south at west
Jul 16, 2025 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt 1a, 1st story, 1st apartment from west at north
Jul 16, 2025 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at celler at boiler room
Jul 16, 2025
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Jul 15, 2025
Closed — Violation closed - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at ceiling at public hall, 1st story
Jul 15, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Jul 15, 2025 · Apt 1A
Open — Not complied with - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Jul 15, 2025 · Apt 1A
Closed — Violation closed
DOB building violations · 52
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active
Show 40 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 17, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 25, 2020
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 5, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 27, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 19, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 24, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 29, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Construction other optional
Stop all work except to make site safe contact bklyn boro. comm. offic e at 718 802-3677
Aug 22, 2016
Dob violation - active - Construction other optional
False pw1 job # 320979303
Feb 11, 2016
Dob violation - active - Construction other optional
False pw1 job # 321204228
Feb 11, 2016
Dob violation - active - Construction other optional
False pw1 job # 320561922
Feb 11, 2016
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 9, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 9, 2015
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 9, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 9, 2015
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 9, 2015
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 9, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 9, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 9, 2015
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 26, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Construction other optional
Stop all work make site safe, obtain a permit. contact this office @ 718 802-3685 prior to returning to work
Apr 7, 2011
Vw-violation work without permit - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - active
ECB violations · 68
- Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. no certificate of correction on file for vio#39130147n as of 4/21/20026., file a certificate
Apr 21, 2026 · Penalty $1,280
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. no certificate of correction on file for vio#39130149r as of 4/21/2006., file a certificate
Apr 21, 2026 · Penalty $1,280
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings.no certificate of correction on file for vio#39130150y as of 4/21/20026., file a certificate
Apr 21, 2026 · Penalty $1,280
Active - Class - 3
I observed in basement boiler room several gas water heaters installed and no permits on file for any work performed.. work was 100% performed at time of inspection, obtain permit or restore premises to prior l
Nov 22, 2024
Resolve - Class - 2
Upon inspection observed new electrical work was done w/o permit at cellar level. wiring for approx. 3-new hot water heaters and 3-new boilers installed for the 3-story/6-fam. dwelling bldg. as per dob records
Nov 13, 2024 · Penalty $1,250
Active - Class - 2
Upon inspection observed new plumbing work was done w/o permit at cellar level. plumbing lines for approx. 3-new hot water heaters and 3-new boilers installed for the 3-story/6-fam. dwelling bldg. as per dob re
Nov 13, 2024 · Penalty $1,250
Active - Class - 1
Upon inspection observed, failure to maintain building in code-compliant manner. at cellar level, ceilings at various locations throughout are open and exposing wooden floor joist above. creating a hazardous co
Nov 13, 2024 · Penalty $625
Active - Class - 2
Upon inspection observed, failure to maintain building in code-compliant manner: use of prohibited door and/or hardware per bc 1008.1. (2014 code); 27-371; bc 1008.1.9 (2014 code); bc 1010.1.8 (2022 code bc 101
Nov 13, 2024 · Penalty $625
Active - Class - 1
Upon inspection observed, failure to maintain building in code-compliant manner. at cellar level between the boiler room entry door and old oil tank. floor joist supporting the 1flr. for apt. 1b, is in state of
Nov 13, 2024 · Penalty $1,250
Active - Class - 1
Upon inspection observed, failure to maintain building in code-compliant manner. at apt.1b, bathroom and closet ceiling is the state of disrepair due to sheetrock ceiling has collapsed from a bathroom leak comi
Nov 13, 2024 · Penalty $1,250
Active
Show 40 more ↓
- Class - 2
Atoi, observed in unlocked basement, 3 old disconnected boilers and old disconnected hot water heater. boiler room had new hot water heaters with manufacture date 03 jan 2024. dob now shows no recent laa / pl /
Jan 24, 2024
Resolve - Class - 2
Failure to comply w/commissioner's order contained in summons/v35542611n issued11/20/20&to file c/c pursuant to28-201.1&1rcny102-01.comply w/commissioner's order &/or file c/c.
Apr 21, 2021 · Penalty $3,125
Resolve - Class - 1
Failure to maintain walls &/or appurtenances.note:@ exp1 observed stepcracks throughout entire front brick/mortar facade in various locations.previous ecb#35502796m.maintain exterior bldg.
