1051 Linden Boulevard
Brooklyn, NY 11212BBL 3-04689-0020Map
Owner of record: Lahens, Frantz
1051 Linden Boulevard is a two-family home built in 1960 in Brooklyn, 11212. It has 2 residential units across 3 floors. The owner of record is Lahens, Frantz. HPD has recorded 66 housing violations here, most recently on March 23, 2025. 38 of the 50 most recent violations are still open.
- HPD violations
- 66
- DOB violations
- 0
- ECB violations
- 1
- HPD complaints
- 38
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 66
- BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at south and east wall in the 1st room from east at south located at apt 1, 1st story, 1st apartment from west at north original violation 17779176 issued 23-mar-25 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Mar 23, 2025 · Apt 1
Open — Defect letter issued - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at south wall at public hall, 2nd story
Mar 23, 2025
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at south and east wall in the 1st room from east at south located at apt 1, 1st story, 1st apartment from west at north
Mar 23, 2025 · Apt 1
Closed — Violation closed - BHazardous
Properly secure the loose wood balasters, total of (3) at public hall stairs, 1st story
Mar 23, 2025
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at all electric outlets in the kitchen located at apt 1, 1st story, 1st apartment from west at north
Mar 23, 2025 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood riser 1st from bottom up at public hall stairs, 1st story
Mar 16, 2025
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling and all walls throughout in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Mar 16, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling at public hall, 3rd story
Mar 16, 2025
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 3rd story
Mar 16, 2025
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in waste line at bathtub in the bathroom located at apt 3, 3rd story, 1st apartment from west at north
Mar 16, 2025 · Apt 3
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from north at west located at apt 3, 3rd story, 1st apartment from west at north
Mar 16, 2025 · Apt 3
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective glass pane at the upper sash window in the 4th room from north at east located at apt 3, 3rd story, 1st apartment from west at north
Mar 16, 2025 · Apt 3
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees f at all hot water fixtures at kitchen and bathroom in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Mar 16, 2025 · Apt 3
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective bluster 5th from top at public hall stairs, 2nd story
Mar 16, 2025
Open — Nov sent out - BHazardous
Properly secure the loose balusters 3rd 4th and 5th from top at public hall stairs, 1st story
Mar 16, 2025
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the closet in the 1st room from north at west located at apt 1, 1st story, 1st apartment from west at north
Mar 16, 2025 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor approximately 6 sq.ft in the 4th room from north located at apt 1, 1st story, 1st apartment from west at north
Mar 16, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the north wall in the 1st room from north at west located at apt 1, 1st story, 1st apartment from west at north
Mar 16, 2025 · Apt 1
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 20 sq. ft. at north wall in the 1st room from north at west located at apt 1, 1st story, 1st apartment from west at north
Mar 16, 2025 · Apt 1
Open — First no access to re- inspect violation - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the closet in the 1st room from north at west located at apt 1, 1st story, 1st apartment from west at north
Mar 16, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at all walls and ceiling in the entire apartment located at apt 22ndfl, 2nd story, 1st apartment from south at west
Mar 10, 2025 · Apt 22NDFL
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mortice lock on door in the entrance located at apt pvt, 1st story, 1st apartment from west at north
Mar 9, 2025 · Apt PVT
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the 2nd room from east located at apt pvt, 1st story, 1st apartment from west at north
Mar 9, 2025 · Apt PVT
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective counter balance lower window sash in the 2nd room from east at south located at apt pvt, 1st story, 1st apartment from west at north
Mar 9, 2025 · Apt PVT
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 3rd story
Mar 9, 2025
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures and light in the entire apartment located at apt pvt, 1st story, 1st apartment from west at north
Mar 9, 2025 · Apt PVT
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 2nd room from east located at apt pvt, 1st story, 1st apartment from west at north
Mar 9, 2025 · Apt PVT
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at all walls and ceiling in the 1st room from east at south located at apt pvt, 1st story, 1st apartment from west at north
Mar 9, 2025 · Apt PVT
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at all walls and ceiling in the 1st room from east at south located at apt pvt, 1st story, 1st apartment from west at north original violation 17747750 issued 09-mar-25 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Mar 9, 2025 · Apt PVT
Open — Defect letter issued - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall at intermediate landing at public hall stairs, 1st story
Mar 6, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at east wall at intermediate landing at public hall stairs, 1st story
Mar 6, 2025
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling and all walls in the entire apartment located at apt 2fl, 2nd story, 1st apartment from south at west
Mar 6, 2025 · Apt 2FL
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees f at all hot water fixtures at kitchen and bathroom in the entire apartment located at apt 2fl, 2nd story, 1st apartment from south at west
Mar 6, 2025 · Apt 2FL
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2fl, 2nd story, 1st apartment from south at west
Mar 6, 2025 · Apt 2FL
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of hot water exceeds maximum temp of 130 degrees in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Mar 5, 2025 · Apt 2
Closed — Violation closed - CImmediately hazardous
§ 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Mar 5, 2025 · Apt 2
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at south wall at public hall, 1st story
Mar 5, 2025
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at all wall outlets and all ceiling fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Mar 5, 2025 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall at public hall, 1st story
Mar 5, 2025
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 17, 2024
Open — Info nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling in the 1st room from east located at apt 1, 1st story, 1st apartment from east at south
Oct 16, 2024 · Apt 1
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures electrical light fixture at ceiling in the 2nd room from east located at apt 1, 1st story, 1st apartment from east at south
Oct 16, 2024 · Apt 1
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures electrical light fixture at ceiling in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Oct 16, 2024 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Oct 16, 2024 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Oct 16, 2024 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling throughout in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Oct 16, 2024 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lock assembly at gate to building entrance door , 1st story
Oct 16, 2024
Open — Nov sent out - BHazardous
Replace with new the missing mortise lock at door at building entrance , 1st story
Oct 16, 2024
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Oct 16, 2024 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Oct 16, 2024 · Apt 1
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 1
- Class - 2
Illegal use in a residential district. noted: at the time of inspection, observed at exposure 1 in the yard a black infiniti without plates is illegally parked/stored, this is an r6 general residence district.