Nov 20, 2020 · Penalty $6,250
Active - Class - 1
Reissue ecb#35465363r failure to maintain bldg walls or appurtenances.noted: at exp#1 observed step cracks throughout front facade wall in various locations. remedy: maintain exterior bldg walls.
Sep 2, 2020 · Penalty $6,250
Active - Class - 1
Failure to maintain bldg walls or appurtenances. noted: at exp#1 step cracks at various areas including the parapet. some facade cracks ranges from 1/4" to 1/2" wide. step cracks also observed at exp#3&4 cellar
Jan 27, 2020 · Penalty $6,250
Active - Class - 1
Failure to maintain bldg walls or appurtenances. observed at exp#1 thefacade including the parapet wall has large step cracks in various areas. the right side of the parapet is bulging out into the driveway bel
Nov 15, 2019 · Penalty $6,250
Active - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35433680y issued on 06-25-2019 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maintain bl
Sep 6, 2019
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances. note: at exp#1 between 3rd fl & parapet wall observed several step cracks/spalling bricks & missing mortar at various locations. also at exp#1 observed directly
Sep 6, 2019 · Penalty $6,250
Active - Class - 1
Failure to maintain bldg walls or appurtenances. noted: at exp#1,running step cracks from the 3rd fl to the parapet wall. also observed new cracks stating to form in various areas throughout the facade,at exp#1
Jun 25, 2019 · Penalty $6,250
Active - Class - 1
Failure to maintain bldg walls or appurtenances. noted: at exp#1 observed multiple vertical step cracks from parapet to 3 fl window with 1/4to 1/2 gaps in cracks. previous ecb#35375843r. remedy: maintain exteri
May 4, 2019 · Penalty $25,000
Active - Class - 1
Failure to maintain building wall(s) or appurtenances.noted:at exposure one (front of building) 3 story building hasvertical cracks from perapet down to 3rd story windows brick work has 1.4 to 1.2 inch gaps in
Mar 4, 2019
Resolve - Class - 2
Failure to comply w/comm's order contained in summ/vio#35116197p issued on 06/11/15 and to file a cofc pursuant to 28-201.1 and 1rcny102-01.no compliance recorded for failure to maintain at cellar.rem:comply w/
Dec 12, 2017 · Penalty $800
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35116197p issued on 06/11/16 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Oct 31, 2017 · Penalty $800
Resolve - Class - 2
Failure to maintain builiding in coe compliant manner.failue to complywith the commissioner order contained in summons/violation#35116197p issued on 06/11/15 and to file a certificate of correction pursuant to
Sep 23, 2017 · Penalty $800
Resolve - Class - 2
Failure to maintain bldg in code compliant manner failure to comply w/the comm's order contained in summons/vio #35116197p issued on 06/11/15 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01.r
Aug 7, 2017 · Penalty $800
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35116197p issued on 06/11/15 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
May 2, 2017 · Penalty $800
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation#35116197p issued on 06/11/15 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for missing fire stopping
Mar 18, 2017 · Penalty $2,000
Resolve - Class - 2
Failure to maintain bldg in a code complaince manner. note: the front facade of the bldg brick work os cracked. vertical cracks along the parapet wall & along the windows on the 3rd fl & cracks over the window
Feb 12, 2017
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation#35116197p issued on 06/11/15 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maintain bldg
Feb 3, 2017 · Penalty $800
Resolve - Class - 2
Failure to comply w/the comm's order contained in nov #35116197p issued on 06/11/15 & to file a c of c pursuant to 28-201.1;28-204.4 & 1rcny102-01. no c of c filed. remedy: comply w/comm's order &/or file a c o
Dec 23, 2016 · Penalty $800
Resolve - Class - 2
Failure to comply w/the comm's order contained in nov #35116197p issued on 06/11/15 & to file a c of c pursuant to 28-201.1;28-204.4 & 1rcny102-01. remedy: comply w/comm's order &/or file a c of c.
Nov 12, 2016 · Penalty $800
Resolve - Class - 1
Failure to comply with the commissioner's order contained in nov#35116197pissued on 6/11/15 &to file a certificate of correction pursuant t o 28-201.1,28-204.4 &1rcny 102-01.for electrical work @cellar as per u
Sep 17, 2016
Resolve - Class - 2
B265,50. 50-as per class 2 (b265) 28-303.7. failure to file a complete boiler inspection report. as per dob records and submit a current b09 report.
Sep 16, 2016
Resolve - Class - 2
Failure to comply w/the comm's order contained in nov #35116197p issued on 06/11/15 & to file a c of c pursuant to 28-201.1;28-204.4 & 1rcny102-01. note: no document filed for failure to maintain bldg in code
Jul 21, 2016 · Penalty $800
Resolve - Class - 1
Sec. 406.6.2.1 gas being supplied to bldg w/inspection or certifications. misc violation-observed on 2/23/16 at 4pm in bst/cellar boiler room. gas boiler on w/gas supplied from meter 2r apt-no inspection or gas
Feb 23, 2016 · Penalty $1,000
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner:service equipment & boiler.@the time of insp @the above date @approx 2:30pm i observed thefollowing apts w/no heat 1a,2b,1b.bldg marshal was @blgd perviously &
Feb 18, 2016 · Penalty $1,000
Resolve - Class - 2
Sec. 3307.6 sidewalk shed does not meet code specification. noted: shed not illuminated @ time of inspections. remedy: conform to code specification.
Jan 19, 2016 · Penalty $1,200
Active - Class - 1
Unapproved/unsafe/unsuitable electrical equipment apparatus,materials,devices,appliances or wiring in use. outlet is not provided to ser unit roof bx not terminated ac unit roof. disconnect is not provided for
Dec 14, 2015 · Penalty $400
Resolve - Class - 1
Electrical work w/o a permit. 3 ac unit central on roof. remedy: obtain permit.
Dec 14, 2015 · Penalty $800
Resolve - Class - 1
Failure to maintain bldg in a code compliant manner. no fire stopping per bc 712.3;27-345. observed cellar ceiling missing approx 40% of wallboard exposing wood structural beams to potential fire. no constructi
Dec 9, 2015 · Penalty $250
Resolve - Class - 2
Work does not conform to approved construction documents & or approvedamendments. observed 2 workers engaged in electrical work in the cellar. active permit #320561922 issued 11-18-15 expires 9-10-16. permit #
Dec 9, 2015
Resolve - Class - 1
Failure to provide unobstructed exit passageway. noted: passageway @ 3rd fl landing,leading @ stairwell to roof exit door is obstructed w/boxes,tire rims,bicycle w/no clear path to roof for occuply bldg.
Dec 8, 2015 · Penalty $400
Resolve - Class - 1
Sec. 1510(l) egress from fire escape balconies not to be obstructed. noted: at rear corner yard,fire escape drop ladder is obstructed by placement of a/c units directly underneath drop ladder,preventing ladder
Dec 8, 2015 · Penalty $1,600
Resolve - Class - 1
Failure to maintain bldg in a code compliant manner: floor numbering signs missing &/or defective per bc 1019.1.7 noted: there are no numerical floor designations in this 3 sty walk up apt bldg. most of the apt
Dec 8, 2015 · Penalty $250
Resolve - Class - 1
Sec. 908.7 defective carbon monoxide smoke detectors. noted: several carbon monoxide smoke defector are not connected to their hard wired electric source. each of this 3 sty walk up apt bldg's landing is missin
Dec 8, 2015 · Penalty $1,600
Resolve - Class - 2
Work does not conform to approved construction documents. noted: at time of inspection,installation of sidewalk shed does not conform to approved plans on exp#2,plans do not show adjustable upright shed post or
Dec 8, 2015 · Penalty $250
Resolve - Class - 1
Work w/o permit. noted: installation of there 3 hvac condunsing unit of roof of mentioned bldg. thse conducting units are not installed as per code requirements. plans & equipment use permits are to be filed &
Dec 8, 2015 · Penalty $800
Resolve - Class - 1
Failure to maintain exterior bldg walls on appurtenances. note: structural horizontal & vertical cracks develop on exterior front facade exp#1 at 2nd & 3rd sty around window lintels & at various. remedy: comply
Nov 30, 2015 · Penalty $250
Active - Class - 2
Failure to comply w/the comm's order contained in nov #35116196n issued on 6/11/15 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Oct 14, 2015