Sep 24, 2025 · Penalty $6,250
Active
Complaints
- Unsanitary condition
Mold
Mar 19, 2025 · Apt 1
Close - Flooring/stairs
Stairs
Mar 19, 2025 · Apt 1
Close - Flooring/stairs
Stairs
Mar 19, 2025 · Apt 1
Close - Electric
No lighting
Mar 17, 2025 · Apt 1
Close - Heat/hot water
Apartment only
Mar 15, 2025 · Apt 3
Close - Water leak
Heavy flow
Mar 15, 2025 · Apt 3
Close - Door/window
Window frame
Mar 15, 2025 · Apt 3
Close - Unsanitary condition
Mold
Mar 15, 2025 · Apt 3
Close - Door/window
Door
Mar 15, 2025 · Apt 1
Close - Flooring/stairs
Stairs
Mar 15, 2025 · Apt 1
Close
Show 28 more ↓
- Flooring/stairs
Stairs
Mar 15, 2025 · Apt 1
Close - Flooring/stairs
Floor
Mar 15, 2025 · Apt 1
Close - Unsanitary condition
Mold
Mar 15, 2025 · Apt 1
Close - Water leak
Slow leak
Mar 15, 2025 · Apt 1
Close - Electric
Power outage
Mar 10, 2025 · Apt 22NDFL
Close - Heat/hot water
Apartment only
Mar 10, 2025 · Apt 22NDFL
Close - Water leak
Slow leak
Mar 5, 2025 · Apt PVT
Close - Door/window
Door
Mar 5, 2025 · Apt PVT
Close - Flooring/stairs
Stairs
Mar 5, 2025 · Apt PVT
Close - Outside building
Roofing
Mar 5, 2025 · Apt PVT
Close - Door/window
Window frame
Mar 5, 2025 · Apt PVT
Close - Unsanitary condition
Mold
Mar 5, 2025 · Apt PVT
Close - Unsanitary condition
Mold
Mar 5, 2025 · Apt PVT
Close - Flooring/stairs
Floor
Mar 5, 2025 · Apt PVT
Close - Electric
Outlet/switch
Mar 5, 2025 · Apt PVT
Close - Electric
Power outage
Mar 5, 2025 · Apt 2FLOOR
Close - Heat/hot water
Entire building
Mar 5, 2025 · Apt 2FLOOR
Close - Electric
Power outage
Mar 3, 2025 · Apt 1
Close - Heat/hot water
Entire building
Mar 3, 2025 · Apt 1
Close - Heat/hot water
Entire building
Oct 21, 2024 · Apt 3
Close - Heat/hot water
Entire building
Oct 17, 2024 · Apt 3
Close - General
Cooking gas
Oct 17, 2024 · Apt 3
Close - Heat/hot water
Entire building
Oct 15, 2024 · Apt 1
Close - Heat/hot water
Apartment only
Dec 4, 2019 · Apt 2NDFL
Close - Heat/hot water
Apartment only
Nov 19, 2019 · Apt 2FL
Close - Heat/hot water
Entire building
Nov 16, 2019 · Apt 2
Close - Heat/hot water
Entire building
Nov 9, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 4, 2019 · Apt BLDG
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Sep 23, 2026 | $400,000 | Two family dwellings | 2 |
Building details
- Building type
- Two-family home (B1)
- Year built
- 1960
- Floors
- 3
- Residential units
- 2
- Building area
- 2,862 ft²
- Lot area
- 2,314 ft²
- Zoning
- R6
- Community board
- 317
- Council district
- 41
- Block / lot
- 4689 / 20
- Assessed value
- $52,200
- Landmark / historic district
- No
Questions about 1051 Linden Boulevard
Who owns 1051 Linden Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is Lahens, Frantz.
Does 1051 Linden Boulevard have violations?
Yes. NYC HPD has recorded 66 housing violations at this property.
Is 1051 Linden Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1051 Linden Boulevard built?
City records list 1960 as the year it was built.
How many apartments are in 1051 Linden Boulevard?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.