Resolve - Class - 2
Failure to comply w/the comm's order contained in nov #35116257h issued on 6/9/15 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Oct 14, 2015 · Penalty $800
Resolve
Complaints
- Heat/hot water
Apartment only
Oct 19, 2026 · Apt 1A
Close - Paint/plaster
Ceiling
Oct 19, 2026 · Apt 1A
Open - Heat/hot water
Apartment only
Oct 6, 2026 · Apt 1A
Close - Paint/plaster
Wall
Oct 6, 2026 · Apt 1A
Close - Door/window
Door
Oct 6, 2026 · Apt 1A
Close - Flooring/stairs
Floor
Oct 6, 2026 · Apt 1A
Close - Unsanitary condition
Pests
Oct 6, 2026 · Apt 1A
Close - Plumbing
Toilet
Oct 6, 2026 · Apt 1A
Close - Paint/plaster
Wall
Oct 6, 2026 · Apt 1A
Close - Electric
Lighting
Oct 6, 2026 · Apt 1A
Close
Show 40 more ↓
- Paint/plaster
Wall
Oct 6, 2026 · Apt 1A
Close - Flooring/stairs
Floor
Oct 6, 2026 · Apt 1A
Open - Paint/plaster
Ceiling
Oct 6, 2026 · Apt 1A
Open - Unsanitary condition
Sewage
Sep 5, 2026 · Apt 2B
Close - Plumbing
Bathtub/shower
Sep 5, 2026 · Apt 2B
Close - Plumbing
Bathtub/shower
Jun 13, 2026 · Apt 480EAS
Close - Heat/hot water
Apartment only
Jun 13, 2026 · Apt 480EAS
Close - Plumbing
Bathtub/shower
Jun 13, 2026 · Apt 2B
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Jan 27, 2026 · Apt 2B
Close - Heat/hot water
Entire building
Jul 15, 2025 · Apt 1A
Close - Electric
Power outage
Jul 15, 2025 · Apt 1A
Close - Heat/hot water
Entire building
Jul 15, 2025 · Apt 1A
Close - Electric
Power outage
Jul 15, 2025 · Apt 1A
Close - Plumbing
Water supply
Jul 15, 2025 · Apt 1B
Close - Heat/hot water
Apartment only
Jul 15, 2025 · Apt 2B
Close - Appliance
Refrigerator
Jul 15, 2025 · Apt 2B
Close - Appliance
Electric/gas range
Jul 15, 2025 · Apt 2B
Close - General
Cooking gas
Jul 15, 2025 · Apt 1B
Close - Appliance
Electric/gas range
Jul 15, 2025 · Apt 1B
Close - Paint/plaster
Wall
Jul 15, 2025 · Apt 1B
Close - Plumbing
Toilet
Jul 15, 2025 · Apt 1B
Close - Flooring/stairs
Floor
Jul 15, 2025 · Apt 1B
Close - Door/window
Door frame
Jul 15, 2025 · Apt 1B
Close - Heat/hot water
Apartment only
Jul 15, 2025 · Apt 1B
Close - Heat/hot water
Apartment only
Jun 27, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Jun 26, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Jun 24, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Jun 20, 2025 · Apt 2B
Close - Appliance
Electric/gas range
Jun 12, 2025 · Apt 2B
Close - Appliance
Refrigerator
Jun 12, 2025 · Apt 2B
Close - Appliance
Electric/gas range
Jun 12, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Jun 12, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Jun 6, 2025 · Apt 2B
Close - General
Mailbox
Jun 6, 2025 · Apt 2B
Close - Plumbing
Radiator
Apr 23, 2025 · Apt 2B
Close - Door/window
Window frame
Feb 17, 2025 · Apt 2B
Close - General
Bell/buzzer/intercom
Feb 17, 2025 · Apt 2B
Close - Appliance
Electric/gas range
Feb 10, 2025 · Apt 2B
Close - Appliance
Electric/gas range
Feb 10, 2025 · Apt 2B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1930
- Floors
- 3
- Residential units
- 6
- Building area
- 5,520 ft²
- Lot area
- 3,333 ft²
- Zoning
- R6
- Community board
- 317
- Council district
- 41
- Block / lot
- 4690 / 61
- Assessed value
- $331,200
- Landmark / historic district
- No
HPD registration #305663, last renewed Oct 31, 2023.
Questions about 480 East 94 Street
Who owns 480 East 94 Street?
The owner of record in NYC Department of City Planning PLUTO data is Aree Group LLC.
Does 480 East 94 Street have violations?
Yes. NYC HPD has recorded 1,043 housing violations at this property.
Is 480 East 94 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 480 East 94 Street built?
City records list 1930 as the year it was built.
How many apartments are in 480 East 94 Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.